Question 14: Do you support, object or wish to comment on the approach for housing numbers and delivery?

Showing comments and forms 31 to 60 of 80

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21823

Received: 12/03/2020

Respondent: Barford Parish Council

Representation Summary:

• As said above (see attached for full submission), and as highlighted by the CPRE response, the use by Government of the outdated 2014 National Household Projections is leading to unnecessary land allocation for housebuilding.
• Barford and Wramplingham Parish Council wish to see land already allocated for house building used up before any new allocated land is used, with a focus on brownfield sites first – we are pleased to see this has recently happened in Barford.
• Barford and Wramplingham Parish Council do not understand why more land is set to be allocated when the 2016 projections of housing need to 2038 will be met by the area of sites currently allocated as stipulated in the CPRE response.

Full text:

Please see attached for full submission

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21849

Received: 12/03/2020

Respondent: Hempnall Parish Council

Representation Summary:

Paragraph 145 claims that the strategy ‘is informed by consultation feedback’, yet chooses to ignore much from previous consultations even where such feedback was significantly in favour of a particular approach. An example of this is the position taken towards windfalls. Responses to the Stage A Regulation 18 Site Proposals and Growth Options consultation were significantly against (110 to 45) counting windfalls in addition to the additional (at that point 7,200) housing, and yet this has been ignored in the current draft plan consultation. By not counting windfalls in the calculation for housing numbers in table 6, there will be a resulting over-supply of houses, particularly if the out-of-date 2014 National Housing Projections are used. Windfalls are acknowledged as a reliable source of new housing and many Local Authorities do count them towards their housing targets: their contribution towards housing targets in the GNLP should lead to a reduction in the number of new sites which are allocated.

Hempnall Parish Council also has specific concerns about the approach for housing numbers in the South Norfolk Village Clusters, as there is no total figure given for this new housing, but instead an open-ended ‘minimum of 1,200 homes’. This use of the word “minimum” needs to be removed and replaced by a “maximum” total, so that further potential over-supply is avoided. At best, the actual delivery of new housing in the plan area has only occasionally exceeded 2,000 dwellings per annum, with 1,500 being more typical. At this build-rate, current commitments cover actual housing need to 2038.

Hempnall Parish Council wants to see sites allocated for housing in the existing plan (JCS) developed before any new sites that are likely to be added in to the emerging GNLP are built out. New site allocations for housing should be treated as phased development and these sites should not be built out until the current JCS sites have been used up. We think this is a sensible approach because not only does it protect the countryside, but also at current rates of house building there is enough land already allocated in the JCS to cater for the building that is likely to occur over the new Plan period.

There is very little evidence to show that increasing the amount of land on which houses can be built actually increases the rate at which they are built. All that happens is that developers ‘cherry-pick’ the most profitable sites, which are likely to be the newly allocated green field sites and that this will lead to even more land banking of currently allocated sites. This will also mean that many less sustainable sites for housing are developed rather than those with more sustainable locations. This would result in more pollution and congestion, with the negative consequences for the climate and climate change. It also means that expensive infrastructure which has been provided to facilitate new housing in the existing plan, could end up being an irrelevant and embarrassing white elephant.

It is disappointing that there is no mention of phasing as an option within the consultation document, as this would help to prevent the worst excesses of unnecessary development. Hempnall together with a total of 68 Parish and Town Councils in Broadland and South Norfolk (over 37%)have supported CPRE Norfolk on this issue and have signed a pledge to this effect, which was included in the previous consultation, but ignored in the current draft Plan. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward. Clearly there is a democratic deficit: meaningful consultation should not ignore this volume of common-sense opinion.

Full text:

Please see attached for full submission

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21904

Received: 12/03/2020

Respondent: Home Builders Federation

Representation Summary:

Housing needs and supply
In arriving at the local housing needs assessment (LHNA) for the Greater Norwich area the Councils have used the annual household growth between 2019 and 2029. Whilst we recognise that the Government states that the current year should be the base date from which to assess needs if the Councils wish to start their plan from 2018 then it would be logical for the base period of the assessment of household growth to be the 2018 to 2028 period. This would result in a LHNA of 41,040. Slightly higher than the 40,550-figure suggested by the Council.
It will also be necessary for the Council to liaise with neighbouring areas to ensure that they are meeting their housing needs and that they will not need to deliver additional units in line with paragraph 60 of the NPPF. The Council will also need to consider whether the proposed level of housing delivery will support the Councils’ jobs growth expectations. Planning Practice Guidance outlines that there will be circumstances where it will be necessary to consider whether housing need is actually higher than the stand method indicates. One such circumstances is where there are growth strategies for the area. The Greater Norwich Local Plan seeks to deliver an additional 33,000 jobs over the plan period and it will be necessary for the Council to ensure that its proposed housing requirement is sufficient to support the level of jobs growth anticipated.
It is also unclear as to whether the GNLP will ensure the delivery of sufficient homes to meet the targets established in the City Deal. This committed the Greater Norwich authorities to delivering 37,000 between 2008 to 2026. The Authority Monitoring Reports (AMR) for the Greater Norwich area indicate that between 2008/09 and 2018/19 some 18,287 new homes were delivered. Th is leaves a further 18,722 left to deliver by 2026. On the basis of the proposed requirement of 2,027 dpa there will be a shortfall of circa 6,500 homes. It will therefore be important that the Councils seek to ensure that there are sufficient sites allocated in GNLP that can deliver homes in the first five years post adoption to meet the commitments in the City Deal.
With regard to the delivery of new homes to meet needs we welcome the Councils’ decision to include a buffer of 9%. In addition, we note that the Council has not included
any windfall within its assessment of supply which will also provide an additional buffer. We note that a contingency site has been included at Costessey. Whilst we have no objections to its inclusion it would be sensible to include some smaller sites as contingency that could be brought forward more quickly should any of the larger sites not come forward as expected.

Full text:

Please find attached the HBF’s comments on the GNLP.

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21929

Received: 13/03/2020

Respondent: Mr Eric Hall

Representation Summary:

(Representation on behalf of Marstons Estates Ltd)

Please see attached for full comments
We support the overall growth strategy of the Plan and consider that Diss is appropriately identified as a main town to which significant additional development can be directed.

The site allocations plan does not include any allocation for the subject site and the writer therefore infers that the DIS 6 allocation is effectively removed, leaving the site as unallocated land albeit within a defined settlement boundary; moreover as noted above Diss is considered a suitable location for significant development. If the site were to come forward subsequent to the plan it would be considered a windfall; under Policy 1 this would be acceptable in principle at appropriate scales and locations where they would not have a negative impact on the character and scale of the settlement and subject to other local plan policies.

On this basis we support Policy 1 and do not oppose the removal of DIS 6.

Full text:

Please find attached representations on behalf of Marston’s Estates Ltd.
INTRODUCTION
We act on behalf of Marston Estates Ltd, owners of land to the rear of the Thatcher's Needle public house, Park Road, Diss. Marsyons Estates welcomes the opportunity to comment on the draft strategy and site allocation plan.

BACKGROUND
The site comprises the residue of undeveloped land mainly to the rear of the Thatcher's Needle public house, which was built and is now operated by Marstons. The site is currently part of site allocation DIS 6 in the Site Specific Allocations and Policies DPD adopted in 2015. For convenience the policy is reproduced below
Land amounting to some 1.76 hectares is allocated for retail (non-food goods), leisure,
offices (class A2 only), and housing, with any housing only constituting a small (no more
than 25% by area) proportion of the site.

The developers of the site will be required to ensure:

1. Retail use is limited to non-food goods;
2. Residential use is an integral part of a commercial development (with offices
limited to Class A2);
3. Provision of landscaping to screen the adjacent electricity sub-station;
4. Impacts on TPO trees on Park Road are taken into account;
5. Scheme design takes into account adjacent Conservation Area;
6. Potential for contamination on the site is assessed (and managed appropriately if
any contamination found);
7. Contribution made towards green infrastructure provision at DIS 2 (including
habitat creation along the river)
8. Wastewater infrastructure capacity must be confirmed prior to development taking
place;
9. Norfolk Minerals and Waste Core Strategy Policy CS16 applies, as this site is
underlain by safeguarded mineral resources

PLANNING HISTORY

Outline permission was granted in 2011 for the erection of a 60 bed hotel, a restaurant/public house and associated parking on the site. Detailed consent was granted in 2012 for the restaurant/public house element and this has now been constructed and opened for use.

Permission was refused in 2016 for the erection of 4 No. non food retail units and the refusal supported on appeal on grounds relating to the impact on the conservation area, affect on trees and insufficient evidence being provided on retail policy issues.

A further application was made in 2017 (ref 2017/2053) proposing 3 retail units of 3164 sq m and a 27 bed hotel/lodge of some 745 sq m. The application was subject to long negotiation over the form and appearance of the proposal and its retail impact. Officers recommended refusal and it was refused on grounds of impact on the conservation area and retail impact.

The refusals of these schemes, which are acceptable in principle under the site allocation policy, have led to the owners considering that the adopted policy is moribund and accordingly welcome the opportunity to re-examine future uses for this site. A number of potential uses are being examined from both a planning and commercial perspective.

CONSULTATION PROPOSALS

We support the overall growth strategy of the Plan and consider that Diss is appropriately identified as a main town to which significant additional development can be directed.

The site allocations plan does not include any allocation for the subject site and the writer therefore infers that the DIS 6 allocation is effectively removed, leaving the site as unallocated land albeit within a defined settlement boundary; moreover as noted above Diss is considered a suitable location for significant development. If the site were to come forward subsequent to the plan it would be considered a windfall; under Policy 1 this would be acceptable in principle at appropriate scales and locations where they would not have a negative impact on the character and scale of the settlement and subject to other local plan policies.

On this basis we support Policy 1 and do not oppose the removal of DIS 6.

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21941

Received: 13/03/2020

Respondent: UEA Estates & Buildings

Agent: Bidwells

Representation Summary:

For reasons outlined in relation to Question 12, the UEA fully support the identification of the Norwich Urban Area as a location to accommodate additional growth.

Full text:

Please see attached for full submission

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21984

Received: 16/03/2020

Respondent: Ms Carol Sharp

Representation Summary:

Paragraph 146 claims that the strategy ‘is informed by consultation feedback’, yet chooses to ignore much from previous consultations even where such feedback was significantly in favour of a particular approach. An example of this is the position taken towards windfalls. Responses to the Stage A Regulation 18 Site Proposals and Growth Options consultation were significantly against (110 to 45) counting windfalls in addition to the additional (at that point 7,200) housing, and yet this has been ignored in the current draft plan consultation. By not counting windfalls in the calculation for housing numbers in table 6, there will be a resulting over-supply of houses, particularly if the out-of-date 2014 National Housing Projections are used. Windfalls are acknowledged as a reliable source of new housing and many Local Authorities do count them towards their housing targets: their contribution towards housing targets in the GNLP should lead to a reduction in the number of new sites which are allocated.

159 As previously mentioned in the introduction comment, use of the word “minimum” needs to be
removed and replaced by a “maximum” total.

164-4 We cant see how the growth in villages ‘will support local services’ rather it will be a drain on
them.

As previously mentioned sites in the existing plan (JCS) should be developed before any new sites that are likely to be added in to the emerging GNLP are built out. Although we understand that it will not be possible to prevent new sites being included in the plan, we are asking that these extra land allocations for housing are treated as phased development and that building should not occur on these sites until the current JCS sites have been used up. We think this is a sensible approach because not only does it protect the countryside, but also at current rates of house building there is enough land already allocated in the JCS to cater for the building that is likely to occur over the new Plan period.

As previously mentioned developers ‘cherry-pick’ the most profitable sites, which are likely to be the newly allocated green field sites and that this will lead to even more land banking of currently allocated sites. This will also mean that many less sustainable sites for housing are developed resulting in more pollution and congestion, with the negative consequences for the climate and climate change. It also means that expensive infrastructure which has been provided to facilitate new housing in the existing plan, could end up being an irrelevant and embarrassing white elephant.

It is disappointing that there is no mention of phasing as an option within the consultation document, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%) have signed a pledge to this effect, which was included in the previous consultation, but ignored in the current draft Plan. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward. Clearly there is a democratic deficit: meaningful consultation should not ignore this volume of common-sense opinion.

Full text:

Please see attached for full submission

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21993

Received: 13/03/2020

Respondent: Redenhall with Harleston Town Council

Representation Summary:

The Town Council supports the preferred option in Policy 1, (Sustainable Growth Strategy).

Full text:

please find attached the report which was agreed by resolution by Harleston Town Council on March 11th 2020.

Attachments:

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22020

Received: 15/03/2020

Respondent: Mulbarton Parish Council

Representation Summary:

As above MPC have concerns that there is no maximum number for clusters and notes that at the present build rate current commitments cover actual housing need until 2038. MPC do not understand why new areas have to be allocated when the current JCS sites have not all been used and has the potential to allow developers to cherry pick sites.

Full text:

Please see attached for full submission

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22035

Received: 13/03/2020

Respondent: East Suffolk Council

Representation Summary:

We support the Greater Norwich Local Plan’s preferred option to support growth, including the use of the Government’s standard methodology for assessing housing numbers and delivery, use of a settlement hierarchy, and approach to the economy. We are pleased the strategy for growth can meet the area’s need for housing, including a buffer, and need for employment land.

Full text:

The Council would like to take the opportunity to express its support for the Greater Norwich Local Plan Draft Strategy.

Section 1 – Introduction
Paragraph 15 refers to a plan period to 2036. This needs amending to 2038, as noted elsewhere in the document.

Section 2- Greater Norwich Spatial Profile
Paragraph 70 notes that the A146 forms part of the Government’s Major Road Network (MRN) of local non-trunk roads of national importance. East Suffolk is pleased that the importance of the A146 has been recognised as it is a key link between Lowestoft, Beccles and Norwich. The Suffolk County Transport Model (SCTM) – Preferred Option Traffic Forecasting Report (March 2018) notes that the A146 Norwich Road/Loddon Road and the A146 Norwich Road/A143 Yarmouth Road are two junctions that will reach 90-99% capacity by end of the Waveney Local Plan period, 2036. The two junctions are close to Beccles but fall within the South Norfolk Council/Greater Norwich area. Measures to address traffic issues on the A146 near Beccles are likely to be necessary in future reviews of Local Plans. (See page 36 of The Suffolk County Transport Model (SCTM) – Preferred Option Traffic Forecasting Report (March 2018) https://www.eastsuffolk.gov.uk/assets/Planning/Waveney-Local-Plan/Background-Studies/Suffolk-County-Council-Forecast-Highway-Modelling.pdf)

It may be of interest to the Greater Norwich Planning Policy Team to know that the Barnby Bends bypass Major Route Network improvement proposal has progressed to the next stage with funding to prepare an outline business case. Improvements to the section of the A146 near Barnby, commonly known as the Barnby Bends, would benefit the whole A146 route between Lowestoft and Norwich, and the A143 link to Diss and Bury St Edmunds.

Paragraph 73. The Norwich rail service provides direct access to Lowestoft. Please update the text to include Lowestoft in the list of rail destinations accessible from Norwich.

Section 3 – The Vision and Objective for Greater Norwich
Paragraph 108. The Council supports the overall vision and objectives of the Greater Norwich Local Plan.

Paragraph 111 would benefit from explaining what the term ‘clean growth’ means. The terms ‘clean growth’, ‘clean transport’, ‘clean pubic transport’, ‘clean energy’ and ‘clean water’ are used through the document without explanation. It should not be assumed the audience is already familiar with specific terms and jargon. The terms should be explained in the text or included in the glossary in Appendix 2.

Policy 1 – The Sustainable Growth Strategy
We support the Greater Norwich Local Plan’s preferred option to support growth, including the use of the Government’s standard methodology for assessing housing numbers and delivery, use of a settlement hierarchy, and approach to the economy. We are pleased the strategy for growth can meet the area’s need for housing, including a buffer, and need for employment land.

Policy 2 – Sustainable Communities
Issue No.2 in Table 8 would benefit from more specific and detailed information to facilitate electric and low-emission vehicles and their ancillary infrastructure needs. Developers should be encouraged to provide electric charging points for dwellings with on-plot parking spaces, and to provide ducting and electricity supply to communal and public parking spaces to enable future installation of charging points. This would complement policies for East Suffolk (contained in the adopted Waveney Local Plan and the emerging Suffolk Coastal Local Plan) on facilities for electric charging points, by enhancing provision in the wider network.

A Housing Design Audit for England by Place Alliance (see http://placealliance.org.uk/research/national-housing-audit/) found that lower building densities on projects away from the urban core scored poorly in design and there were clear benefits to designing at higher densities with the best schemes averaging 56 dwellings per hectare. This research may be of interest regarding the minimum densities specified in point 4 of the policy.

The Royal Town Planning Institute has produced detailed guidance on how developments can be designed to support people with dementia by creating familiar, legible, distinctive, accessible, comfortable and safe environments. The application of dementia friendly design principles is considered to result in a higher quality environment for all users. Considering the aging population in the Greater Norwich area, and the surrounding area, and rise in dementia, it is advisable to incorporate dementia friendly design principle where appropriate, especially in larger housing developments. (See https://www.rtpi.org.uk/media/1312/dementiatownplanning-practiceadvice2017.pdf) Issue No.7 in Table 8 would benefit from specifically referencing dementia friendly design principles. This would complement the policies in the adopted Waveney Local Plan and the emerging Suffolk Coastal Local Plan.

Overall, we support the approach of the sustainable communities policy and requirement for a sustainability statement.

Policy 3 – Environmental Protection and Enhancement
We support the approach to the built and historic environment as it is in accordance with the NPPF.

Policy 4 – Strategic Infrastructure
We support the approach in the Strategic Infrastructure policy.

Policy 5 – Homes
We are pleased that the Greater Norwich area can meet the housing need, including a buffer, as identified using the Government’s standard methodology, and support the approach in the Homes policy.

Policy 6 – The Economy
We support the approach in The Economy policy.

Policy 7.1 – The Norwich Urban Area including the fringe parishes
We support the approach in The Norwich Urban Area policy.

Policy 7.2 – The Main Towns
We support the approach in The Main Towns policy.

Policy 7.3 – The Key Service Centres
We support the approach in The Key Service Centres policy.

Policy 7.4 – Village Clusters
The Waveney Local Plan identifies Beccles and Bungay as two of the five Market Towns for housing growth in the former Waveney area. The total growth from homes built, existing commitments and allocations in the Waveney Local Plan for 2014-2036 are 1,458 dwellings for Beccles and Worlingham and 557 dwellings for Bungay. Both Beccles and Bungay boarder the South Norfolk/Greater Norwich area. Any housing development in villages close to the former Waveney area is highly likely to impact high schools, medical centres, shops and other services and facilities in Beccles and Bungay. Housing development in the wider South Norfolk area is highly likely to impact traffic on the A146, which is an important link between Lowestoft and Norwich. Junctions on the A146 close to Beccles will be close to capacity by the end of the Waveney Local Plan period in 2036.

The future allocation of 1,200 new dwellings in village clusters in a South Norfolk Village Clusters Housing Allocations Document should take into consideration the impact on services and facilities in East Suffolk and the overall combined impact of proposed development in South Norfolk and the former Waveney areas on the A146. The Council would wish to be notified of progress on the South Norfolk Village Clusters Housing Allocations Document.

We support the overall approach of allocating housing growth in villages to promote their social sustainability and support rural life and services.

Policy 7.5 – Small Scale Windfall Housing Development
We support the approach in the Small Scale Windfall Housing Development policy

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22092

Received: 13/03/2020

Respondent: Watkin Jones Group

Representation Summary:

WJG support these objectives for creating a vibrant and inclusive area that is enhanced by new homes, infrastructure
and environment.

Full text:

See attached for full submission by Clare Droog on behalf of WJG

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22130

Received: 16/03/2020

Respondent: M Scott Properties Ltd

Agent: Strutt & Parker LLP

Representation Summary:

In developing the new Greater Norwich Local Plan, it will be important that an adequate mix of sites is promoted including a proportion of smaller sites as well as sites to meet specific housing needs (including housing for older people). Our client’s site, Land between Shelfanger and Mount Street could make a meaningful and positive contribution towards meeting these goals.

With regard to the delivery of new housing, the Greater Norwich Local Plan’s inclusion of a 9% buffer is supported, and while a higher buffer of up to 20% would normally be advisable to offset the potential for slow delivery on some sites, in particular large strategic sites. It is acknowledged that no allowance has been made in this instance for windfall within the overall supply and the contingency of approximately 2,000 homes provides additional flexibility to ensure that the overall housing needs are met. However, as outlined above, given the uncertainty around the Carrow Works site (1,200 homes), it would be advisable to allocate smaller sites up to c. 25 units (c. 1 ha) across the Plan area to help boost the supply of new homes.

It is acknowledged that the Plan aims to comply with paragraph 68 of the NPPF by accommodating at least 10% of the housing requirement on sites no larger than 1 ha, however, where there are reasonable alternatives available these should be included to maintain supply and avoid the need to rely on less certain strategic sites or large contingency sites.

The “presumption in favour of sustainable development” is at the heart of the National Planning Policy Framework 2019 (NPPF). The Planning and Compulsory Purchase Act 2004 (Section 39(2)) establishes a legal requirement for Plans to be prepared with the objective of contributing to the achievement of sustainable development.

Paragraph 16 of the NPPF requires plans to be prepared positively in a way that is aspirational but deliverable. Paragraph 59 reminds Local Planning Authorities that the Government’s objective is to significantly boost the supply of homes and that it is therefore important that a sufficient amount and variety of land comes forward where it is needed.

To ensure that Local Authorities have specific deliverable sites they are required to maintain a 5 Year Housing Land Supply with an appropriate buffer. In addition, to ensure supply is maintained, they are also required to monitor the progress in building out sites, to comply with the housing delivery test. The Government’s recently published housing delivery figures for 2019 indicate delivery for the Greater Norwich area comprising Broadland, Norwich and South Norfolk to be at 140%. This is very encouraging, however, housing delivery can be fragile and susceptible to changes in the economy or delays in the delivery of key infrastructure necessary for strategic sites to come forward.

Further to the above, Policy 1 – The Sustainable Growth Strategy sets the settlement hierarchy for the Plan Area as follows:
1. Norwich Urban Area (Norwich and Norwich Fringe)
2. Main Towns
3. Key Service Centres
4. Village Clusters

Further detail on Village Clusters is provided at Appendix 5 of the Draft Strategy, as the preferred option the Council consider that a ‘cluster approach better reflects the way people access services in rural areas and enhances social sustainability by facilitating levels of growth in small villages’ This statement is supported, however it is unclear how this approach will work effectively within the Plan area and how achievable it will be. As such, a focus should be made on small and medium sites. The distribution of growth to a variety of sites will enable a steady delivery of homes and ensure the District can meet its housing targets throughout the Plan period.

Full text:

Please see attached for full submission

Attachments:

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22150

Received: 15/03/2020

Respondent: Chris and Linda Ball

Number of people: 2

Representation Summary:

The GNLP calculates housing needs based on the 2014 National Household Projection. It should use the 2016 National Household Projections and there is no acceptable excuse for not doing so. An ill thought-out strategy/proposal in our opinion.

Full text:

Paragraph 120 of the GNLP stresses the need for good access to services and facilities, but the decision to allocate up to 60 new houses to the village appears to be based almost entirely on the fact that the primary school has a number of vacancies. This is poor decision-making. The recent development of 24 houses in Barn Owl Close in Reedham has resulted in one person of school age moving into the village. Clearly, the provision of additional housing does not automatically guarantee increased take-up of school places.
Other services in the village are extremely limited. There is a doctors’ surgerg which is only open four half-days per week. There is a post office; it is only open three half-days per week. There is no free cash point. There is a village store; most people use it for odds and ends and do most of their shopping at supermarkets in Acle (six miles each way), Yarmouth (10 miles each way) or Norwich (16 miles each way), to which they drive or from which they have their groceries delivered.
There are no significant employment opportunities in Reedham. The current businesses are generally fully staffed and do not have plans for expansion and it is not a village that will ever attract new business because of its location and lack of access to good roads. Given the lack of employment opportunities within the village, there will be a massive increase of journeys from and to work for many of those living in any such new housing, as well as additional journeys by delivery vehicles. Paragraph 125 states the need for ‘a radical shift away from the use of the private car, with many people walking, cycling or using clean public transport.’ That is not feasible for people who live in Reedham, where 96% of journeys are made by private car due to the infrequency or unreliability of public transport. This may not be an issue if we ever reach a point where electric-powered cars predominate, but it’s a huge gamble to base policy on that happening within the lifetime of the GNLP.
Another significant issue with the increased road traffic the proposed additional development would cause, is that the road infrastructure in and around Reedham is poor and would not support the increased demand. The required road width for any road servicing 50 or more dwellings is 5.5 metres. Most of the roads within Reedham do not comply with this requirement. Mill Rd is 3.8 metres wide, narrowing to 3.2 - 3.3 metres in places. Church Road is 3.7 metres at its narrowest point, and only 4.4 metres at its intersection with Freethorpe Rd. Station Road beyond Barn Owl Close is 4.2 metres wide. The Hills is 4.2 metres wide.
Site Specific Objections:
GNLP1001
I object to GNLP1001:-
• Outside the development boundary for the village.
• Contrary to GNLP Policy 2 issue 1 as the site cannot provide “safe, convenient and sustainable access to on-site and local services and facilities including schools, healthcare, shops, leisure/community/faith facilities and libraries” without the use of a car.
• Contrary to GNLP Policy 7.4 347 as there is no safe walking route to school. As per the Discussion of Submitted Sites “Sites which do not have a safe walking route to school, or where one cannot be created, will not be considered suitable for allocation”. The Highways Authority has confirmed it is not feasible to provide an off-carriageway pedestrian facility to enable safe journeys to school.
GNLP3003
I object to GNLP3003:-
• Outside the development boundary for the village.
• Contrary to GNLP Policy 7.4 347 as there is no safe walking route to school. The Discussion of Submitted Sites states “Sites which do not have a safe walking route to school, or where one cannot be created, will not be considered suitable for allocation”. The Highways Authority has confirmed it is not feasible to provide a footway to enable safe journeys to school as there is no scope for improvements within the highway.
• The single entrance access is too narrow with no scope to widen. The Highways Authority has confirmed it is not feasible to provide a safe access as the carriageway is narrower than required for 2-way traffic and there is limited site frontage to the highway.
• The HELAA Conclusion states that Mill Road is “relatively lightly trafficked”. However, there is no evidence to support this statement.
General Objections:
The GNLP is flawed. It appears to pursue a political agenda rather than duly considering sensible and pragmatic issues and flouts national policy on climate change mitigation.
The recent Court of Appeal decision to rule the expansion of Heathrow unlawful because it didn’t take climate change commitments into account puts the proposed GNLP in a dubious position, given that its proposed higher levels of rural development would lead to increases in carbon emissions, which contravenes national planning policy to facilitate their reduction. This would inevitably lead to it being challenged on that basis. It could even be that a legal challenge would be upheld and the policy deemed unlawful.
We argue that the GNLP is a redundant document, given that the current Joint Core Strategy has only been in effect since 2014 and covers the period up to 2026. Certainly, the unexplained change in policy in the GNLP concerning rural development is startling and inappropriate.
One of the core strategies in the JCS was to locate housing and other growth primarily in and close to Norwich, with minimal new development to be permitted in rural areas. One of the stated reasons for the development of the NDR, at great public expense, was to help the distribution of traffic to and from new housing built inside its length and in the northeast growth triangle (as that is what the JCS pointed to). The GNLP consultation document abandons that policy and sacrifices the important protection the JCS gave rural communities against inappropriate development. The main justification for this appears to be the availability of primary school places in the “village clusters”. The issue of climate change is a much more important factor and appears to have been completely ignored despite the introduction stating that ‘the GNLP must also assist the move to a post-carbon economy and protect and enhance our many environmental assets.. This goal is completely undermined by the proposed policy.
The GNLP calculates housing needs based on the 2014 National Household Projection. It should use the 2016 National Household Projections and there is no acceptable excuse for not doing so. An ill thought-out strategy/proposal in our opinion.

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22154

Received: 16/03/2020

Respondent: Pigeon Investment Management Ltd

Agent: Pegasus Group

Representation Summary:

Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplace-based house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplace-based house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplace-based house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplace-based house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplace-based house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplace-based house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 2019-38 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy.
3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 37,000 homes to be delivered in the period 2008-26.2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes 1 only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.

Full text:

Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowner in support of the proposed development of the site at Land at Rightup Lane, Wymondham.

See attached

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22160

Received: 16/03/2020

Respondent: Pigeon Investment Management Ltd

Agent: Pegasus Group

Representation Summary:

Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplace-based house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplace-based house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 2019-38 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy.3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.

Full text:

Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowner in support of the proposed development of the site at Land at Rightup Lane, Wymondham.

See attached

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22161

Received: 16/03/2020

Respondent: Pigeon Investment Management Ltd

Agent: Pegasus Group

Representation Summary:

Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplace-based house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplace-based house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 2019-38 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy.3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.

Full text:

Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowner in support of the proposed development of the site at Land at Rightup Lane, Wymondham.

See attached

Attachments:

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22163

Received: 16/03/2020

Respondent: Norwich Liberal Democrats

Number of people: 3

Representation Summary:

However the plan supports a level of growth in rural areas ‘village clusters in South Norfolk’ – 9% of total housing growth over the plan period - which is very hard to reconcile with Section 4 – The delivery of growth and addressing climate change and Policy 7.1 -Strategy for the areas of growth, and will have impacts for infrastructure provision.’ This approach is inconsistent with the emphasis expressed in the document on addressing climate change and significantly reducing carbon emissions in the Vision and Objectives and Climate Change statement, undermining the ability of the plan to deliver sustainable growth.
In addition there is concern about achieving this 9% growth (1,200 homes) in a more difficult village setting where new housing may be resisted.
The inclusion in the plan to site the additional housing in the most rural parts of South Norfolk in ‘village clusters’ in the GNLP but at the same time excluding details of those village sites or evidence as to the justification of such a policy may leave the GNLP vulnerable to challenge on soundness grounds at the public examination stage.

Full text:

Please see attached for full submission

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22225

Received: 16/03/2020

Respondent: Westmere Homes

Agent: Armstrong Rigg Planning

Representation Summary:

We have concerns in respect of the housing strategy set by the plan, both in terms of the basic housing target and the way in which these are to be delivered. In short, these concerns relate to the less than aspirational housing figures included in the plan and a failure to recognise the significant growth that an escalation in local job creation will place on the housing market.

Fundamentally we consider that the plan should be doing more to seize on the challenges and opportunities presented by two key economic growth strategies in the region, ensuring that their ambitions can be achieved. Currently the baseline housing need for the plan period 2018-2038 is 40,541 new dwellings representing Greater Norwich’s Local Housing Need (LHN) devised using the government’s Standard Methodology. This approach is in line with the NPPF’s minimum requirements described at paragraph 60 of the Framework.

The plan then proposes to identify sufficient allocations to achieve this requirement plus an additional 10% buffer, required by paragraph 73 of the NPPF to “account for any fluctuation in the market” during the course of the following year. Essentially the plan’s housing requirement comprises close on the bear minimum policy-compliant figure required by the NPPF and certainly does little to recognise additional known factors that will no doubt influence the demand for new homes across the plan area.

Indeed, Planning Practice Guidance (PPG) reaffirms that the standard method provides a minimum starting point in determining the number of homes needed in an area and that there will be circumstances where it is appropriate to consider whether actual housing need is higher than the standard method indicates. The PPG then advises that circumstances where setting a higher housing requirement may be appropriate would include the following two scenarios:


“growth strategies for the area that are likely to be deliverable, for example where funding is in place to promote and facilitate additional growth (e.g. Housing Deals); (and)

strategic infrastructure improvements that are likely to drive an increase in the homes needed locally…”


Both of these factors are in play in respect of the GNLP.

Firstly, the ongoing Greater Norwich City Deal includes the commitment of the Greater Norwich Growth Board to secure significant infrastructure funding totalling £440 million along with the delivery of 3,000 additional homes at the city by 2026. Whilst it is recognised that the development requirements of the Deal have been facilitated in part by the allocation of 3,000 additional homes in the adopted Growth Triangle Area Action Plan (GTAAP) the delivery of these strategic housing sites has been slow. To this end the emerging GNLP offers the opportunity to provide fresh stimulus to achieving the ambitions of the City Deal prior to 2026 to make up for any shortfall in new jobs and housing.

It does not, however, appear that the plan has grasped this opportunity. Indeed, Norwich City Council in its report to its Sustainable Development Panel on 15th January 2020, raises identical concerns, stating that “the level of growth proposed in the GNLP is considered insufficient to address the growth needs of Greater Norwich as a whole and the Norwich Urban Area in particular, and lacks the ambition express ed through the previous Joint Core Strategy and the Greater Norwich City Deal” .

Secondly, it is vital that the GNLP responds to the ambitions of the Cambridge Norwich Tech Corridor (CNTC), the vision of which seeks to attract 26,000 additional jobs and 46,000 further residents to the corridor prior to 2031. At this stage it is apparent that, whilst the CNTC proposals would be hugely positive for the city area, they currently represent what is still little more than an aspirational programme for growth with limited delivery mechanisms in place. This is where the GNLP must play a major role in making the CNTC vision a reality.

To the plan’s credit it is noted that the spatial distribution of growth included in the draft strategy orientates a high proportion of the plan area’s homes towards the corridor. What is a concern, however, is that the overall housing target for the plan fails to recognise that the CNTC proposals, and the significant investment and jobs growth that will hopefully come with them, will likely result in an increased housing demand above and beyond the baseline requirement calculated using the Government’s Standard Methodology. The strategy of skewing the delivery of new homes which are already required to meet the needs of the local population towards the corridor to satisfy the CNTC’s aspiration does not represent a positive planning response. Instead this will simply create an imbalance in housing delivery across the plan area.

One of the options put forward in the previous Regulation 18 GNLP consultation in March 2018 was to provide an additional uplift in the housing requirement to take account of the City Deal. However, this approach was discounted as it was considered that the uplift applied built into the LHN figure (i.e. that proposed to tackle local issues in respect of affordability) was sufficient swell to accommodate the demands of the City Deal. Assessment of this approach did not even consider the additional implications of the CNTC. We were strong advocates of the City Deal uplift then – little has changed to lead us to alter this view. To simply maintain a figure close to the basic LHN as the need housing figure for the plan demonstrates a critical misunderstanding of the way in which the figure is calculated. Indeed, the absence of an appropriate uplift fails to reflect the fact that the standard method is a ‘policy off’ calculation of the housing requirement and any adjustments required to due to ‘policy on’ decisions (i.e. to sign a City Deal) should be factored in further.

Indeed, we note that the SHMA published in April 2017 identifies that the jobs growth facilitated by the City Deal would likely result in a demand for approximately 8,361 new homes above and beyond those required as a result of general demographic change over the period until 2036. Even when deducting the 3,000 dwellings planned for in the GTAAP this results in an additional requirement of 5,361 homes that appear not to have been considered when setting the GNLP housing requirement.

On this basis we consider that the OAN proposed by the plan falls short of adequately responding to local demand by an approximate 5,4002 homes. This is before the additional demand generated by the CNTC is taken into account. In which case the absolute minimum housing requirement for the GNLP should be somewhere in the region of 46,0003 dwellings before any NPPF paragraph 73 buffer is applied. In which case it is our view that upon the application of the appropriate buffer the GNLP should be planning for somewhere between 48,300 and 50,6004 dwellings as a minimum based on the demand generated by the City Deal alone. In addition, we would urge officers to undertake the work necessary to quantify the impact of the CNTC – the draw of the Corridor will inevitably result in the eventual housing figure rising further.

Full text:

Please find attached a full set of representations as follows:

On behalf of Westmere Homes Ltd:

Representations in respect of land at North East Aylsham (Site GNLP0336) comprising:

• Letter L0013: Comments on general policies, prepared by ARP
• Annex 1: Land at North East Aylsham, prepared by ARP
• Enclosure A1: Access Strategy, prepared by Vectos
• Enclosure A2: Landscape and Visual Appraisal, prepared by Aspect Landscape Planning
• Enclosure A3: Heritage Assessment, prepared by Asset Heritage
• Enclosure A4: Landscape Strategy and Site Masterplans, prepared by Aspect Landscape Planning

On behalf of Westmere Homes Ltd and Saltcarr Farms Ltd:

Representations in respect of land at Harvest Close, Hainford (Site GNLP2162) comprising:

• Letter L0013: Comments on general policies, prepared by ARP
• Annex 2: Land at Harvest Close, Hainford, prepared by ARP
• Enclosure H1: Access Strategy, prepared by Vectos
• Enclosure H2: Development Framework Plan, prepared by Aspect Landscape Planning

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22256

Received: 16/03/2020

Respondent: Carter Jonas LLP

Number of people: 2

Representation Summary:

The standard method is used in emerging GNLP to determine the minimum number of houses needed during the plan period. Section Id.2a of the Planning Practice Guidance explains how housing and economic needs assessments should be undertaken, including how to calculate local housing needs using the standard method. Firstly, Paragraph 010 identifies the circumstances where increases to housing need might be appropriate, including where there is a growth strategy, strategic infrastructure improvements are proposed, and to meet unmet needs from a neighbouring area. The consultation document for emerging GNLP refers to employment growth and infrastructure. It is Page 3 of 10 requested that the draft version of GNLP includes confirmation that the circumstances identified in Paragraph 010 of Id.2a have been taken into account for the housing requirement. Secondly, Paragraph 024 of Id.2a explains how the need for affordable housing is calculated, and it is suggested that the overall housing target should be increased where it could help deliver the required number of affordable homes. It is not clear whether the housing requirement for emerging GNLP has considered an uplift to meet affordable housing needs. It is requested that the draft version of GNLP includes confirmation that an uplift to the housing requirement to meet affordable housing needs has been considered and assessed.

Full text:

On behalf of my client, Taylor Wimpey Strategic Land, please find attached representations relating to Land South of Townhouse Road, Costessey, and Green Lane West, Rackheath.

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22277

Received: 16/03/2020

Respondent: Barton Willmore

Representation Summary:

Q14) Do you support, object or wish to comment on the approach for housing
numbers and delivery?
2.42 We support the identification of the Government’s standard methodology as the starting point
for calculating the housing requirements of the Plan. This is consistent with the requirements
of the NPPF as the standard methodology is a demographic-based figure which includes an
uplift for affordability, partly accommodating past shortfall.
2.43 Planning Practice Guidance (Paragraph 010 Reference ID 2a-010-20190220) identifies the
circumstances where it may be appropriate to plan for a higher housing need figure than the
standard method indicates including situations where increases in housing are likely to exceed
past trends because of growth strategies or strategic infrastructure improvements.
2.44 The City Deal, which was signed into effect by the Government in December 2013, gives
Greater Norwich increased freedom to help business grow and create economic growth. As
detailed in the City Deal report (December 2013), the deal aims to bring an additional 13,000
jobs and 3,000 homes (above Joint Core Strategy requirements) to the Greater Norwich Area.
As detailed in the Central Norfolk Strategic Housing Market Assessment (June 2017) this
equates to a total of 45,390 jobs over the plan period.2.45 Paragraph 4.19 of the Growth Options Consultation Document (January 2018) identified the
housing requirement may need to increase to support potential job growth arising from the
City Deal, resulting in 1,700 further dwellings being required. No reference to this is included
in any form within the Draft Strategy. Furthermore, the Strategic Housing Market Assessment
for Central Norfolk, specifically references that the three authorities of Broadland, Norwich
and South Norfolk have agreed a City Deal with ambitious plans for an additional 13,000 jobs
and 3,000 homes by 2026, making their JCS target 27,000 additional jobs, plus those 13,000City Deal jobs, over the period 2008-26. This is referenced in the Economy Chapter and
supporting text to Policy 6 and should be reflected in the Housing Numbers.
2.46 Nevertheless, the Draft Strategy confirms the GNLP will seek to over-allocate by means of a
10% buffer (equating to circa. 4,050 dwellings) to ensure delivery. It needs to be clarified
whether this includes some of the dwellings required by the City Deal (8,361 homes as
advocated at figure 101 of the SHMA), thereby reducing the delivery buffer, or if the City
Deal requirement will be in addition to the housing requirements identified in Table 6.
2.47 It is not clear therefore why Table 6 of the GNLP highlights a need for 40,451 new homes.
Further, the SHMA goes on to highlight that to accommodate the additional workers
associated with the City Deal, a further 8,361 new homes should also be planned for. Table
6 of the GNLP should therefore clearly provide as a minimum for 44,714 homes, and given
the commitment to the City Deal, extend that by a further 8,361 homes in the Plan Period
consistent with the NPPG. 3,000 of these homes should be delivered by 2026 in accordance
with the commitments of the City.
2.48 Similarly the NPPG states: “There may, occasionally, also be situations where previous levels
of housing delivery in an area, or previous assessments of need (such as a recently-produced
Strategic Housing Market Assessment) are significantly greater than the outcome from the
standard method. Authorities will need to take this into account when considering whether it
is appropriate to plan for a higher level of need than the standard model suggests”.
2.49 Given the change associated with the standard method, and the high amount of housing in
the previous GNLP to 2026, against which there is a significant shortfall, we are strongly of
the view that a 20% buffer should be applied. This would support in the region of 9,000
homes over and above the housing need calculated using the standard method and would
thus broadly align with the additional homes that would be required consistent with the City
Deal identified within the SHMA.
2.50 Once this additional quantity of housing has been accounted for – i.e. circa 49,000 – 54,000,
the GNLP should then seek to direct additional growth to the most sustainable locations - for
example the A11 and Cambridge to Norwich Tech Corridor as the priority for growth in the
region.2.51 The ‘alternative approaches’ to housing numbers identifies that whilst the NPPF encourages
a higher housing requirement, this is not the preferred option as evidence of delivery over
the medium and longer term suggests that higher targets are unlikely to be achievable or
deliverable. We do not believe this position is evidenced, and in fact past poor delivery hasbeen as a result of incorrect sites being allocation and an overreliance on sites within the
Growth Triangle (as detailed above and further in response to Questions 38 – 40).

Full text:

Full representations (with appendices) submitted in response to the current Regulation 18 consultation of the Greater Norwich Local Plan on behalf of Landstock Estates Ltd and Landowners Group Ltd.

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22283

Received: 16/03/2020

Respondent: Hugh Crane Ltd

Agent: Savills

Representation Summary:

For full representation, please refer to the attached documents.

For the reasons set out above, there appears to be a conflict within the draft Greater Norwich Local Plan in respect of the aspiration to make to most of economic growth potential however only planning for the minimum number of new homes throughout the plan period.

Allocation of additional housing at ‘Land to the east of Woodbastwick Road, Blofield Heath’ (Draft Policy GNLP1048) will assist the Local Planning Authorities in boosting the supply of housing within Greater Norwich.

Full text:

For full submission, please refer to attached documents

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22326

Received: 16/03/2020

Respondent: Pigeon Investment Management Ltd

Agent: Pegasus Group

Representation Summary:

3. POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to fiveyear land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplacebased house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplacebased house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 201938 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy. 3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes 1 only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to increase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum. 3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections. 3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum but this should be significantly greater, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.
Employment Land Requirement
3.35 As set out in the GNLP, there is no quantitative need for additional employment sites across the GNLP area as a whole. Nevertheless, the GNLP allocates an additional 40ha providing a total of 360ha of employment land allocations to meet the underlying demand and provide choice to the market.
3.36 Whilst these allocations will assist the economic growth of the area and represent positive planning, if a significant proportion of these are actually developed and occupied, they will be dependent upon greater numbers of incommuters from outside of the plan area. Accordingly, an appropriate monitoring framework should be put in place to ensure that a sufficient number of homes are provided to accommodate the workforce to avoid the resultantenvironmental harms of a greater dependency on long-distance commuting flows.
3.37 If the monitoring framework indicates that a greater number of jobs have been accommodated than the growth in the resident workforce such that the economy of the area becomes more dependent upon unsustainable long-distance incommuting flows, this should trigger an immediate review of the GNLP alongside a policy response with residential planning applications being considered more favourably until such time as the GNLP review is adopted to address the imbalance.
3.38 Similarly, if an insufficient amount of employment land is actually developed and occupied, this should trigger an immediate review of the GNLP to bring forward additional employment land allocations alongside a policy response to consider employment planning applications more favourably in the interim.
The approach to five-year land supply
3.39 Policy 1 proposes that the five-year land supply will be assessed across the plan area and that enough allocations are provided to demonstrate a five-year land supply at adoption. However, there is no evidence that this is the case as the GNLP is not supported by a housing trajectory contrary to paragraph 73 of the NPPF. Pegasus Group reserve the right to respond on this matter when the necessary evidence is made available.
Spatial Strategy
3.40 The Table at Policy 1 details the distribution of housing supply across the settlement hierarchy, including proposed new allocations as follows;
- Norwich urban area - 30,560 dwellings – approximately 70% of supply
- Main towns – 6,342 dwellings – approximately 14% of supply
- Key Service Centres – 3,417 dwellings – approximately 8% of supply
- Village clusters – 4,024 dwellings – approximately 9% of supply
3.41 Policies 7.1 to 7.5 provide further detail on the distribution of sites and the composition of existing and proposed allocations with regard to their size and brown or green field status. 3.42 We have concerns over the proposed spatial strategy of the emerging GNLP owing to its over reliance on housing delivery in the Norwich urban area and the proposed discrepancy in terms of settlement hierarchy between the quantum of housing allocated to Main Towns, Key Service Centres and Village Clusters.
3.43 While the Norwich urban area is a sustainable location for growth, reliance on this area for the delivery of approximately 70% of the housing growth of the GNLP up to 2038 places a requirement on existing infrastructure to accommodate an additional 30,560 dwellings in the plan period, it also requires an annual delivery rate within the area of 1,698 dwellings per annum over each of the next 18 years. This requires that the level of development in Norwich urban area alone is broadly consistent with that which has been achieved across the entire GNLP plan area since 2008. This does not appear to be realistic. If the necessary boost to housing supply is to be achieved this will require a greater range and choice of sites across all of the sustainable settlements within the plan area.
3.44 Moreover, reference to Policy 7.1 demonstrates that delivery within the Norwich Urban Area is predicated on two substantial brownfield regeneration areas, the Northern City Regeneration Area and the East Norwich Strategic Regeneration Area and several urban extensions of over 1,000 dwellings each.
3.45 Brownfield regeneration is costly and time consuming and often involves the bringing together of multiple delivery partners to achieve. The likelihood of the totality of development proposed through regeneration delivering in the plan period is therefore slim.
3.46 New strategic urban extensions can also be timely to deliver with the need for new strategic infrastructure in terms of highways and drainage to be delivered in advance of new homes.
3.47 The Councils have not produced evidence to substantiate the delivery trajectory of the brownfield regeneration sites or the urban extensions in the Norwich Urban Area. We reserve the right to comment further on this matter at the Regulation 19 consultation stage. Delay in delivery at either source of supply could prejudice the delivery of the housing requirement of the GNLP and therefore go to the soundness of the plan. 3.48 Additional certainty over the delivery of the housing requirement could be achieved by changing the emphasis of the spatial strategy by allocating more housing to the Main Towns and the Key Service Centres, including Hethersett with an associated reduction in the percentage to be delivered in the Norwich urban area and within the Village Clusters.
3.49 Additionally, we have concerns over the fact that more dwellings are proposed in the spatial strategy across Village Clusters than are allocated at Key Service Centres, including a minimum of 1,200 dwellings through a South Norfolk Village Clusters Housing Site Allocations Development Plan Document.
3.50 Without certainty over the supply of land to deliver such a quantum of development in South Norfolk Village Clusters the soundness of the spatial strategy is questionable. As a percentage of the overall new housing allocations in the Reg 18 GNLP the current spatial strategy delegates approximately 15% to a document outside of its control (1200/7,840). This is not considered to be a reasonable approach and prejudices the delivery of the emerging GNLP by 2038.
3.51 A Settlement Hierarchy approach to the distribution of development would look to allocate a higher percentage of housing to more sustainable locations with smaller amounts being allocated to lower order settlements in recognition that small developments at villages can help maintain service provision, provide vitality and help address local market and affordable housing needs.
3.52 The Reg 18 GNLP allocates more development to Village clusters than to Key Service Centres which is a counter intuitive approach to achieving sustainable development. We consider this matter should be addressed by allocating additional sites at Hethersett, with Pigeon being able to provide land for the development of new community facilities, over and above sites for new housing development.
3.53 In failing to provide an increased number of dwellings at Main Towns and Key Service Centres the Councils are also missing the opportunities presented by Pigeon to provide new community facilities that can support existing and proposed new development in sustainable locations for the plan period and beyond. 3.54 The preceding representations on the Spatial Strategy are all set in the context that the identified housing need does not even accord with the minimum set by national policy and does not take account of the needs of specific groups. It is therefore evident that the quantitative elements of the Spatial Strategy will need to be revised to ensure that housing needs can be met across the GNLP area. This should be achieved through directing more growth to the Main Towns and Key Service Centres to counterbalance the disproportionate levels of growth proposed within the Norwich urban area and Village Clusters.

Full text:

Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22365

Received: 16/03/2020

Respondent: Pigeon Investment Management Ltd

Agent: Pegasus Group

Representation Summary:

3. POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to fiveyear land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplacebased house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplacebased house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 201938 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy. 3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes only provides for an average of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to incre3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections. ase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum. 3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum but this should be significantly greater, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.
Employment Land Requirement
3.35 As set out in the GNLP, there is no quantitative need for additional employment sites. Nevertheless, the GNLP allocates an additional 40ha providing a total of 360ha of employment land allocations to meet the underlying demand and provide choice to the market.
3.36 Whilst these allocations will assist the economic growth of the area and represent positive planning, if a significant proportion of these are actually developed and occupied, they will be dependent upon greater numbers of incommuters from outside of the plan area. Accordingly, an appropriate monitoring framework should be put in place to ensure that a sufficient number of homes are provienvironmental harms of a greater dependency on long-distance commuting flows.
3.37 If the monitoring framework indicates that a greater number of jobs have been accommodated than the growth in the resident workforce such that the economy of the area becomes more dependent upon unsustainable long-distance incommuting flows, this should trigger an immediate review of the GNLP alongside a policy response with residential planning applications being considered more favourably until such time as the GNLP review is adopted to address the imbalance.
The approach to five-year land supply
3.38 Policy 1 proposes that the five-year land supply will be assessed across the plan area and that enough allocations are provided to demonstrate a five-year land supply at adoption. However, there is no evidence that this is the case as the GNLP is not supported by a housing trajectory contrary to paragraph 73 of the NPPF. Pegasus Group reserve the right to respond on this matter when the necessary evidence is made available.
Spatial Strategy
3.39 The Table at Policy 1 details the distribution of housing supply across the settlement hierarchy, including proposed new allocations as follows;
- Norwich urban area - 30,560 dwellings – approximately 70% of supply
- Main towns – 6,342 dwellings – approximately 14% of supply
- Key Service Centres – 3,417 dwellings – approximately 8% of supply
- Village clusters – 4,024 dwellings – approximately 9% of supply
3.40 Policies 7.1 to 7.5 provide further detail on the distribution of sites and the composition of existing and proposed allocations with regard to their size and brown or green field status.
3.41 Our clients raise concern over the proposed spatial strategy of the emerging GNLP owing to its over reliance on housing delivery in the Norwich urban area and the proposed discrepancy in terms of settlement hierarchy between the ded to accommodate the workforce to avoid the resultant quantum of housing allocated to Main Towns, Key Service Centres and Village Clusters.
3.42 While the Norwich urban area is a sustainable location for growth, reliance on this area for the delivery of approximately 70% of the housing growth of the GNLP up to 2038 places a requirement on existing infrastructure to accommodate an additional 30,560 dwellings in the plan period, it also requires an annual delivery rate within the area of 1,698 dwellings per annum over each of the next 18 years. This requires that the level of development in Norwich urban area alone is broadly consistent with that which has been achieved across the entire GNLP plan area since 2008. This does not appear to be realistic. If the necessary boost to housing supply is to be achieved this will require a greater range and choice of sites across all of the sustainable settlements within the plan area.
3.43 Moreover, reference to Policy 7.1 demonstrates that delivery within the Norwich Urban Area is predicated on two substantial brownfield regeneration areas, the Northern City Regeneration Area and the East Norwich Strategic Regeneration Area and several urban extensions of over 1,000 dwellings each.
3.44 Brownfield regeneration is costly and time consuming and often involves the bringing together of multiple delivery partners to achieve. The likelihood of the totality of development proposed through regeneration delivering in the plan period is therefore slim.
3.45 New strategic urban extensions can also be timely to deliver with the need for new strategic infrastructure in terms of highways and drainage to be delivered in advance of new homes.
3.46 The Councils have not produced evidence to substantiate the delivery trajectory of the brownfield regeneration sites or the urban extensions in the Norwich Urban Area. We reserve the right to comment further on this matter at the Regulation 19 consultation stage. Delay in delivery at either source of supply could prejudice the delivery of the housing requirement of the GNLP and therefore go to the soundness of the plan.
3.47 Additional certainty over the delivery of the housing requirement could be achieved by changing the emphasis of the spatial strategy by allocating more housing to the Main Towns, including Diss, and the Key Service Centres with anassociated reduction in the percentage to be delivered in Norwich urban area and the Village Clusters.
3.48 Diss in particular is identified in the Reg 18 GNLP as having capacity for additional employment development. Diss is a net importer of workers with 2011 Census data showing only 4,939 economically active people living in the town compared to the 5,623 people working there. In order to balance homes and jobs and provide for sustainable development it is necessary for more houses to come forward at Diss, especially given the re-allocation of 10.8ha of employment land at the Town in the Reg 18 GNLP.
3.49 Additionally, we have concerns over the fact that more dwellings are proposed in the spatial strategy across Village Clusters than are allocated at Key Service Centres, including a minimum of 1,200 dwellings through a South Norfolk Village Clusters Housing Site Allocations Development Plan Document.
3.50 Without certainty over the supply of land to deliver such a quantum of development in South Norfolk Village Clusters the soundness of the spatial strategy is questionable. As a percentage of the overall new housing allocations in the Reg 18 GNLP the current spatial strategy delegates approximately 15% to a document outside of its control (1200/7,840). This is not considered to be a reasonable approach and prejudices the delivery of the emerging GNLP by 2038.
3.51 A Settlement Hierarchy approach to the distribution of development would look to allocate a higher percentage of housing to more sustainable locations with smaller amounts being allocated to lower order settlements in recognition that small developments at villages can help maintain service provision, provide vitality and help address local market and affordable housing needs.
3.52 In failing to provide an increased number of dwellings at Main Towns and Key Service Centres the Councils are also missing the opportunities presented by Pigeon to provide new community facilities that can support existing and proposed new development in sustainable locations for the plan period and beyond.
3.53 The preceding representations on the Spatial Strategy are all set in the context that the identified housing need does not even accord with the minimum set by national policy and does not take account of the needs of specific groups. It is therefore evident that the quantitative elements of the Spatial Strategy will need to be revised to ensure that housing needs can be met across the GNLP area. This should be achieved through directing more growth to the Main Towns and Key Service Centres to counterbalance the disproportionate levels of growth proposed within the Norwich urban area and Village Clusters.

Full text:

Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Walcot Green Lane, Diss.

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22399

Received: 16/03/2020

Respondent: Norwich Green Party

Representation Summary:

Object. Plan should ensure delivery of JCS allocations before commencing phased development of new sites allocated in GNLP, starting with brownfield sites in Norwich city centre. Linking delivery of affordable housing to that of private sector housing has failed. Planning authorities have maximised housing numbers to obtain affordable housing whilst developers have claimed that achievement of policy quota of 33% affordable housing is unviable. The only solution to addressing affordable housing need is through public policy intervention, in particular national government facilitating social housing.

Full text:

For full representation and additional information submitted, please refer to the attached documents.

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22431

Received: 16/03/2020

Respondent: Gladman Developments

Representation Summary:

5.2 Question 14: Housing Numbers and Delivery
Proposed Housing Requirement
5.2.1 Draft Policy 1 proposes a housing requirement of 40,550 dwellings for the plan period 2018 to 2038 (2,028 dpa). This reflects the local housing needs for the Greater Norwich Plan Area using the Government’s standardised methodology. Having reviewed the wider evidence base informing the Plan, Gladman is not convinced that the standard method figure alone provides a sufficient level of housing growth for the Greater Norwich Plan Area especially in the context of the ambitious economic growth objectives set out in the draft GNLP. Further work is therefore necessary to understand the link between planned housing and job targets.
5.2.2 The standard method represents the minimum housing needs for the area and considers only demographic need and affordability. The standard method does not account for the housing needed to support economic growth needs or ambitions, nor does it align to commitments made for strategic investments or funding which might influence the level of housing growth required in an area.
5.2.3 PPG confirms the following circumstances in which the adoption of a higher housing requirement above the standard method may be justified3. This includes but is not limited to:
 Growth Strategies for the area that are likely to be deliverable, for example where funding is in place to promote and facilitate additional growth (e.g. Housing Deals);
 Strategic infrastructure improvements that are likely to drive an increase in the homes needed locally;
 An authority agreeing to take on unmet need from neighbouring authorities, as set out in a statement of common ground; and
 On occasion, situations where previous levels of housing delivery in an area, or previous assessments of need are significantly greater than the outcome from the standard method.
5.2.4 The Greater Norwich authorities benefit from the City Deal which commits to facilitating the delivery of 13,000 more jobs than the target set within the joint Core Strategy. Reflecting this commitment, Draft Policy 1 advises a job target of 33,000 jobs over the period 2018 to 2038. This requirement accounts for the remaining job growth associated with the City Deal and the longer term benefits the City Deal is predicted to have for the Greater Norwich economy. This represents an uplift of around 8,000 jobs against the baseline trend forecast as set out through the East of England Forecasting Model which might have otherwise informed the job targets of the emerging Plan.
5.2.5 Despite having influenced the economic growth strategy of the Draft GNLP, the City Deal does not appear to have been considered in determining the housing requirements of the Greater Norwich Draft Plan. This ignores the intricate links between the supply of housing and employment land, and the constraining nature insufficient delivery of housing can have on securing sustainable jobs growth otherwise recognised in Paragraph 81of the NPPF.
5.2.6 To ensure consistency with national planning policy, the authorities should assess to what degree the proposed housing requirement will support the implementation of the jobs growth figures set out in draft Policy 1. Should this assessment show that the supply of housing land planned through the GNLP would fail to provide for a sufficient economically active workforce, an appropriate upward adjustment should be made to the housing requirement to ensure that housing land supply does not act as a constraint to planned levels of economic growth. At present this additional, but important assessment, is missing from the supporting evidence base to the GNLP and is required to ensure that the proposed housing requirement is robust and consistent with national planning policy.
Supply
5.2.7 Gladman welcomes and is supportive in principle of the proposal to allocate surplus housing land in contrast to proposed requirements through the GNLP. This surplus will help secure a significant boost in housing land supply, heighten the deliverability of the defined housing requirement, and ensure that the GNLP is durable to any changes which might occur over the plan period.
5.2.8 The need to secure deliverability is significant in the case of the GNLP where much of the housing requirement is evidently already met by committed developments (around 85%), and in particular, a relatively small number of larger schemes. This includes the Old Catton, Sprowston, Rackheath, and Thorpe St Andrew growth triangle located north and east of Norwich which will provide around 13,500 dwellings, as well as other strategic development sites at Cringleford, Costessey, Long Stratton and Wymondham. Should any of these sites stall or fail to come forward as envisaged, the GNLP will quickly fail given the significant contribution made by these sites to the housing needs of the plan area. It is therefore important to plan for an increased supply and to allow flexibility to account for any potential shortfall at any of these sites.
5.2.9 A targeted buffer of 10% to the housing land supply is currently proposed through the draft Plan. Noting the significant degree of committed developments and the role played by large scale development cited above, Gladman does not consider this buffer to be sufficient and should be increased to no less than 20%. This would provide for a total supply of 48,660 dwellings (8,110 dwellings in excess of the requirement). The adoption of this higher buffer would provide greater certainty that the housing requirement, as currently defined, is met in full.
Contingency
5.2.10 In addition to the proposed buffer to the housing land supply, the GNLP identifies possible locations for further growth as contingency, should sites fail to come forward as envisaged. This includes 1,000 dwellings at Costessey, and the potential for a further 1,000 dwellings at Wymondham.
5.2.11 Further detail about the merits of specific locations for this contingency is set out under separate cover by Gladman. It is however unclear, at this draft stage, as to how the Councils envisage that the contingency sites might come forward when required in the plan period. As drafted the GNLP sets out no mechanism under which these contingency sites might come forward. The GNLP is therefore silent under what conditions these sites might be permitted by the relevant local authority, and what the approach to securing the delivery the proposed contingency locations are. In this regard the GNLP is ineffective, and a revised approach is necessary to secure its deliverability.
5.2.12 Gladman’s preference is for this contingency (at both Costessey and Wymondham) to be included within the Greater Norwich Local Plan as allocations for housing. This position takes into account comments made above in relation to housing need and the case for flexibility in planned levels of supply, should committed and other allocated sites fail to come to fruition. Allocating this land for housing provides the greatest certainty that sites can come forward without delay, sites are available and deliverable for housing, and reduces the need for future review.
5.2.13 Should the Councils disagree with the above, Gladman considers that additional wording is necessary in Draft Policy 1 to set out how contingency sites would come forward. The need for flexibility in this wording is key in order to minimise delay in meeting any arising unmet need and ensure that identified contingency sites are effective in responding to a requirement for an increase in the supply of housing land. As such, any policy requiring first a review of the GNLP before development is permitted at contingency sites should be avoided owing to the significant delay such a process would have, significantly reducing the merits of contingency sites in addressing any housing shortfall.

Full text:

Please find attached the headline representations of Gladman made in response to the Reg 18 version of the Greater Norwich Local Plan.

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22488

Received: 16/03/2020

Respondent: Highways England

Representation Summary:

The proposed long-term future target year is a minimum of 44,340 new homes in twenty years, between 2018 and 2038. The proposed new allocation is 7,840 distributing in Norwich urban areas and in different main towns, key service centres and village clusters. The only thing I could raise is that the number of housing for annual target around two thousand is very high which may become a road junction capacity issue within medium to long term delivery target.

Full text:

Thank you for inviting Highways England to comment on the Regulation 18 Draft Review of the Greater Norwich Local Plan (GNLP), which is prepared jointly by three local authorities - Broadland District Council, Norwich City Council and South Norfolk Council through the Greater Norwich Development Partnership (GNDP). This document expresses our views on the Draft Strategy and Site Allocations for future development as mentioned in this GNLP.
Highways England is responsible for the operation, maintenance and improvement of the Strategic Road Network (SRN) in England on behalf of the Secretary of the State. In the area within and surrounding Norfolk, this relates to the A11 and A47 trunk roads.
Consequently, our comments on the draft Local Plan which are set out below are limited to those aspects/strategies which may have impacts related to these two trunk roads.

See attached

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22516

Received: 16/03/2020

Respondent: Broadland Green Party

Representation Summary:

Comment: We have already questioned the projected rise in the population. No satisfactory evidence has been provided for this increase.
There appears to be a circular argument on house numbers and jobs to be created. What comes first? Is it the jobs or is it the people who need the jobs?
We have already seen that with declining birth rates the only way in which the population is going to rise in the lifetime of the plan is through new people arriving. Given that any further developments are going to increase our carbon footprint and degrade our pleasant environment why would we want to encourage an increase in an unsustainable population? The argument in the plan is to increase economic growth but if this growth is at the expense of healthy living and increased carbon emissions then it is neither a welcome nor sustainable way to plan our future.
The housing that is required should be built to provide affordable housing for those who need it and housing for the elderly as indicated by the population mix in Section 2, para 34.
A significant proportion of such housing will need to be social housing for those who cannot afford to buy.

Full text:

I attach the feedback from Broadland Green Party members on the GNLP Consultation.

Each section is identified but not all questions have been answered. However, all questions are included to maintain the numbering.

See attached

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22631

Received: 13/03/2020

Respondent: M Scott Properties Ltd

Number of people: 2

Agent: Bidwells

Representation Summary:

Support
See comments made in relation to Question 9.

Full text:

On behalf of M Scott Properties Ltd we are instructed to submit representations to the Greater Norwich Local Plan Regulation 18 (c) consultation. The representations are split into two, reflecting the two parts of the Greater Norwich Local Plan; the Strategy Document and the Sites Plan, in respect of GNLP0337.

The attached document provides a complete record of the representations made on behalf of M Scott Properties Ltd.

The various technical studies referred to in the Representation and the Delivery Statement can be accessed in the attachments also.

Attachments:

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22644

Received: 16/03/2020

Respondent: Cllr Julie Neesam

Representation Summary:

NO - the 9 /10% extra allocations as well as additional windfall sites is excessive given that there are sufficient sites allocated to meet predicted demand.

Full text:

POLICY 1 – SUSTAINABLE GROWTH
Q13 Do you agree with the proposed settlement hierarchy?
NO - Becoming part of a cluster will result in inevitable exposure to wider and unnecessary development and the ultimate loss of existing settlement boundaries and village identity.
Q14 Do you support the approach to housing numbers?
NO - the 9 /10% extra allocations as well as additional windfall sites is excessive given that there are sufficient sites allocated to meet predicted demand.

POLICY 7- 4 VILLAGE CLUSTERS

Q45. Do you support or wish to comment on the overall approach for the village clusters? Please identify particular issues.

Most villages are able to continue to access services as they do already without the need to cluster. The policy is intended to enable wider development which will result in the ultimate loss of existing settlement boundaries and the risk of unnecessary development.

Q46. Do you support or wish to comment on the approach for specific village clusters?
We strongly object to the proposed cluster of Hainford with Stratton Strawless or any other village and firmly believe that Hainford should retain its stand alone village status as are other nearby villages. The residents of Hainford value their rural aspect and independence and the reasons for linking Stratton Strawless to Hainford are weak.
a) The majority of family size accommodation in Stratton Strawless is situated west of the A140 where there are other nearby schools which are closer and more accessible than Hainford without the requirement to cross the busy A140 at peak times, Hevingham school is 0.4 miles, Marsham Primary School 1.4 miles and Horsford (with supermarket, Doctors surgery, Post Office,social club, leisure facilities, take away food outlet, library, excellent public transport links etc.) is also closer.
b) The largest concentration of homes on the eastern side of the A140 are on the mobile home park which we understand is for residents over the age of 55. For the residents who may live on the eastern side of the A140 and require primary school facilities there is also nearby Buxton school.
In addition to the above we object to the proposal that there is the potential for the development of 50/60 dwellings because there is insufficient capacity to sustain that level of development due to lack of facilities and infrastructure to support this.
The Officers have already stated that there is no capacity for Hainford school to expand and all 9 proposed sites for Hainford were discounted by planners mainly due to there being no safe pedestrian access to the school ( a crucial underlying criteria for development in the policy) and no feasible way to address this. There were Highways concerns, widespread flooding issues, and visual impact and break out into the country side. Added to which the public transport service is very limited with the last daily service from the city at 18.15 .We understand that the Policy requirements are to avoid development where there is a reliance on the private motor vehicle.
Therefore I support Hainford Parish council's objections to the proposal to become part of a cluster and to the ultimate redefinition of our settlement boundary in order to facilitate wider development and to the proposal that there is the capacity to support a further 50/60 dwellings

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22660

Received: 16/03/2020

Respondent: Saxlingham Nethergate Parish Council

Representation Summary:

Paragraph 145 claims that the strategy ‘is informed by consultation feedback’, yet chooses to ignore much from previous consultations even where such feedback was significantly in favour of a particular approach. An example of this is the position taken towards windfalls. Responses to the Stage A Regulation 18 Site Proposals and Growth Options consultation were significantly against (110 to 45) counting windfalls in addition to the additional (at that point 7,200) housing, and yet this has been ignored in the current draft plan consultation. By not counting windfalls in the calculation for housing numbers in table 6, there will be a resulting over-supply of houses, particularly if the out-of-date 2014 National Housing Projections are used. Windfalls are acknowledged as a reliable source of new housing and many Local Authorities do count them towards their housing targets: their contribution towards housing targets in the GNLP should lead to a reduction in the number of new sites which are allocated.

CPRE Norfolk also has specific concerns about the approach for housing numbers in the South Norfolk Village Clusters, as there is no total figure given for this new housing, but instead an open-ended ‘minimum of 1,200 homes’. This use of the word “minimum” needs to be removed and replaced by a “maximum” total, so that further potential over-supply is avoided. At best, the actual delivery of new housing in the plan area has just exceeded 2,000 dwellings per annum, with 1,500 being more typical. At this build-rate, current commitments cover actual housing need to 2038.

CPRE Norfolk wants to see sites allocated for housing in the existing plan (JCS) developed before any new sites that are likely to be added in to the emerging GNLP are built out. Although we understand that it will not be possible to prevent new sites being included in the plan, we are asking that these extra land allocations for housing are treated as phased development and that building should not occur on these sites until the current JCS sites have been used up. We think this is a sensible approach because not only does it protect the countryside, but also at current rates of house building there is enough land already allocated in the JCS to cater for the building that is likely to occur over the new Plan period.

There is very little evidence to show that increasing the amount of land on which houses can be built actually increases the rate at which they are built. All that happens is that developers ‘cherry-pick’ the most profitable sites, which are likely to be the newly allocated green field sites and that this will lead to even more land banking of currently allocated sites. This will also mean that many less sustainable (or as CPRE Norfolk would argue, unsustainable) sites for housing are developed rather than those with more sustainable locations. This would result in more pollution and congestion, with the negative consequences for the climate and climate change. It also means that expensive infrastructure which has been provided to facilitate new housing in the existing plan, could end up being an irrelevant and embarrassing white elephant.

It is disappointing that there is no mention of phasing as an option within the consultation document, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%)have supported CPRE Norfolk on this issue and have signed a pledge to this effect, which was included in the previous consultation, but ignored in the current draft Plan. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward. Clearly there is a democratic deficit: meaningful consultation should not ignore this volume of common-sense opinion.

Full text:

Saxlingham Nethergate Parish Council met last week and considered their response to the current consultation.

They noted, considered and decided to fully endorse the response produced by CPRE in full (attached).

Q1 Please comment on or highlight any inaccuracies within the introduction

Please see our more detailed responses to the questions below, which make our concerns clear. In particular we have a major concern with the Draft Strategy as it makes no mention of using phasing for the delivery of new housing. We consider that any new sites allocated in the GNLP should be phased by being placed on a reserve list, and under phased development only built out when most of the existing JCS sites have been used. Inclusion of all the sites for immediate development will lead to developers “cherry-picking” the most profitable sites and newly allocated green field sites in less sustainable locations will be developed first, with even more land banking of currently allocated sites. In short, deliver the already allocated 82% of the 44,500 new homes, before giving permissions on the remaining 18%.

The current Local Plan, the Joint Core Strategy (JCS) was adopted in March 2011 with amendments adopted in January 2014: it has been in place for just over 6 years. When adopted, it was considered to be the blueprint for development in Norwich, Broadland and South Norfolk until 2026, and in doing so provided clear signals about where growth should and should not take place. In the introduction to the current consultation document it is stated that housing, jobs, services and infrastructure needs to be provided at the right time ‘and in the right places’. CPRE Norfolk questions how the response to this has changed so markedly since adoption of the JCS and well before that Local Plan was due to expire. In particular, the construction of the Broadland Northway (NDR) (noted in paragraph 7 of the introduction) was largely intended to help the distribution of traffic to and from new housing built inside its length and in the northeast growth triangle. Moreover, there was a clear focus for housing and other growth to be in and close to Norwich, with minimal new development to be permitted in the rural policy areas of Broadland and South Norfolk. The GNLP strategy seems to be contradicting the direction of travel envisaged in the JCS and appears to undermine the planning process. A great strength of the JCS is the protection it gave to the rural areas: this seems to be sacrificed in the GNLP Draft Plan.

Paragraph 6 of the Introduction is clear that ‘the GNLP must also assist the move to a post-carbon economy and protect and enhance our many environmental assets.’ It will be difficult if not impossible to meet these targets if new housing to the scale proposed in the draft strategy is dispersed across the rural areas of Broadland and South Norfolk. The main justification for this appears to be the availability of primary school places in the “village clusters”, whereas there are more important measures for sustainability which should be taken into account, including the number of car journeys and journeys by delivery vehicles to new housing, along with the associated congestion such vehicles will result in.

The introduction mentions in paragraph 25 that South Norfolk District Council will draw up its own South Norfolk Village Clusters Housing Site Allocations document. CPRE Norfolk is very concerned that by adopting such an approach this allocations document will not receive the same level of scrutiny as the main draft strategy document. We are also very concerned that the number of additional dwellings on top of the existing commitment of 1,349 houses is given as ‘a minimum of 1,200’. The use of the word ‘minimum’ is unnecessary and potentially very alarming, as in effect this gives no limit to the maximum number of houses which could be allocated in those “village clusters”. Given the draft plan provides enough committed sites ‘to accommodate 9% more homes than “need”, along with two “contingency” locations for growth’ (page 37) and does not include windfall developments in its housing totals, the word “minimum” should be replaced with “maximum” or “up to” as is the case with the figures for Broadland’s “village clusters”. Why is there this discrepancy in language between two authorities which are part of the same Local Plan: it appears to be inconsistent and illogical.

Q3 Please comment on or highlight any inaccuracies within the spatial profile.

Paragraph 41 states that ‘this GNLP needs to plan for additional housing needs above and beyond existing commitments based on the most up-to date evidence’. However, the calculations of housing need are based on the 2014 National Household Projections, which are not the most up-to date statistics, nor are they sufficiently robust to be used for such an important and far-reaching strategy. CPRE Norfolk admits that the 2014 figures are those which central Government expects to be used. However, several Local Planning Authorities, including North Norfolk District Council, are challenging the use of the 2014 figures, instead suggesting that the more up-to date 2016 National Household Projections should be used. CPRE Norfolk agrees that the GNLP needs to be based on the most up-to date evidence, and therefore requests the GNDP insists on using the 2016 National Household Projections. If the most recent ONS statistics had been used, current commitments are sufficient to cover housing needs to 2038.

Q6 Do you support or object to the vision and objectives for Greater Norwich?

A major concern is that the draft plan largely consists of a wish list, but lacks real targets or actions, particularly on the environment and climate change. For example, our environment is lauded but the draft plan notes in paragraph 37 that life expectancy for men in Norwich is 10.9 years lower in the most deprived areas compared to the least deprived. We cannot see any specifics within the draft plan as to how this shocking fact is to be addressed.

Paragraph 120 stresses the need for ‘good access to services and facilities’ for ‘our suburbs, towns and villages’. While this is provided in the first two categories of settlement there is insufficient provision or access to services in many of the settlements within the “village clusters”. The decision to allocate additional new housing beyond what is already allocated within the JCS is based almost solely on the existence of a primary school with available places or potential for expansion within the “cluster”. This does not amount to the provision of ‘good access to services and facilities’ and therefore this level of new housing in “village clusters” should not be permitted within the GNLP.

Paragraph 125 is perhaps the strongest argument for not allocating additional housing to “village clusters” within the GNLP. Clearly, there will be a major need for journeys from and to work for many of those living in any such new housing, in addition to additional journeys by delivery vehicles to this new housing. This paragraph states the need for ‘a radical shift away from the use of the private car, with many people walking, cycling or using clean public transport.’ For the majority of the plan period it is highly wishful thinking to think that ‘electric vehicles will predominate throughout Greater Norwich’. These additional journeys will not only add to the “carbon footprint” but will also add to congestion on the road network, affecting air quality and the wellbeing of residents. If the intention of the GNLP is to locate housing close to jobs, which we agree should be a major aim, then any additional allocations of housing should be located in or close to Norwich, where there are realistic opportunities to walk or cycle to work and to services, or to use public transport to do so. The existing allocations of housing within the JCS and to be carried forward to the GNLP will provide sufficient new accommodation close to other places of work in main towns and key service centres.

Paragraph 129 states: ‘greater efficiency in water and energy usage will have minimised the need for new infrastructure, and further reductions in carbon emissions will be delivered through the increased use of sustainable energy sources. New water efficient buildings will have also contributed to the protection of our water resources and water quality, helping to ensure the protection of our rivers, the Broads and our other wetland habitats.’ We strongly feel that it is imperative that Per Capita Consumption (PCC) of water is further reduced to below the Government’s prescribed 110 litres per person per day in order to deliver this statement in paragraph 129. East Anglia is the driest region in the UK: our aquifers, rivers and wetlands are already at breaking point, as are many of the region’s farmers, who are seeing their abstraction licences reduced or revoked. If more demanding standards to reduce PCC water consumption are not set as part of the GNLP, this will further adversely impact upon the environment, impacting on the Broads and wetlands, which in turn will impact the region’s aspirational growth for tourism and will severely impact the regional agricultural economy. To ensure that the water-supply to existing users is not compromised it is sensible to restrict the number of new houses to a level that realistically covers actual need, and this fact reinforces our case for phasing of housing and our questioning of the need for a higher than necessary buffer.

Paragraph 132 makes the claim that new quality development will be located to minimise the loss of green-field land. CPRE Norfolk strongly suggests that the best way to achieve this is not to allocate additional sites for housing in “village clusters”. Indeed, there are already sufficient allocated sites for housing in the JCS being proposed to be carried forward to the GNLP in the Norwich fringe parishes, main towns and key service centres to keep pace with the likely build rates of development. The exception to this should be any brownfield sites, particularly those within Norwich, which should be prioritised into a “brownfield first” policy. This should form part of a phased approach to new housing, so that existing allocations from the JCS and any brownfield sites should be developed before permitting any additional allocated sites to be built-out.
One effective way to prevent the unnecessary loss of much greenfield land would be to institute a green belt on the “green wedges” model around Norwich, as requested by 84 respondents and 1,912 petition signatories (currently at 2,200 signatures) calling for this according to the draft statement of consultation, September 2018, for the Stage A Regulation 18 Site Proposals and Growth Options consultation. CPRE Norfolk is very concerned that this proposal or option has been removed from the current consultation.

In conclusion for this question, we find that the vision and objectives contain serious flaws, especially in regard to the way in which they conflict with policies within the current Local Plan, which withstood the rigorous inspection process.

Q9 Do you support, object, or have any comments relating to the approach to Housing set out in the Delivery Statement?

This states that ‘this plan also provides choice and flexibility by ensuring there are enough committed sites to accommodate 9% more homes than “need”.’ CPRE Norfolk disagrees that such a high level of sites should be provided within the GNLP. As a starting point please refer to our response to Q3 where we argue that the insistence of the Government to use the 2014 National Household Projections should be challenged to ensure that the most up-to date figures are used instead. In addition, by proposing not to include windfalls in the buffer the over-allocation of unnecessary housing will be compounded further.

It is very disappointing that there is no mention of phasing as an option within the Draft Plan and Housing Delivery Statement, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%) have supported CPRE Norfolk on this issue and have signed a pledge to this effect. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward.

Q12 Do you support, object, or have any comments relating to the Climate Change Statement?

Given the stated measures in the Climate Change Statement, it is impossible to see how the proposed additional allocation of sites for housing in “village clusters” can be justified. Furthermore, it is stated that ‘growth in villages is located where there is good access to services to support their retention’, when this is rarely the case beyond providing a primary school with sufficient places or room for expansion. Many services are simply not located within the “village clusters” with many additional vehicle journeys being an inevitable consequence of such housing allocations. Therefore, these would be contrary to measures 2 and 3 of the Climate Change Statement.

By locating additional housing in “village clusters” there would be an increased need to travel, particularly by private car, due to the lack of viable and clean public transport. If Climate Change is seriously going to be addressed then it is unacceptable to allocate additional sites for housing in rural areas which are not at all, or poorly served by public transport. New housing must be located where jobs and a wide range of services are or can be provided.

In addition CPRE Norfolk is concerned by the lack of any detailed policy on the design of new housing in the draft Plan document, other than a brief mention in the ‘Design of development’ in the Climate Change Statement. Detailed requirements to insist that new houses are built to the highest possible environmental standards beyond the Government’s minimum standards are needed, if serious steps are to be taken towards addressing Climate Change issues.

Q13 Do you agree with the proposed Settlement Hierarchy and the proposed distribution of housing within the hierarchy?

We supported the continuation of the settlement hierarchy as defined in the JCS. We wonder why and where the concept of “village clusters” has been introduced into the planning process. For many reasons they appear to be a flawed unsustainable concept. A real strength of the JCS was its inclusion of a Norwich Policy Area and Rural Policy Areas, and therefore we are very disappointed that this distinction has been abolished. The Rural Policy Areas gave real protection to the countryside: this is threatened by the introduction of the village cluster approach. This is another example of how the Draft GNLP contradicts the existing agreed Local Plan.

As noted above in our response to Q1 CPRE Norfolk has serious misgivings about the separation of the sites and allocations for new housing in the South Norfolk Village Clusters from the rest of the GNLP and its current consultation. In addition, we strongly object to the use of the open-ended statement that these South Norfolk “village clusters” will be allocated a ‘minimum’ of 1,200 houses, rather than giving a maximum number as is the case for the Broadland “village clusters”. If the reason for this separation is, as was given at the recent GNDP meeting of 6th January 2020, the lack of suitable sites coming forward in these South Norfolk “village clusters”, then this gives another good reason why the delivery of housing should be phased. Clearly the sites included in the JCS have undergone rigorous assessment and their inclusion in the Local Plan is an acknowledgement of their suitability for development. It makes absolute sense that these suitable sites should be developed first especially given the fact that any new sites coming forward are deemed to be unsuitable.

Paragraph 163d states that the strategy for location of growth ‘focusses reasonable levels of growth in the main towns, key service centres and village clusters to support a vibrant rural economy’, before suggesting that the approach to “village clusters” is ‘innovative’. The claim that providing new housing in such locations will support services is, we contend, largely illusory. Instead, additional new housing will lead to more car and delivery vehicle journeys, with residents travelling longer journeys to access the services they require such as health services and a supermarket. Given that the majority of any such new houses will be larger “family” homes, with children just or more likely to be of secondary or tertiary school or college age than of primary school age. This will have further impacts on carbon reduction due to the additional journeys needed to secondary schools or colleges.

It is clearly demonstrated in the table on page 80 of the 23 June 2017 GNDP Board Papers that the most reasonable option for the distribution of housing in terms of the environment (e.g. minimising air, noise and light pollution; improving well-being; reducing C02 emissions; mitigating the effects of climate change; protecting and enhancing biodiversity and green infrastructure; promoting the efficient use of land; respecting the variety of landscape types in the area; ensuring that everyone has good quality housing of the right size; maintaining and improving the quality of life; reducing deprivation; promoting access to health facilities and healthy lifestyles; reducing crime and the fear of crime; promoting access to education and skills; encouraging economic development covering a range of sectors and skill levels to improve employment opportunities for residents and maintaining and enhancing town centres; reducing the need to travel and promoting the use of sustainable transport modes; conserving and enhancing the historic environment and heritage assets; minimising waste generation; promoting recycling; minimising the use of the best agricultural land; maintaining and enhancing water quality and its efficient use) is Option 1: urban concentration close to Norwich. In terms of all these factors taken together the least desirable option as shown on this chart is Option 4: dispersal. We therefore strongly support urban concentration in and close to Norwich as the way forward, because it is best for the environment, minimising climate change and the well-being of residents.

There is very little economic evidence to suggest that cementing new housing estates on the edges of villages will bring any boost to local services, but rather they will put a strain on these services, where they exist.

We cannot understand why the table showing the same set of factors in the Interim Sustainability Appraisal for the GNLP on page 42 shows some different results from the table on page 80 of the 23 June 2017 GNDP Board Papers. While the most recent table confirms that overall urban concentration is a better option than dispersal, it is even clearer in the earlier version. The table on page 42 shows that urban concentration is better than dispersal in terms of: minimising air, noise and light pollution; improving well-being; reducing C02 emissions; mitigating the effects of climate change; protecting and enhancing biodiversity and green infrastructure; encouraging economic development covering a range of sectors and skill levels to improve employment opportunities for residents and maintaining and enhancing town centres; reducing the need to travel and promoting the use of sustainable transport modes. However, in terms of some of the other factors it seems that changes have been made to the table so that several options appear to be equal in terms of impacts, instead of showing what the earlier table demonstrated, which is that concentration was the best option and dispersal the least reasonable option.

Given the clear benefits and advantages from these documents for the environment, climate change and other areas, as well as other reservations around lack of sustainability and issues of delivery, we strongly urge the GNDP to remove the requirement for additional new sites for housing in the “village clusters” from the GNLP.

Q14 Do you support, object, or wish to comment on the approach for housing numbers and delivery?

Paragraph 145 claims that the strategy ‘is informed by consultation feedback’, yet chooses to ignore much from previous consultations even where such feedback was significantly in favour of a particular approach. An example of this is the position taken towards windfalls. Responses to the Stage A Regulation 18 Site Proposals and Growth Options consultation were significantly against (110 to 45) counting windfalls in addition to the additional (at that point 7,200) housing, and yet this has been ignored in the current draft plan consultation. By not counting windfalls in the calculation for housing numbers in table 6, there will be a resulting over-supply of houses, particularly if the out-of-date 2014 National Housing Projections are used. Windfalls are acknowledged as a reliable source of new housing and many Local Authorities do count them towards their housing targets: their contribution towards housing targets in the GNLP should lead to a reduction in the number of new sites which are allocated.

CPRE Norfolk also has specific concerns about the approach for housing numbers in the South Norfolk Village Clusters, as there is no total figure given for this new housing, but instead an open-ended ‘minimum of 1,200 homes’. This use of the word “minimum” needs to be removed and replaced by a “maximum” total, so that further potential over-supply is avoided. At best, the actual delivery of new housing in the plan area has just exceeded 2,000 dwellings per annum, with 1,500 being more typical. At this build-rate, current commitments cover actual housing need to 2038.

CPRE Norfolk wants to see sites allocated for housing in the existing plan (JCS) developed before any new sites that are likely to be added in to the emerging GNLP are built out. Although we understand that it will not be possible to prevent new sites being included in the plan, we are asking that these extra land allocations for housing are treated as phased development and that building should not occur on these sites until the current JCS sites have been used up. We think this is a sensible approach because not only does it protect the countryside, but also at current rates of house building there is enough land already allocated in the JCS to cater for the building that is likely to occur over the new Plan period.

There is very little evidence to show that increasing the amount of land on which houses can be built actually increases the rate at which they are built. All that happens is that developers ‘cherry-pick’ the most profitable sites, which are likely to be the newly allocated green field sites and that this will lead to even more land banking of currently allocated sites. This will also mean that many less sustainable (or as CPRE Norfolk would argue, unsustainable) sites for housing are developed rather than those with more sustainable locations. This would result in more pollution and congestion, with the negative consequences for the climate and climate change. It also means that expensive infrastructure which has been provided to facilitate new housing in the existing plan, could end up being an irrelevant and embarrassing white elephant.

It is disappointing that there is no mention of phasing as an option within the consultation document, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%)have supported CPRE Norfolk on this issue and have signed a pledge to this effect, which was included in the previous consultation, but ignored in the current draft Plan. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward. Clearly there is a democratic deficit: meaningful consultation should not ignore this volume of common-sense opinion.

Q18 Do you support, object or have any comments relating to the preferred approach to sustainable communities including the requirement for a sustainability statement?

Commenting on Policy 2 – Sustainable Communities, CPRE Norfolk questions the use of the words “as appropriate” in the policy’s introduction, as this means the requirements would be far too open to interpretation as to what is “appropriate” and therefore opportunities to ensure that ‘mitigating and adapting to climate change, [and] assisting in meeting national greenhouse gas emissions targets’ will be missed.

This concern is particularly relevant when considering how new housing development in the “village clusters” will fulfil the first requirement to ‘ensure safe, convenient and sustainable access to on-site and local services and facilities including schools, health care, shops, leisure/community/faith facilities and libraries.’ The rationale behind these “village clusters” appears to be mainly based on the availability and accessibility of a primary school. However, safe, convenient and sustainable access to the other features on this list are equally important. Adequate health care and shops simply are not available in these ways to many of the preferred new sites for housing in the “village clusters”, therefore giving further reasons why such sites should not be included in the GNLP.

There is a worrying disconnect between the aspirations in point 6 with the need to ‘manage travel demand and promote public transport and active travel within a clearly legible public realm’, and the imposition of additional new housing in “village clusters”. It is difficult if not impossible to see how residents of the majority of this new housing will be able to use active travel or public transport, due to the likely distances from workplaces and the lack of suitable public transport.

If additional new housing is developed in “village clusters” most of the working residents will not have ‘good access to services and local job opportunities’. Instead there will be an unsustainable increase in the number of journeys to and from work using private vehicles, which will not be electric-powered certainly for the majority of the plan period. It is very doubtful if additional housed will provide enough business to keep a village shop open, but they will definitely increase the number of journeys made for delivery and service vehicles, making this housing even more unsustainable.

If communities are to ‘minimise pollution’ as required to do so by point 8, it is imperative that no additional new housing is allocated to “village clusters”, as this would lead to an increase in petrol and diesel-powered vehicle journeys to and from such housing. This, along with the resultant increase in congestion, makes this additional housing highly undesirable.

Q19 Do you support, object or have any comments relating to the specific requirements of the policy?

We comment on various aspects of Table 8 relating to Policy 2.


Point 3, Green Infrastructure. The opening statement is: ‘Developments are required to provide on-site green infrastructure appropriate to their scale and location’. The three main benefits listed are biodiversity gain, promotion of active travel and the reduction of flood risk, which are key NPPF priorities.
The NPPF is also supportive of biodiversity on a more strategic scale, and the importance of ecological networks and Nature Recovery Networks. While Green Infrastructure is useful, and can play a role in these, it clearly has limitations in a wider role across the wider countryside, and in linking high designated nature conservation sites.
Point 5, Landscape, should recognise that valued landscapes often sit with good wildlife habitats. This is particularly the case for river valleys and the Broads. A strong message from the Environment Plan and the recommendations from the recent Landscapes Review is to make links between landscapes and wildlife, and not consider them in isolation. This is covered more fully in our response to Q21.
Point 9, Water. In our view it needs to be recognised that SUDS is not a silver bullet when dealing with flood risk. Areas of low-lying land with a high water-table can present a problem in ‘getting the water way’, and if it does manage to do that existing settlements can be put at risk.
A high level of growth puts a greater pressure on the capacity of Waste Water Treatment Works, both on the discharge of effluent into river systems, and on flood risk with foul water. This will be exacerbated by under or lagging investment in WWTW. Although not the responsibility of the Greater Norwich Authorities, their Annual Monitoring Reports (AMRs) should record and monitor incidents.

The statement in Point 9, Water - Key issues addressed by policy 2 states that: ‘Government policy expects local planning authorities to adopt proactive strategies to adapt to climate change, taking into account water supply and demand considerations. It allows local plans to set a higher standard of water efficiency than the Building Regulations where evidence justifies it. For housing development, only the higher Building Regulations standard for water prescribed by Government (110 litres per person per day) can [be] applied through local plans and more demanding standards cannot be set. If the potential to set more demanding standards locally is established by the Government in the future, these will be applied in Greater Norwich.’ The closing note at the bottom of the wording states: ‘Implementation of the standards for water efficiency will be supported by an updated advice note.’

We comment that it is imperative that Per Capita Consumption (PCC) of water is further reduced below the Government's prescribed 110 litres per person per day in order to deliver the statement made in Section 3, paragraph 129 which states: ‘Greater efficiency in water and energy usage will have minimised the need for new infrastructure, and further reductions in carbon emissions will be delivered through the increased use of sustainable local energy sources. New water efficient buildings will have also contributed to the protection of our water resources and water quality, helping to ensure the protection of our rivers, the Broads and our other wetland habitats.’ East Anglia is the driest region of the UK, our aquifers, rivers and wetlands are already at breaking point, as are many of the regions farmers who are seeing their abstraction licences reduced or revoked. If more demanding standards to reduce PPC water consumption are not set as part of the local plan, this will further adversely impact upon the environment, impacting upon the Broads and wetlands, which in turn will impact the regions aspirational growth for tourism and will severely impact the regional agricultural economy.

These pressures are further evidence as to why the amount of new housing should be tightly controlled.

Q21 Do you support, object or have any comments relating to the approach to the natural environment?

CPRE Norfolk supports further ‘development of a multi-functional green infrastructure network’. However, we have major concerns about how biodiversity net gain will be evaluated, assessed and measured, although it is recognised that at this point it is unclear as to what the legal requirements of this policy will be given the current progress of the Environment Bill.

Paragraphs 183 and 184 talk about the great weight placed on protecting the natural environment in Greater Norwich, but then there are no clear details on how this will be achieved. Provision of a Green Belt on a ‘green wedges’ model would go some way to addressing this.

This draft Plan takes a very narrow view on the NPPF and 25-Year Plan on policies for the natural environment, namely that strategy, aims and policies are restricted to considering only gain as seen through the prism of development. There is a duty to cooperate between Councils, and that should automatically happen. While implementation may be less direct, there should be a wider strategic vision that does support policies of the NNPF. CPRE Norfolk has a proposal for a Nature Recovery Network from the North Norfolk Coast to the east coast (including parts of the Broadland DC area), by the enhancement of the ecological network provided by our river systems, and supported by the environmental land management scheme. This includes a detailed planning and land management document for landscapes and wildlife relating to a Nature Recovery Network, which also include an AONB extension to the Norfolk Coast AONB into the full catchments of the twin North Norfolk rivers Glaven and Stiffkey.

Q22 Are there any topics which have not been covered that you believe should have been?

Yes, the decision to remove a possible green belt for Norwich on the green wedges (or other) model from the draft Local Plan is, in the opinion of CPRE Norfolk, unjustified, particularly bearing in mind the large degree of support it received in the earlier Stage A Regulation 18 Site Proposals and Growth Options consultation.

Q23 Do you support, object or have any comments relating to [the] approach to transport?

CPRE Norfolk supports the provision of new railway stations at Rackheath and especially Dussindale as outlined in paragraph 206.

We note the contradiction in the Transport for Norwich Strategy as reflected in Policy 4 – Strategic Infrastructure, when it aims ‘to promote modal shift’ by having ‘significant improvements to the bus, cycling and walking network’ on the one hand, but promotes ‘delivery of the Norwich Western Link road’ on the other. CPRE Norfolk fully supports the former set of aims while opposing the latter.

CPRE Norfolk supports ‘protection of the function of strategic transport routes (corridors of movement)’, and as part of this strongly suggests that no industrial development should be permitted on unallocated sites along such corridors of movement.

The desire to support ‘the growth and regional significance of Norwich Airport for both leisure and business travel to destinations across the UK and beyond’ surely contradicts the aspirations for addressing climate change stated within Section 4 of the draft GNLP?

Public transport provision needs to be improved and made affordable, not only between main towns and key service centres, but to and from smaller settlements. This is essential even without any further growth of these settlements, as many areas of rural Norfolk have become public transport deserts.

Q27 Do you support, object or have any comments to [the] approach to affordable homes?

CPRE Norfolk supports the affordable housing policy within Policy 5 – Homes. It is essential that the requirements of this policy are followed when progressing applications for housing on sites of 10 dwellings or more. Any policy which encourages the building of a greater proportion of affordable homes should be adopted. It is to be hoped that government policy will change further regarding viability tests so they become more transparent, so that it would be less easy for developers to evade their responsibilities to deliver affordable homes. More central government intervention is required if these needed homes are to be built. Ideally, affordable and social housing should be provided where needed as a stand-alone provision, and not be connected to private developers’ housing targets. Lessons must be learned from the history of poor delivery of affordable homes, to ensure that the policy to provide 28% or 33% affordable houses must be enforced. We support rural exception sites as a means of supplying needed local affordable and social housing. An approach based on the provision of stand-alone sites such as these, in our opinion is a far better method for addressing affordable and social housing needs.

Q34 Do you support, object or have any comments relating to the approach to employment land?

CPRE Norfolk while not agreeing with the allocation of so much green-field land for employment/economic use, it is essential that any such allocated sites are adhered to. This means that no exceptions should be made, particularly for larger businesses, to develop sites outside these allocated areas. If any such un-planned growth were to be permitted this would lead to further erosion of the area’s landscape and environment, along with issues regarding the sustainability of any such sites. A large amount of the land allocated in the JCS for employment use remains for use. The development of these sites should be prioritised before any new sites are added.

Q45 Do you support or object or wish to comment on the overall approach for the village clusters? Please identify particular issues.

“Village Clusters” appear to be an artificial concept, invented to justify the dispersal of housing into the countryside. It is difficult to understand the justification for changing the current settlement hierarchy within the JCS to that proposed in this draft plan, in particular by eliminating the JCS categories of Service Villages, Other Villages, smaller rural communities and the countryside, which provided opportunities for a more nuanced approach to housing allocation, appropriate to each category of community/settlement within their own setting, landscape and context. The “village cluster” approach is a relatively crude one, with much more of a ‘one size fits all’ approach. CPRE Norfolk is particularly disappointed to see that the current JCS settlement hierarchy is not even offered as an ‘alternative approach’ in the draft GNLP, and wishes to see this rectified.

Even if the “village clusters” are adopted it would still be important to limit these to the area within their settlement boundaries and to designate the remaining largely rural areas as “countryside”, which would then require a further policy similar to the current JCS policy 17: smaller rural communities and the countryside. It is a great regret that the Rural Policy Areas of the JCS will be eliminated in the GNLP, as these provided effective protection of the countryside from unnecessary development.

The different approach for “village clusters” in Broadland compared to those in South Norfolk is not acceptable given the emphasis on the GNLP being a strategic plan for the whole of Greater Norwich. The “village clusters” in Broadland and South Norfolk should be treated in the same way if they are to be included in the final GNLP. This means that a maximum number of new housing for both areas should be included in the GNLP rather than the current different approach/wording, by having Broadland’s “village clusters” providing ‘up to 480’ whereas South Norfolk is to provide ‘a minimum of 1,200’: both areas should have the same wording i.e. ‘up to …’. We are concerned that all of the “village clusters” in South Norfolk will not be scrutinised to the same degree as those in Broadland due to the separate South Norfolk Village Clusters Housing Site Allocations document.

CPRE Norfolk is concerned by the use of primary school catchments acting as ‘a proxy for social sustainability’, with apparently no other sustainability measures being taken into account when decided on the amount and location of housing within “village clusters”. This does not make the proposed allocated housing within “village clusters” sustainable as required by the NPPF. Other measures should be taken into account within the social, economic and environmental spheres.

Q46 Do you support or object or wish to comment on the approach for specific village clusters? Please identify particular issues.

We are concerned that all of the “village clusters” in South Norfolk will not be scrutinised to the same degree as those in Broadland due to the separate South Norfolk Village Clusters Housing Site Allocations document.

Q47 Do you support or object or wish to comment on the overall approach for Small Scale Windfall Housing Development? Please identify particular issues.

CPRE Norfolk feels that windfall development should be restricted to sites within settlement boundaries. Housing need is already catered for by other policies in the Plan. Windfall developments should also count towards overall housing targets.

Q48 Do you support or object or wish to comment [on] any other aspect of the draft plan not covered in other questions? This includes the appendices below. Please identify particular issues.

CPRE Norfolk does not understand why there has been a major change in direction and policy as to where new development should be allocated in the GNLP compared to the current JCS. The JCS was only finally fully adopted in January 2014, just over 6 years ago. In the JCS housing concentrated in and close to Norwich was agreed and supported by hugely expensive infrastructure projects, in particular the Northern Distributor Road (now known as the Broadland Northway), which was primarily constructed to distribute traffic form and to new housing developments on the northern fringes of Norwich and in the North-east Growth Triangle. It would be a massive and costly folly to change that policy to one which allowed for the dispersal of much housing across the rural areas of Broadland and South Norfolk, where there is insufficient infrastructure, services and public transport, which would mean such development would be unsustainable. This would only lead to more congestion and pollution, leading to problems in meeting carbon-reduction targets.

CPRE Norfolk wants to see sites allocated for housing in the existing plan (the JCS) developed before any new sites that are likely to be added in to the emerging GNLP are built on. Although we understand that it will not be possible to prevent new sites being included in the plan, we are asking that these extra land allocations for housing are treated as phased development and that building should not occur on these sites until the current JCS sites have been used up.

There is very little evidence to show that increasing the amount of land on which houses can be built actually increases the rate at which they are built. All that happens is that developers ‘cherry-pick’ the most profitable sites, which are likely to be the newly allocated green field sites and that this will lead to even more land banking of currently allocated sites.

It is very disappointing that there is no mention of phasing as an option within the consultation document, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%) have supported CPRE Norfolk on this issue and have signed a pledge to this effect. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward.

We question the relevance of a plan whose horizon is 2038, which is likely to be reviewed and replaced on at least three occasions before its end-date, and we fear that on each of these occasions more unsustainable housing will be crammed in at the expense of the countryside. What is perhaps most disturbing is that so many people living in the area are not aware of the current JCS let alone the emerging GNLP, and that where citizens are engaged in the process seem to have their views discounted. For example, this is clear where the views of over 38% of the Broadland and South Norfolk Parish and Town Councils regarding the phasing of housing development are apparently ignored. Current consultation processes are not reaching the majority of people: perhaps a Citizens’ Assembly approach would be a means which would enable more people to be involved.

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22696

Received: 16/03/2020

Respondent: Strutt & Parker LLP

Representation Summary:

[On behalf of Scott Properties Ltd]
22. In developing the new Greater Norwich Local Plan, it will be important that an adequate mix of sites is promoted including a proportion of smaller sites as well as sites to meet specific housing needs (including housing for older people). Our client’s site at Briar Farm, Harleston could make a meaningful and positive contribution towards meeting these goals.
23. With regard to the delivery of new housing, the Greater Norwich Local Plan’s inclusion of a 9% buffer is supported, and while a higher buffer of up to 20% would normally be advisable to offset the potential for slow delivery on some sites, in particular large strategic sites. It is acknowledged that no allowance has been made in this instance for windfall within the overall supply and the contingency of approximately 2,000 homes provides additional flexibility to ensure that the overall housing needs are met. However, as outlined above, given the uncertainty around the Carrow Works site (1,200 homes), it would be advisable to allocate smaller sites up to c. 25 units (c. 1 ha) across the Plan area to help boost the supply of new homes.
24. It is acknowledged that the Plan aims to comply with paragraph 68 of the NPPF by accommodating at least 10% of the housing requirement on sites no larger than 1 ha, however, where there are reasonable alternatives available these should be included to maintain supply and avoid the need to rely on less certain strategic sites or large contingency sites.
25. The “presumption in favour of sustainable development” is at the heart of the National Planning Policy Framework 2019 (NPPF). The Planning and Compulsory Purchase Act 2004 (Section 39(2)) establishes a legal requirement for Plans to be prepared with the objective of contributing to the achievement of sustainable development.
26. Paragraph 16 of the NPPF requires plans to be prepared positively in a way that is aspirational but deliverable. Paragraph 59 reminds Local Planning Authorities that the Government’s objective is to significantly boost the supply of homes and that it is therefore important that a sufficient amount and variety of land comes forward where it is needed.
27. To ensure that Local Authorities have specific deliverable sites they are required to maintain a 5 Year Housing Land Supply with an appropriate buffer. In addition, to ensure supply is maintained, they are also required to monitor the progress in building out sites, to comply with the housing delivery test. The Government’s recently published housing delivery figures for 2019 indicate delivery for the Greater Norwich area comprising Broadland, Norwich and South Norfolk to be at 140%. This is very encouraging, however, housing delivery can be fragile and susceptible to changes in the economy or delays in the delivery of key infrastructure necessary for strategic sites to come forward.
28. Further to the above, Policy 1 – The Sustainable Growth Strategy sets the settlement hierarchy for the Plan Area as follows:
1. Norwich Urban Area (Norwich and Norwich Fringe)
2. Main Towns
3. Key Service Centres
4. Village Clusters
29. Further detail on Village Clusters is provided at Appendix 5 of the Draft Strategy, as the preferred option the Council consider that a ‘cluster approach better reflects the way people access services in rural areas and enhances social sustainability by facilitating levels of growth in small villages’ This statement is supported, however it is unclear how this approach will work effectively within the Plan area and how achievable it will be. As such, a focus should be made on small and medium sites. The distribution of growth to a variety of sites will enable a steady delivery of homes and ensure the District can meet its housing targets throughout the Plan period.

Full text:

Please find attached the following documentation forming a consultation representation for the Greater Norwich Local Plan: Stage C Regulation 18 Draft Strategy and Site Allocations on behalf of my colleague, Adam Davies.

- Completed document for the following documents and questions:
- Draft Greater Norwich Local Plan – Part 1 The Strategy
- Question 6
- Question 9
- Question 11
- Question 12
- Question 13
- Question 14
- Question 16
- Question 17
- Question 18
- Question 25
- Question 29
- Question 32
- Question 41
- Question 42
- Question 48
- Draft Local Plan – Part 2 Site Allocations
- Policy GNLP2136
- Greater Norwich Local Plan Interim Viability Study (November 2019)
- Proving Layout
- Parameter Plan
- Pedestrian Access Plan
- Highways Technical Note
- Vehicular Access Proposals
- Barley Close Pedestrian Link
- Utilities Assessment
- Flood Risk Technical Note
- Infiltration Testing
- Preliminary Surface Water Attenuation Calculations
- Bat Scoping and Activity Survey
- Great Crested Newt and Amphibian Survey
- Reptile Survey
- Arboricultural Survey
- Archaeological and Heritage Assessment
- Noise Assessment

Attachments: