GNLP0223

Showing comments and forms 1 to 5 of 5

Object

Site Proposals document

Representation ID: 15467

Received: 21/03/2018

Respondent: Mr Nicholas Dennis

Representation Summary:

This development will increase pressure on already over stretched services:- GP's,schools, water supplies. It will make the current traffic situation on Stoke Rd., Proingland/ Poringland Rd., Stoke Holy Cross/ Long Lane even worse than it is now due to the continually clogged B1332 due to the excessive over development of Poringland/Stoke Holy Cross/ The Framinghams.
In short all the proposed developments in this area are not sustainable.

Full text:

This development will increase pressure on already over stretched services:- GP's,schools, water supplies. It will make the current traffic situation on Stoke Rd., Proingland/ Poringland Rd., Stoke Holy Cross/ Long Lane even worse than it is now due to the continually clogged B1332 due to the excessive over development of Poringland/Stoke Holy Cross/ The Framinghams.
In short all the proposed developments in this area are not sustainable.

Object

Site Proposals document

Representation ID: 15953

Received: 22/03/2018

Respondent: Mr Nicholas Dennis

Representation Summary:

Stoke Holy Cross/Poringland/The Framinghams/Caistor St. Edmund have taken and are still taking a huge increase in homes. The B1332 is overloaded and Stoke Road, Poringland/Poringland Road SHX/Long Lane is being used as a relief road to the B1332. Stoke Road, Poringland/Poringland Road SHX/Long Lane, can not cope with the extra volume of traffic already let alone what this scale of development will add. The GP surgeries are stretched to more than capacity as are water supplies.
Schools are over subscribed.
No more development in this area.

Full text:

Stoke Holy Cross/Poringland/The Framinghams/Caistor St. Edmund have taken and are still taking a huge increase in homes. The B1332 is overloaded and Stoke Road, Poringland/Poringland Road SHX/Long Lane is being used as a relief road to the B1332. Stoke Road, Poringland/Poringland Road SHX/Long Lane, can not cope with the extra volume of traffic already let alone what this scale of development will add. The GP surgeries are stretched to more than capacity as are water supplies.
Schools are over subscribed.
No more development in this area.

Object

Site Proposals document

Representation ID: 16051

Received: 22/03/2018

Respondent: Lynette Yaxley

Representation Summary:

This potential development site would encroach into the parish boundary of Stoke Holy Cross & would merge with the new housing developments in Poringland.
The local infrastructure cannot cope with any more development - NHS England East has stated that local medical facilities cannot cope.
There are insufficient places at local schools for all the extra children that this development would bring & local roads cannot cope with the existing volume of traffic.
This is outside the boundary set by the development plan & would reduce agricultural production, wildlife habitat & would contributes to the existing surface water drainage problems.

Full text:

This potential development site would encroach into the parish boundary of Stoke Holy Cross & would merge with the new housing developments in Poringland.
The local infrastructure cannot cope with any more development - NHS England East has stated that local medical facilities cannot cope.
There are insufficient places at local schools for all the extra children that this development would bring & local roads cannot cope with the existing volume of traffic.
This is outside the boundary set by the development plan & would reduce agricultural production, wildlife habitat & would contributes to the existing surface water drainage problems.

Object

Site Proposals document

Representation ID: 16415

Received: 19/03/2018

Respondent: Poringland Parish Council

Representation Summary:

GNLP0223 - Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into the form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues.. Isolated. OPPOSE

Full text:

Site Specifics

GNLP1032 - Favour: Site is to north of the village so would not create traffic through the village. Matches up the other side of the road. Against: Is Grade 2 ag land, and contributes to the linear vision of the village. SUPPORT

GNLP0485 - This huge site would at a stroke integrate Arminghall/Bixley with the Poringland conurbation. It has significant landscape, archaeological and environmental issues. It is far too far from any facilities and would be unsustainably reliant upon cars. OPPOSE

GNLP0131 - This is a smaller site but again unsustainably far from public transport, excessively reliant upon cars with no pavement in the vicinity and little prospect of being able to construct one. OPPOSE

GNLP0491 - This would significantly alter the form and size of Caistor St Edmund on archaeologically important site in open countryside. It is a form of 'backland' development. Access is severely limited. No access to public transport, no pavements to village and schools. OPPOSE

GNLP0494 - The access to this site is significantly constrained. Flood risk, no drainage, comes out very near a junction. OPPOSE

GNLP1047 - Access to this site is severely constrained. It is former RAF site so may well be subject to contamination. Site dominated by the mast towers. Form would consolidate development each side of the Stoke Road leading to further infill development. OPPOSE

GNLP0321 - Site is to north of the village so would not create traffic through the village. Matches up the other side of the road. However is Grade 2 agricultural land, and contributes to the linear vision of the village. SUPPORT

GNLP0589A - This would exacerbate the 'octopus' nature of the conurbation and would detract from an area of scenic value otherwise sadly lacking in this area. OPPOSE

GNLP0589B - Leading on from the development of the Long Road, Hibbett and Key site and the EACH site this would be a logical development. It would mean the loss of significant landscape value in Spur Lane. If it could be developed at a distance from the tree lined Spur Lane it might well be viable. Will have a significant impact upon the subterranean drainage flow towards Long Road and Poringland surface water drainage systems. SUPPORT

GNLP0391A - Flooding issues. Road network not suitable. Semi-detached from the village - contributing to the 'octopus' of development with drainage issues. Intrudes upon an area of landscape value between Framingham Earl and St Andrew's Church. OPPOSE

GNLP0391B - Similar arguments to those against the site south of Burgate Lane. OPPOSE

GNLP0003 - Isolated site in open countryside, contrary to policy, detached from the conurbation should not even be considered as a valid site. OPPOSE

GNLP0223 - Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into the form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues.. Isolated. OPPOSE

GNLP0169 - Would contribute to the disjointed form of development of the conurbation. Extends beyond the comfortable walking/ cycling distance to schools, doctors and shopping. Makes the village an 'octopus' with its tentacles extending into open countryside. Dominant over the village approaches from Shotesham. OPPOSE

GNLP0316 - Land North of Bungay Road, east of Rectory Lane and south of White House. This land has significant environmental assets, hedges ponds - it would require a significant environmental audit. Would contribute to the perceived linear vision of the conurbation. Site has significant landscape value as the headwaters of the Well Beck and is one of the few views of landscape available to the road traveller between Poringland and Brooke. OPPOSE

GNLP0280 - Some problems over access, perhaps requiring the demolition of one house. Drainage problems. Disconnected from the built form of the conurbation. Would contribute to the linear form of the conurbation. OPPOSE

GNLP0323 - would be a welcome development if access along the lane can be seen as adequate. OPPOSE

Object

Site Proposals document

Representation ID: 16582

Received: 11/03/2018

Respondent: Mr John Henson

Representation Summary:

Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into an form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues. Favoured by GNLP doc. Oppose

Full text:

Bixley
1. GLNP1032 Site to north of B1332 Boundary Farm: This site would contribute dramatically to the linear vision of the conurbation. Grade 2 agricultural land. Drainage problems However it could offer industrial and employment spaces necessary in this conurbations.

Caistor St Edmund
2. GNLP0485 This huge site would at a stroke integrate Arminghall/Bixley with the Poringland conurbation. It has significant landscape, archaeological and environmental issues . It is far too far from any facilities and would be unsustainably reliant upon cars. Oppose

3. GNLP0131 This is a smaller site but again unsustainably far from public transport, excessively reliant upon cars with no sidewalk in the vicinity and little prospect of being able to construct one. Oppose

4. GNLP0491 This would significantly alter the form and size of Caistor St Edmund on archaeologically important site in open countryside. It is a form of 'backland' development. Access is severely limited. No access to public transport, no sidewalks to village and schools. Oppose

Stoke
5. GNLP0494 The access to this site is significantly constrained. Oppose

6. GNLP1047 Access to this site is severely constrained. It is former RAF site so may well be subject to contamination. Site dominated by the microwave towers. Form would consolidate development each side of the Stoke Road leading to further infill development. Oppose

Framingham Earl/Pigot
7. GNLP0321 To North of B1332 next Boundary Farm - detached from the conurbation by Poringland Wood. Contribute to the linear profile of the conurbation. This could offer employemnt and business opportunities that the conurbation is dramatically short of.

8. GNLP0589-A This would exacerbate the 'octopus' nature of the conurbation and would detract from an area of scenic value otherwise sadly lacking in this area. Favoured by GNLP. Opposed

9. GNLP0589-B Leading on from the development of the Long Road, Hibbett and Key site and the EACH site this would be a logical development. It would mean the loss of significant landscape value in Spur Lane. If it could be developed at a distance from the tree lined Spur Lane it might well be viable. Will have a significant impact upon the subterranean drainage flow towards Long Road and Poringland surface water drainage system. Favoured by GNLP. The overall triangle site has already been intruded upon and there is no reason not to develop the whole Pigot Lane Spur Lane and Long Road area.

10. GNLP0391-A East of Hall Road - semi-detached from the village - contributing to the 'octopus' of development with drainage issues. Intrudes upon an an area of landscape value between Fram Earl and St Andrew's Church. Oppose

11. GNLP0391-B North of Burgate Lane Similar arguments to those against the site south of Burgate Lane Oppose

12. GNLP0003 Isolated site in open countryside, contrary to policy, detached from the conurbation should not even be considered as a valid site. Oppose

Poringland
13. GNLP0223 Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into an form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues. Favoured by GNLP doc. Oppose

14. GNLP0169 Would contribute to the disjointed form of development of the conurbation. Extends beyond the comfortable walking/ cycling distance to schools, doctors and shopping. Makes the village an 'octopus' with its tentacles extending into open countryside. Dominant over the village approaches from Shotesham. Favoured by GNLP. Oppose

15. GNLP0316 Land North of Bungay Road, east of Rectory Lane and south of White House. This land has significant environmental assets, hedges ponds - it would require a significant environmental audit. Would contribute to the perceived linear vision of the conurbation. Site has significant landscape value as the headwaters of the Well Beck and is one of the few views of landscape available to the road traveller between Poringland and Brooke. Oppose

16. GNLP0280 Some problems over access, perhaps requiring the demolition of one house. Drainage problems. Disconnected from the built form of the conurbation. Would contribute to the linear form of the conurbation. Oppose