Site Proposals document

Search representations

Results for Bergh Apton Parish Council search

New search New search

Object

Site Proposals document

GNLP0122

Representation ID: 13958

Received: 14/03/2018

Respondent: Bergh Apton Parish Council

Representation Summary:

* Site rejected under Joint Core Strategy - in interim on site itself or road that serves it, nothing has occurred to improve it's status as a suitable development site.
* Site forms part of centuries old parkland and originally within curtilage of Washingford Barn - listed building
* No extended development boundary to north of Cookes Road from BER 1. No permission ever given for modern housing development to north side of Cookes Road.
* Cookes Road - single track no passing places, development would exacerbate traffic issues
* No mains drains
* Greenfield site

Object

Site Proposals document

GNLP0203

Representation ID: 13959

Received: 14/03/2018

Respondent: Bergh Apton Parish Council

Representation Summary:

* The site is close to the centre of the village and near the village sign, being adjacent to local authority housing.
* It is a greenfield site
* Mains drainage is available.
* The site was proposed under the Joint Core Strategy, but was not selected. In the interim, on the site itself, or the road that serves it, nothing has occurred to improve its status as a site suitable for development.

Object

Site Proposals document

GNLP0210

Representation ID: 13960

Received: 14/03/2018

Respondent: Bergh Apton Parish Council

Representation Summary:

* The site is adjacent to a listed church and any development would detract from this historical property.
* The site adjoins a County Wildlife site and protected species are identified in the vicinity.
* Development would detrimentally affect established woodland.
* The local road network is considered unsuitable. The site is situated on a hazardous stretch of road, compounded by being on the route for the Household Waste Recycling Centre and a building yard which when in operation produce significant levels of vehicular movement and large lorries, particularly during long weekend opening hours of the HWRC.
* It is a greenfield site

Support

Site Proposals document

GNLP0412

Representation ID: 13961

Received: 14/03/2018

Respondent: Bergh Apton Parish Council

Representation Summary:

* This is the Parish Council's only favoured site for residential development in the village.
* The highway is considered adequate at this location and benefits from passing places.
* Mains drainage is available.
* As a brownfield site re-development would better utilise this location and vastly improve the aesthetics of the area.
* Given the size of the site the scope for a range of dwelling types and tenures would be beneficial to the village

Object

Site Proposals document

GNLP0533

Representation ID: 13962

Received: 14/03/2018

Respondent: Bergh Apton Parish Council

Representation Summary:

* Development of this site would lead to continuous development on the east side of The Street and remove the only remaining hedging. The Parish Council considers that this would spoil the street scene.
* No mains drainage available
* The highway adjacent is narrow and evidence suggests there are already parking and speeding issues that any further development would exacerbate.
* This is a greenfield site.

For instructions on how to use the system and make comments, please see our help guide.