GNLP0223
Object
Site Proposals document
Representation ID: 15467
Received: 21/03/2018
Respondent: Mr Nicholas Dennis
This development will increase pressure on already over stretched services:- GP's,schools, water supplies. It will make the current traffic situation on Stoke Rd., Proingland/ Poringland Rd., Stoke Holy Cross/ Long Lane even worse than it is now due to the continually clogged B1332 due to the excessive over development of Poringland/Stoke Holy Cross/ The Framinghams.
In short all the proposed developments in this area are not sustainable.
This development will increase pressure on already over stretched services:- GP's,schools, water supplies. It will make the current traffic situation on Stoke Rd., Proingland/ Poringland Rd., Stoke Holy Cross/ Long Lane even worse than it is now due to the continually clogged B1332 due to the excessive over development of Poringland/Stoke Holy Cross/ The Framinghams.
In short all the proposed developments in this area are not sustainable.
Object
Site Proposals document
Representation ID: 15953
Received: 22/03/2018
Respondent: Mr Nicholas Dennis
Stoke Holy Cross/Poringland/The Framinghams/Caistor St. Edmund have taken and are still taking a huge increase in homes. The B1332 is overloaded and Stoke Road, Poringland/Poringland Road SHX/Long Lane is being used as a relief road to the B1332. Stoke Road, Poringland/Poringland Road SHX/Long Lane, can not cope with the extra volume of traffic already let alone what this scale of development will add. The GP surgeries are stretched to more than capacity as are water supplies.
Schools are over subscribed.
No more development in this area.
Stoke Holy Cross/Poringland/The Framinghams/Caistor St. Edmund have taken and are still taking a huge increase in homes. The B1332 is overloaded and Stoke Road, Poringland/Poringland Road SHX/Long Lane is being used as a relief road to the B1332. Stoke Road, Poringland/Poringland Road SHX/Long Lane, can not cope with the extra volume of traffic already let alone what this scale of development will add. The GP surgeries are stretched to more than capacity as are water supplies.
Schools are over subscribed.
No more development in this area.
Object
Site Proposals document
Representation ID: 16051
Received: 22/03/2018
Respondent: Lynette Yaxley
This potential development site would encroach into the parish boundary of Stoke Holy Cross & would merge with the new housing developments in Poringland.
The local infrastructure cannot cope with any more development - NHS England East has stated that local medical facilities cannot cope.
There are insufficient places at local schools for all the extra children that this development would bring & local roads cannot cope with the existing volume of traffic.
This is outside the boundary set by the development plan & would reduce agricultural production, wildlife habitat & would contributes to the existing surface water drainage problems.
This potential development site would encroach into the parish boundary of Stoke Holy Cross & would merge with the new housing developments in Poringland.
The local infrastructure cannot cope with any more development - NHS England East has stated that local medical facilities cannot cope.
There are insufficient places at local schools for all the extra children that this development would bring & local roads cannot cope with the existing volume of traffic.
This is outside the boundary set by the development plan & would reduce agricultural production, wildlife habitat & would contributes to the existing surface water drainage problems.
Object
Site Proposals document
Representation ID: 16415
Received: 19/03/2018
Respondent: Poringland Parish Council
GNLP0223 - Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into the form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues.. Isolated. OPPOSE
Site Specifics
GNLP1032 - Favour: Site is to north of the village so would not create traffic through the village. Matches up the other side of the road. Against: Is Grade 2 ag land, and contributes to the linear vision of the village. SUPPORT
GNLP0485 - This huge site would at a stroke integrate Arminghall/Bixley with the Poringland conurbation. It has significant landscape, archaeological and environmental issues. It is far too far from any facilities and would be unsustainably reliant upon cars. OPPOSE
GNLP0131 - This is a smaller site but again unsustainably far from public transport, excessively reliant upon cars with no pavement in the vicinity and little prospect of being able to construct one. OPPOSE
GNLP0491 - This would significantly alter the form and size of Caistor St Edmund on archaeologically important site in open countryside. It is a form of 'backland' development. Access is severely limited. No access to public transport, no pavements to village and schools. OPPOSE
GNLP0494 - The access to this site is significantly constrained. Flood risk, no drainage, comes out very near a junction. OPPOSE
GNLP1047 - Access to this site is severely constrained. It is former RAF site so may well be subject to contamination. Site dominated by the mast towers. Form would consolidate development each side of the Stoke Road leading to further infill development. OPPOSE
GNLP0321 - Site is to north of the village so would not create traffic through the village. Matches up the other side of the road. However is Grade 2 agricultural land, and contributes to the linear vision of the village. SUPPORT
GNLP0589A - This would exacerbate the 'octopus' nature of the conurbation and would detract from an area of scenic value otherwise sadly lacking in this area. OPPOSE
GNLP0589B - Leading on from the development of the Long Road, Hibbett and Key site and the EACH site this would be a logical development. It would mean the loss of significant landscape value in Spur Lane. If it could be developed at a distance from the tree lined Spur Lane it might well be viable. Will have a significant impact upon the subterranean drainage flow towards Long Road and Poringland surface water drainage systems. SUPPORT
GNLP0391A - Flooding issues. Road network not suitable. Semi-detached from the village - contributing to the 'octopus' of development with drainage issues. Intrudes upon an area of landscape value between Framingham Earl and St Andrew's Church. OPPOSE
GNLP0391B - Similar arguments to those against the site south of Burgate Lane. OPPOSE
GNLP0003 - Isolated site in open countryside, contrary to policy, detached from the conurbation should not even be considered as a valid site. OPPOSE
GNLP0223 - Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into the form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues.. Isolated. OPPOSE
GNLP0169 - Would contribute to the disjointed form of development of the conurbation. Extends beyond the comfortable walking/ cycling distance to schools, doctors and shopping. Makes the village an 'octopus' with its tentacles extending into open countryside. Dominant over the village approaches from Shotesham. OPPOSE
GNLP0316 - Land North of Bungay Road, east of Rectory Lane and south of White House. This land has significant environmental assets, hedges ponds - it would require a significant environmental audit. Would contribute to the perceived linear vision of the conurbation. Site has significant landscape value as the headwaters of the Well Beck and is one of the few views of landscape available to the road traveller between Poringland and Brooke. OPPOSE
GNLP0280 - Some problems over access, perhaps requiring the demolition of one house. Drainage problems. Disconnected from the built form of the conurbation. Would contribute to the linear form of the conurbation. OPPOSE
GNLP0323 - would be a welcome development if access along the lane can be seen as adequate. OPPOSE
Object
Site Proposals document
Representation ID: 16582
Received: 11/03/2018
Respondent: Mr John Henson
Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into an form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues. Favoured by GNLP doc. Oppose
Bixley
1. GLNP1032 Site to north of B1332 Boundary Farm: This site would contribute dramatically to the linear vision of the conurbation. Grade 2 agricultural land. Drainage problems However it could offer industrial and employment spaces necessary in this conurbations.
Caistor St Edmund
2. GNLP0485 This huge site would at a stroke integrate Arminghall/Bixley with the Poringland conurbation. It has significant landscape, archaeological and environmental issues . It is far too far from any facilities and would be unsustainably reliant upon cars. Oppose
3. GNLP0131 This is a smaller site but again unsustainably far from public transport, excessively reliant upon cars with no sidewalk in the vicinity and little prospect of being able to construct one. Oppose
4. GNLP0491 This would significantly alter the form and size of Caistor St Edmund on archaeologically important site in open countryside. It is a form of 'backland' development. Access is severely limited. No access to public transport, no sidewalks to village and schools. Oppose
Stoke
5. GNLP0494 The access to this site is significantly constrained. Oppose
6. GNLP1047 Access to this site is severely constrained. It is former RAF site so may well be subject to contamination. Site dominated by the microwave towers. Form would consolidate development each side of the Stoke Road leading to further infill development. Oppose
Framingham Earl/Pigot
7. GNLP0321 To North of B1332 next Boundary Farm - detached from the conurbation by Poringland Wood. Contribute to the linear profile of the conurbation. This could offer employemnt and business opportunities that the conurbation is dramatically short of.
8. GNLP0589-A This would exacerbate the 'octopus' nature of the conurbation and would detract from an area of scenic value otherwise sadly lacking in this area. Favoured by GNLP. Opposed
9. GNLP0589-B Leading on from the development of the Long Road, Hibbett and Key site and the EACH site this would be a logical development. It would mean the loss of significant landscape value in Spur Lane. If it could be developed at a distance from the tree lined Spur Lane it might well be viable. Will have a significant impact upon the subterranean drainage flow towards Long Road and Poringland surface water drainage system. Favoured by GNLP. The overall triangle site has already been intruded upon and there is no reason not to develop the whole Pigot Lane Spur Lane and Long Road area.
10. GNLP0391-A East of Hall Road - semi-detached from the village - contributing to the 'octopus' of development with drainage issues. Intrudes upon an an area of landscape value between Fram Earl and St Andrew's Church. Oppose
11. GNLP0391-B North of Burgate Lane Similar arguments to those against the site south of Burgate Lane Oppose
12. GNLP0003 Isolated site in open countryside, contrary to policy, detached from the conurbation should not even be considered as a valid site. Oppose
Poringland
13. GNLP0223 Significant access problems with no comfortable access through the Norfolk Homes development. Would alter significantly the 'shape' of the conurbation into an form of an 'octopus'. Would reduce the distinctions between Poringland and Stoke. Would have significant Governance issues between Stoke and Poringland. Would significantly negatively alter the drainage problems of Boundary Way - known surface water, flooding issues. Favoured by GNLP doc. Oppose
14. GNLP0169 Would contribute to the disjointed form of development of the conurbation. Extends beyond the comfortable walking/ cycling distance to schools, doctors and shopping. Makes the village an 'octopus' with its tentacles extending into open countryside. Dominant over the village approaches from Shotesham. Favoured by GNLP. Oppose
15. GNLP0316 Land North of Bungay Road, east of Rectory Lane and south of White House. This land has significant environmental assets, hedges ponds - it would require a significant environmental audit. Would contribute to the perceived linear vision of the conurbation. Site has significant landscape value as the headwaters of the Well Beck and is one of the few views of landscape available to the road traveller between Poringland and Brooke. Oppose
16. GNLP0280 Some problems over access, perhaps requiring the demolition of one house. Drainage problems. Disconnected from the built form of the conurbation. Would contribute to the linear form of the conurbation. Oppose