The proposed development would have an adverse impact on traffic safety, sewerage and surface water run off. The surrounding roads are relatively narrow and a "rat run" at peak times, making them dangerous for cyclists and walkers/runners. Surface water run off is an issue during periods of sustained rainfall, when water runs down Long Lane like a stream. The proposed development would have a significant visual impact on the area. The village currently remains relatively rural . Further development would effectively join Stoke Holy Cross to Upper Stoke and Poringland beyond, destroying the village's character.

Full text:

The proposed development would have an adverse impact on traffic safety, sewerage and surface water run off. The surrounding roads are relatively narrow and a "rat run" at peak times, making them dangerous for cyclists and walkers/runners. Surface water run off is an issue during periods of sustained rainfall, when water runs down Long Lane like a stream. The proposed development would have a significant visual impact on the area. The village currently remains relatively rural . Further development would effectively join Stoke Holy Cross to Upper Stoke and Poringland beyond, destroying the village's character.

Object

Site Proposals document

Representation ID: 13844

Received: 12/03/2018

Respondent: Ms Carina Cobbold

Representation Summary:

1. Sufficient allocation in the vicinity already for which impact should be realised first.
2. Road network insufficient, safety and capacity issues.
3. Infrastructure - already insufficient provision for water, sewerage and surface water run off.
4. Local visual and amenity impact. Allocation and development will double the size of SHC.
5. Green infrastructure - not required. Upgrade to community centre/playing field and second phase of Hopkins provided play area and a common.
6. Public realm provision already insufficient e.g schools.
7. Lack of amenities - village amenities which are insufficient to service a settlement double the size.

Full text:

1. There has already been considerable development within SHC, the full effects of which are yet to be realised, especially the impact upon the amenities and infrastructure. Surely we need to see the sites allocated under the existing plan developed out before adding additional land.
2. Road network - this is already under increasing pressure from the existing developments, with usage set to rise (along with disruption). The recent inclement weather served to highlight the deficiencies. On two days all means of access and egress from SHC were closed.
3. Infrastructure - the water, sewerage and surface water run off provision is already not sufficient for the developments which have taken place, how will this be accommodated with yet further development.
4. This site, along with the two other sites in this area, will change the feel and attraction of Lower Stoke from a desirable green belt location to one to be avoided. If all sites are allocated the effect will be to double the size of SHC.
5. We do not require any further green space - there has already been upgrade works to the communal playing field and the second Hopkins phase provides play space and a green/common.
6. Public realm provision is already insufficient when taking account of the existing consented developments (especially when considered alongside the developments at Poringland ) e.g. school provision.
7. Public services - SHC is a small settlement with a local shop and no other amenities of this nature. Doubling the size of SHC will only exacerbate this.

Object

Site Proposals document

Representation ID: 13991

Received: 14/03/2018

Respondent: Mr Simon Harper

Representation Summary:

Significant further development in Stoke Holy Cross over and above the existing 85 dwellings on Housing Commitment Sites in the village is neither required nor sensible because of the adverse impact on water supply, sewerage, surface water run-off/flooding, road traffic, amenities and character which are already stretched for the existing community.

Full text:

1.Sufficient allocation in Stoke Holy Cross already with 85 "remaining dwellings" as at 1/4/2017 per the GNLP Site Proposals document, across 3 existing and separate sites.
2.Water supply and sewerage provision is already overstretched and insufficient for more homes in SHC over and above those recently agreed and under construction. Long Lane in SHC is regularly closed for long periods for attention to burst pipes.
3.Surface water run-off is already a major problem with frequent flooding already experienced in gardens of occupied homes on the existing Salamanca development site. Adjacent significant development would exacerbate this issue.
4.Road traffic. Surrounding roads are narrow and are not conducive to a significant increase in road traffic movements, particularly with a Primary School situated on the main road thoroughfare of Long Lane.
5.Lack of amenities eg. shops, medical facilities, dentist etc. Village amenities are already insufficient to serve the existing community of SHC, never mind a significant increase in the size of that community.
6. Character. Proposed development would have a significant visual impact on the village and adversely affect the existing character of it.

Object

Site Proposals document

Representation ID: 14036

Received: 15/03/2018

Respondent: Mrs Diane Barrell

Representation Summary:

Option1 is preferable due to potential traffic problems on the roads particularly long lane . Flooding, drainage, sewerage and water supply are also problems,in fact general facilities and infrastructure.

Full text:

I object as the roads in SHX are already inadequate for the amount of use and would not support furtherdevelopment. Long lane particularly is already dangerously congested at school drop off and pick up times. This is exaserpated by the narrowness of long lane outside the schoolup to the entrances to the Salamanca and Hopkins estates.. Further development would increase problems . The only accesses tothe A140are extremely narrow, with not enough room for two cars to easily pass. Increase use would increase the danger. This is also true of the road into Norwich via Long JohnHill particularly at the bridge overthe river which isvirtually single track on a bend.
Given the position of SHX in the river valley road development would be extremely difficult and spoil the natural beauty of the area.
There would alsobe a problemof water supply sewerage and drainage due to the heavy clay soil in the proposed areas.
The sensible optionin theGNLP would appear to be option 1 rather than destroying the balance between urban Norwich and ruralSouth Norfolk. This is the option supported by CPRE.

Object

Site Proposals document

Representation ID: 14037

Received: 15/03/2018

Respondent: Mr Ken Barrell

Representation Summary:

Option1 JCS seems to be the only sensible one in order to maintain the balance between city andcountry which would in the end benefit residents of both.

Full text:

This applies to all three possible sites in Stoke Holy Cross. The roads in SHX are not capable of coping with a further increase in traffic. This particularly applies to Long Lane which is already suffering from an increase in traffic to and from Porringland. In the morning when parents drop their children off at school, and in the afternoon, when they pick them up, the road is verycongested and waiting for an accident to happen, especially as their is barely room for a car andbus to pass each other.
Added tothis the problems of water supply ,sewerage and flooding would be increased. The character of SHX would be destroyed with such an increase in population.

Object

Site Proposals document

Representation ID: 14166

Received: 16/03/2018

Respondent: Stoke Holy Cross Parish Council

Representation Summary:

Stoke Holy Cross is a small village with limited facilities already under pressure from recent housing development of 140 homes
This 3.7 ha site is capable of accommodating over 100 dwellings adding further to concerns over infrastructure and services, additional traffic and air pollution. Both Long Lane, near to the school, and Norwich Road are already experiencing congestion at peak times. Both routes are relatively narrow, have a series of substandard junctions and limited or no pavements/ foot ways.
The development would represent severe intrusion into open countryside outside the settlement boundaries to the detriment of the existing landscape.

Full text:

Ref GNLP 0197 - Land to North of Ingram's 'Salamanca' Site, Long Lane
The Parish Council objects to development of this scale in this location for the following reasons:

* Stoke Holy Cross is a relatively small village with limited facilities that are already under pressure from the recent housing development that has taken place in the village.
* The proposed site is 3.7 ha in size and could accommodate in excess of 100 dwellings. Stoke Holy Cross has already had over 140 dwellings built over the last three years, representing a 33% increase in households in lower Stoke, where most facilities in the Parish are located. This scale of increase well exceeds that envisaged in the Joint Core Strategy that identified it as a village suitable for 20 dwellings, given its limited facilities. A further substantial development of this nature would therefore put severe pressure on existing infrastructure serving the village, and inevitably lead to the need for people to seek community facilities elsewhere, especially Poringland and Norwich. Apart from the inconvenience of this, there would be a consequent increase in traffic movements along roads which are already well trafficked.
* The development would increase the amount of traffic on Long Lane and Norwich Road through Stoke Holy Cross, which is already experiencing significantly higher traffic flows as a result of the new developments in the village and those from the major developments in Poringland. This would increase the amount of traffic past the school, which is already severely congested at peak traffic hours. It would also increase traffic using Norwich Road, through Stoke, which is relatively narrow, has a series of substandard junctions, and no pavements or footways along much of the route.
* The development would represent a severe intrusion into presently open countryside and spread the village beyond its 'natural' development boundaries and outside the settlement boundary, into the open fields beyond, to the detriment of the existing rural landscape.

Object

Site Proposals document

Representation ID: 14383

Received: 19/03/2018

Respondent: Mrs Christine Parnell

Representation Summary:

1) Traffic on Long Lane already extremely heavy for a country lane especially at peak times.

2) Surface water drainage inadequate as some gardens at newly built Salamanca development already flood after snow or heavy rain.

3) Sewage and fresh water systems inadequate for additional houses.

4) Visually development of any of the 3 sites proposed at Stoke Holy Cross would spoil the beautiful surrounding countryside close to the village.

5) Local amenities are already over stretched.

Full text:

1) Traffic on Long Lane already extremely heavy for a country lane especially at peak times.

2) Surface water drainage inadequate as some gardens at newly built Salamanca development already flood after snow or heavy rain.

3) Sewage and fresh water systems inadequate for additional houses.

4) Visually development of any of the 3 sites proposed at Stoke Holy Cross would spoil the beautiful surrounding countryside close to the village.

5) Local amenities are already over stretched.

Object

Site Proposals document

Representation ID: 14444

Received: 19/03/2018

Respondent: miss sandy collins

Representation Summary:

1. water/ sewerage existing not able to sufficiently cope with additional housing.
2. Problems with surface water/flooding will increase.
3. Village Demographics - having an older than average population which will further increase with new developments targeting 'higher end housing' will further stretch already stretched Services such as healthcare.
4. Road Network structure will face additional pressures and increase safety concerns.
5. Adverse impact on wildlife resulting in significant reductions.
6. Adverse impact on Stoke Primary and Framingham Earl High School.
7. Social Integration - would be put under further pressure.

Full text:

1. Water/sewerage - as a direct result of the recent residential builds on Long Lane; these services have been subject to an unacceptable deterioration in service levels - persistent burst pipes and reduced water pressure. Additional builds would further adversely impact existing infrastructures.
2. Surface Water run off is signifiant particularly impacting existing houses on Long Lane along with other areas in Stoke - due to the high water level tables/heavy clay soil and being in a valley. This run off will only increase as more dwellings go up, existing ditches etc will not cope with additional housing. Some Houses in 5 Acres were recently impacted by increased run off as a result of the WaterMill Meadow new development.
3. Village demographics already reflect a significantly older than average population than the average; further new housing would only increase pressure on already stretched existing services particularly health services such as the local Old Mill Surgery .
4. Road network - Existing network has already seen a massive increase in the volume of traffic - its been a long time issue for Long Lane as its used as a rat run for traffic coming from Poringland which passes straight by the Stoke Primary school and often at speed or without consideration of others . There are no current effective road calming measures in place along this stretch of road. Currently there is no pedestrian or cycle pathway to protect residents who want to walk/cycle between Lower and Upper Stoke, yet it's the local authorities current school transport policy that children from Lower Stoke are not eligible for a bus pass to take them to the local High School in Framingham Earl. Additional housing will add to the congestion and increase the risk of accidents occurring , particularly because of the blind bends and the hill this development will sit on .
5. Wildlife - This field buffer between Upper and Lower Stoke is essential for wildlife flora and fauna which currently contain skylarks, hares, newts, deer and even buzzards. Increased housing along here will squeeze out these welcome neighbours on an indiscriminate basis; destroying some of the very elements which attract new residents to the village.
6. Additional housing will not only impact Stoke Primary in the short Term ie until the run off of children from outside the catchment is completed in its natural course, but also Framingham Earl High which will be faced with increased demand from all the local villages who will also be impacted by additional housing demands.
7. Social Structure - Stoke's existing social structure has been recently challenged and stretched with the integration process of residents from the newly build developments. This ongoing process needs time to evolve and mature especially in a village where there are so few existing amenities to support the elderly to avoid the potential of them being isolated and the young to feel that they belong, being part of a community that cares. Encouraging such behaviours will hopefully nurture the natural social cohesion process and hopefully will result in the calming of any potential anti-social manifestations. Additional housing in such a short period of time would not help this bedding in process .

Object

Site Proposals document

Representation ID: 14711

Received: 20/03/2018

Respondent: Mr Robert Monument

Representation Summary:

The village already appears to be at capacity in terms of local infrastructure such as water and sewage. There are limited doctor and dental facilities with residents already needing to travel to Poringland for these services. With Poringland expanding at a significant speed, additional housing at such a close proximity will only compound the problem. The road between the village and Poringland is increasingly busy and becoming more dangerous particularly for pedestrians.

Full text:

The village already appears to be at capacity in terms of local infrastructure such as water and sewage. There are limited doctor and dental facilities with residents already needing to travel to Poringland for these services. With Poringland expanding at a significant speed, additional housing at such a close proximity will only compound the problem. The road between the village and Poringland is increasingly busy and becoming more dangerous particularly for pedestrians.

Object

Site Proposals document

Representation ID: 14979

Received: 20/03/2018

Respondent: Lynette Yaxley

Representation Summary:

Stoke Holy Cross has recently increased in size by over 33% - far beyond what was agreed in the previous LDP.
Problems residents experience with low water pressure, sewage overflows & surface water run offs would be exacerbated by further developments.
The village would completely lose its identity & become one sprawling mass of new developments, merging with Poringland & Framingham Earl.
The landscape of the Tas Valley will be destroyed, as will habitat for wildlife.
It is far more appropriate to develop brown field sites in & around Norwich, than build on productive agricutural land in Green Belt areas

Full text:

Stoke Holy Cross has recently increased in size by over 33% - far beyond what was agreed in the previous LDP.
Problems residents experience with low water pressure, sewage overflows & surface water run offs would be exacerbated by further developments.
The village would completely lose its identity & become one sprawling mass of new developments, merging with Poringland & Framingham Earl.
The landscape of the Tas Valley will be destroyed, as will habitat for wildlife.
It is far more appropriate to develop brown field sites in & around Norwich, than build on productive agricutural land in Green Belt areas

Object

Site Proposals document

Representation ID: 15307

Received: 21/03/2018

Respondent: Heather Fitzsimons

Representation Summary:

1. SHX is not a service village.
2. Main problem is impact of traffic and use as a cut through from A140 and A146. No public resources to address this.
3. Further development will only increase existing traffic impact.
4. Need for alternative transport options e.g.cycle lane to Norwich, footpath to Upper Stoke
5. Inadequate utility infrastructure
6. Lack of local health care provision and risk of overloading Poringland facilities
7. The destruction of SHX as a village as it merges with Poringland.

Full text:

In my view Stoke Holy Cross is wrongly classified as a service village having only a part time post office, a small village store and a fish and chip shop. These do not make a significant contribution to reducing road journeys to actual service centres such as Norwich.
The village is used as a cut through to Norwich due to the existing congestion on the A140 and road from Poringland to Norwich. Already over 800 cars per hour pass along Norwich Road during busy periods (speedwatch data) causing air, light and noise pollution and degrading village life. Any additional development will inevitably cause further deterioration. Norfolk County Council, Highways Dept and the Police currently state they are unable to effect any significant improvement due to lack of resources. This situation is not going to change in the short term.
There is a real need for a cycle path from the village into Norwich and for a footpath from the village to Upper Stoke to enable alternative safe transport methods.
I would agree wholeheartedly with other comments made concerning overload of drainage and sewage infrastructure and lack of access to local medical and dental services.
I am concerned about the destruction of the green areas between villages. SHX is in danger of becoming a suburb of Poringland and no longer a village.

Object

Site Proposals document

Representation ID: 15462

Received: 21/03/2018

Respondent: Mrs Lyn Marsh

Representation Summary:

The infrastructure of the surrounding area cannot handle any more housing development without significant investment to upgrade roads, improve footpaths/cycle facilities between Poringland and Stoke Holy Cross, upgrade the drainage and surface water system due to regular leakages on Long Lane and poor water pressure being experienced by existing parishioners. It is also the wider road network that will be affected if this site was allocated ie Mill Road and Markshall Lane which are used for accessing the A140 and which do not have footpaths for pedestrians. Would a developer provide a footpath and grit these roads?

Full text:

The infrastructure of the surrounding area cannot handle any more housing development without significant investment to upgrade roads, improve footpaths/cycle facilities between Poringland and Stoke Holy Cross, upgrade the drainage and surface water system due to regular leakages on Long Lane and poor water pressure being experienced by existing parishioners. It is also the wider road network that will be affected if this site was allocated ie Mill Road and Markshall Lane which are used for accessing the A140 and which do not have footpaths for pedestrians. Would a developer provide a footpath and grit these roads?

Support

Site Proposals document

Representation ID: 15594

Received: 22/03/2018

Respondent: A Squared Architects

Representation Summary:

If Stoke Holy Cross is identified as an option for growth, the land owner is flexible in terms of density. Parts of the site could be used for landscaping belts to provide a soft edge when viewed across the valley and any existing hedgerows could be retained. The site can be accessed via an existing development and there is space to incorporate SUDS strategies. The land owner would be happy to work with all local stake holders to ensure a suitable scheme is developed.

Full text:

If Stoke Holy Cross is identified as an option for growth, the land owner is flexible in terms of density. Parts of the site could be used for landscaping belts to provide a soft edge when viewed across the valley and any existing hedgerows could be retained. The site can be accessed via an existing development and there is space to incorporate SUDS strategies. The land owner would be happy to work with all local stake holders to ensure a suitable scheme is developed.

Comment

Site Proposals document

Representation ID: 15701

Received: 22/03/2018

Respondent: Mrs Anne Harper

Representation Summary:

1.Allocation of housing is sufficient in SHC already with 85 "remaining dwellings" per the GNLP Site Proposals document.
2.The water supply/sewerage provision is already overstretched.
3.Surface water run-off is already a major problem with frequent flooding in gardens of occupied homes on existing Salamanca development.
4.Surrounding roads are narrow-not conducive to a significant increase in road traffic movements.
5.Amenities are very limited in Stoke Holy Cross eg. shops, medical facilities, dentist even for existing community of SHC.
6.Proposed development would have a significant visual impact on SHC and adversely affect it's character.

Full text:

1.Allocation of housing is sufficient in SHC already with 85 "remaining dwellings" per the GNLP Site Proposals document.
2.The water supply/sewerage provision is already overstretched.
3.Surface water run-off is already a major problem with frequent flooding in gardens of occupied homes on existing Salamanca development.
4.Surrounding roads are narrow-not conducive to a significant increase in road traffic movements.
5.Amenities are very limited in Stoke Holy Cross eg. shops, medical facilities, dentist even for existing community of SHC.
6.Proposed development would have a significant visual impact on SHC and adversely affect it's character.

Object

Site Proposals document

Representation ID: 15737

Received: 22/03/2018

Respondent: Mr Trevor Lewis

Representation Summary:

As the current District Councillor for this site, I favour Option 1, Development Close to Norwich, but noting that
(a) This excludes South and South East Fringe Sectors, and limits village development to the current baseline.
(b) Windfall sites should not be added to the 7,200 homes required by this Plan,
(c) I favour a new settlement close to Norwich (possibly Mangreen) that would contribute to the 7,200.

On that basis, there is no need for development on this site, and Stoke Holy Cross has already received more development than was initially contemplated by the current local plan.

Full text:

As the current District Councillor for this site, I favour Option 1, Development Close to Norwich, but noting that
(a) This excludes South and South East Fringe Sectors, and limits village development to the current baseline.
(b) Windfall sites should not be added to the 7,200 homes required by this Plan,
(c) I favour a new settlement close to Norwich (possibly Mangreen) that would contribute to the 7,200.

On that basis, there is no need for development on this site, and Stoke Holy Cross has already received more development than was initially contemplated by the current local plan.

Object

Site Proposals document

Representation ID: 15961

Received: 22/03/2018

Respondent: Mr Nicholas Dennis

Representation Summary:

Stoke Holy Cross/Poringland/The Framinghams/Caistor St. Edmund have taken and are still taking a huge increase in homes. The B1332 is overloaded and Stoke Road, Poringland/Poringland Road SHX/Long Lane is being used as a relief road to the B1332. Stoke Road, Poringland/Poringland Road SHX/Long Lane, can not cope with the extra volume of traffic already let alone what this scale of development will add. The GP surgeries are stretched to more than capacity as are water supplies.
Schools are over subscribed.
No more development in this area.

Full text:

Stoke Holy Cross/Poringland/The Framinghams/Caistor St. Edmund have taken and are still taking a huge increase in homes. The B1332 is overloaded and Stoke Road, Poringland/Poringland Road SHX/Long Lane is being used as a relief road to the B1332. Stoke Road, Poringland/Poringland Road SHX/Long Lane, can not cope with the extra volume of traffic already let alone what this scale of development will add. The GP surgeries are stretched to more than capacity as are water supplies.
Schools are over subscribed.
No more development in this area.

Object

Site Proposals document

Representation ID: 16212

Received: 10/04/2018

Respondent: Ms Sue Butters

Representation Summary:

3. GNLP0197 p1043
This is prime agricultural farm land, the local road network is unsuitable, and as the site is on high ground the visual impact to the landscape would be devastating.

Full text:

I wish to lodge an objection to the following site proposals as referred to in the HELAA document:
1. GNLP0488 p227
This is prime agricultural land, it boarders ancient woodland, and access is poor. neighbouring Poringland and Framlingham Earl are saturated with new development which has had detrimental effects on roads, local schools and GP surgeries are over burdened.
2. GNLP0491 p229
Again this is prime agricultural land, access is very poor and feeds onto the caster lane (as above) which is far too narrow for the longest busy two way traffic. Verges are bear, eroded and damaged. It puts unnecessary pressure on local wildlife, flora and fauna.
3. GNLP0197 p1043
This is prime agricultural farm land, the local road network is unsuitable, and as the site is on high ground the visual impact to the landscape would be devastating.
4. GNLP0202 p1045
Again this is prime agricultural land, as stated in your HELAA document. The local road network is unsuitable and visual impact on the landscape would be detrimental.
5. GNLP0494 p1047
This site has not got suitable access, and it would impact detrimentally on neighbouring wildlife and woodland sites.
6. GNLP0524 p1049
6.56 hectares is a large site and you do not propose how many residential units are proposed: this causes concern.
The local road network is unsuitable, as stated in your HELAA report. I believe this development would have a detrimental impact on the townscape, local services, and heritage and also open space.
7. GNLP1069 p885
for the above reasons

General comments
The HELAA traffic light system does not seem to correlate with weather a site is considered suitable/ appropriate or not.
I would like to see much more development on brownfield sites in Norwich or existing settlements, where these sites exist.
Each new residential unit generally means two more cars and our small lanes and country roads are not designed for heavy two way traffic vehicles use. The detrimental effect of excessive vehicles can be seen all over the county of Norfolk. Even the county busses are too large for the roads they travel on.

Attachments:

Object

Site Proposals document

Representation ID: 19694

Received: 15/11/2018

Respondent: Phil and Jenny Beaumont

Representation Summary:

The developments that have started have brought about a massive change in road traffic this directly affects me and my family on the Norwich Road at Stoke Holy Cross. The noise from traffic has increases tenfold. In the mornings and evenings at peak times it is difficult to get out of the drive of my home.

The Tas Valley is a beautiful area and should be preserved.

Full text:

I would like to register my objection to any new building developments in the area.
I appreciate some have already been started, partially completed and infringed on a beautiful village
I would like to object against new building in Stoke Holy Cross. GNLP0197,GNLP2091 ,GNLP0524,GNLP0202.

The developments that have started have brought about a massive change in road traffic this directly affects me and my family on the Norwich Road at Stoke Holy Cross. The noise from traffic has increases tenfold. In the mornings and evenings at peak times it is difficult to get out of the drive of my home.

The Tas Valley is a beautiful area and should be preserved.

Object

Site Proposals document

Representation ID: 19787

Received: 14/12/2018

Respondent: Mr Alan Harvey

Representation Summary:

These sites have been put forward by opportunistic land owners, agents and developers who see a chance to make a killing involving huge amounts of money at the expense of the village and surrounding countryside. These sites are outside the village boundaries and involve building on greenfield sites regardless of the infrastructure, water resources and roads to support them! Also if these sites are accepted will create a precedent and will lead to the march of development, field by adjoining field along the Long Lane road to join up with Upper Stoke Village! This would also again involve a huge loss of prime agricultural land, overcrowd the whole area and result in a massive housing sprawl!

Full text:

GNLP0524

The vast majority of the Lower Stoke residents objected to this site which is situated on either side of the Long Lane road. This is because it involves the expansion of the village boundaries into greenfield areas, most of which is good arable agricultural land. Also the infrastructure cannot support this, having already had large developments over the last 30 years!

Anglian Water Stated many years ago that the water and sewage resources were at maximum limits. The roads are only minor 'C' narrow roads and the traffic using them has increased by factors of 3 or 4 times over the last few years.

The residents stated at the time that this development would lead to further sites being put forward towards Upper Stoke along the Long Lane road and this is now happening!


GNLP0197 & GNLP0202

These sites have been put forward by opportunistic land owners, agents and developers who see a chance to make a killing involving huge amounts of money at the expense of the village and surrounding countryside. These sites are outside the village boundaries and involve building on greenfield sites regardless of the infrastructure, water resources and roads to support them! Also if these sites are accepted will create a precedent and will lead to the march of development, field by adjoining field along the Long Lane road to join up with Upper Stoke Village! This would also again involve a huge loss of prime agricultural land, overcrowd the whole area and result in a massive housing sprawl!


GNLP2091, GNLP2111 & GNLP2124

These sites are situated in countryside overlooking the Tas Valley and would be an environmental catastrophe to allow any development in these sites. They are again in greenfield areas and outside the settlement boundaries. The GNLP2091 site, which is in the Tas Valley, is owned by an absentee landowner who has no interest in the village and is trying to maximise his dormant investment from his home in Scandinavia via La Ronde Wright, Development & Planning Agents in Norwich.



In conclusion, the sites submitted during REG 18 and call for sites in 2016 have resulted from the statement made by the GNLP that 36,000 homes are required to satisfy the local needs by 2026! Nobody knows how the GNLP has arrived at these figures or how they have been calculated, it seems to be an arbitrary figure snatched out of thin air! This has resulted in a huge amount of speculative building site applications arriving at local district councils planning departments. The ridiculous ruling by the government that local planning departments of the district councils must have a 5 year bank of approved sites has caused mayhem in our village communities. The building developers have taken full advantage of the situation and especially here in Stoke Holy Cross! Our local Parish magazine is called 'Free For All' and that is what is happening by a huge land grab of potential building sites in the middle of the countryside!

The sites submitted during REG 18 and call for sites in 2016 also are all outside the current settlement boundaries and will result in a massive expansion of the village, which has endured constant development over the past few years. Also the arable land lost questions the future of producing food for the next generations of this country.

I have to question further the remit of the Greater Norwich Local Plan department, how it is made up, how decisions are made and who benefits from the outcomes and results. As I see it the Land Owners get a huge cash windfall, Christmas has definitely come early for them together with the land agents and developers. The councils involved in the GNLP, Norfolk County Council and the utilities derive a fantastic stream of income in council taxes and charges per property built!

The sad state of affairs is that until the Planning Laws are reformed the applicants (developers) will have all the advantages against the objectors. The developers have the resources in lawyers, finances and staff in mounting constant appeals on planning refusals until they get their way. The objectors should at least have the same rights of appeal against planning decisions, similar to the applicants, without the huge costs of a judicial review.

The GNLP states there is a local need for all these thousands of homes to be built but most of these properties are being purchased by investors, second home owners and retirees from outside the county. Our local young couples are priced out of the market with prices starting over £300,000 and very few can afford to buy them.

There should be an independent lawful body or organisation looking out for the interests of the villages, residents, farming resources and the countryside involved in decisions taken by the GNLP! Instead we have a situation where any field or piece of land in the countryside can have a development planning application put on it because of the relaxing of the planning laws by the government! This happens even if the land has a special interest or order on it, look what has happened in the Tud Valley in Costessey. This is now happening in the Tas Valley where it is being attacked on all sides by planning applications!

We are now concreting over valued food producing arable land in an area supposed to be the bread basket of the UK.