Object

Site Proposals document

Representation ID: 12813

Received: 13/01/2018

Respondent: katrina wood

Representation Summary:

education infrastructure already stretched to its limits aswell as the ability to provide a decent level of healthcare in the area.

Full text:

based on the area of the land I am presuming this is going to be a large development of housing. The local school is not of a sufficient size for the existing children it has let alone it having to cope with more. The children already have to eat their lunch in 15 minute staggered sittings 2/3 year groups at a time because the hall is simply not big enough. Not only will the education infrastructure struggle to cope but the doctors surgery is struggling to cope with demand too. I recently had to wait 4 weeks for an appointment to see the gp - I obviously need to have a crystal ball and know 4 weeks ahead when me or my family are going to need medical intervention. This proposal is absolutely ridiculous!