GNLP0172

Showing comments and forms 1 to 3 of 3

Comment

Draft Local Plan-Part 2 Site Allocations

Representation ID: 21569

Received: 16/03/2020

Respondent: Anglian Water Services Ltd

Representation Summary:

Unlike other allocation policies there is no reference to water efficiency forming part of the design of this student accommodation.

Please also see comments relating to Policy 2 of the Sustainable Communities of the Strategy document.

Full text:

Unlike other allocation policies there is no reference to water efficiency forming part of the design of this student accommodation.

Please also see comments relating to Policy 2 of the Sustainable Communities of the Strategy document.

Support

Draft Local Plan-Part 2 Site Allocations

Representation ID: 22267

Received: 16/03/2020

Respondent: Carter Jonas LLP

Number of people: 2

Representation Summary:

Taylor Wimpey East Anglia control land to the west of Green Lane West in Rackheath. The site is identified as a preferred allocation in GNLP for up to 200 dwellings. This allocation is supported and should be retained.
An outline planning application for 205 dwellings has been submitted for the promoted development (Ref. 2017/2208). This site is has a resolution to grant planning permission and the S106 Agreement has been signed. The decision on the application demonstrates that the site is suitable for the promoted development, that proposed mitigation measures can address any significant constraints associated with the development, and conditions can be used to make the development acceptable. The site is controlled by a housebuilder and is deliverable.
The Taylor Wimpey East Anglia representations to the Regulation 18 Growth Strategy consultation in March 2018 requested amendments to the assessment of the site in the HELAA, and in particular to those topics that scored ‘amber’. The topics that scored ‘amber’ and should be amended to ‘green’ relate to access, access to services, utilities capacity, contamination, flood risk, significant landscapes, and compatibility with neighbouring uses.
Page 10 of 10
The proposed development is deliverable and would contribute to the five year housing land supply. The timetable for the delivery of development is as follows:
• Reserved Matters to be submitted in July 2020
• Reserved Matters to be approved in December 2020
• Start on site is expected in January 2022
• First homes to be completed in July 2022
• Annual housing delivery rate of 60 dwellings per annum
In conclusion, it is requested that land to the west of Green Lane West (Ref. GNLP0172) is retained as an allocation in draft GNLP.

Full text:

On behalf of my client, Taylor Wimpey Strategic Land, please find attached representations relating to Land South of Townhouse Road, Costessey, and Green Lane West, Rackheath.

Object

Draft Local Plan-Part 2 Site Allocations

Representation ID: 22601

Received: 16/03/2020

Respondent: Historic England

Representation Summary:

We welcome the reference to Rackheath Hall and the need for open space to be provided in the land to the west of the A1270. This requirement should be included in the policy

Suggested Change:
Amend policy to state that land to the west of the A1270 should only be used for open space to conserve and where opportunities arise enhance the significance of the grade II listed Rackheath Hall and bridge.

Full text:

For full representation, please refer to attached documents