Object
Site Proposals document
Representation ID: 12885
Received: 01/02/2018
Respondent: Mr Edward Daniels
Representation Summary:
For this site to be built on the resulting traffic would need to flow through The Pastures and the roads are not wide enough for the present traffic, whilst the narrowness of the roads slows down the traffic it is only a matter of time before accidents occur, to increase the traffic to three times the amount is asking for trouble.
Full text:
For this site to be built on the resulting traffic would need to flow through The Pastures and the roads are not wide enough for the present traffic, whilst the narrowness of the roads slows down the traffic it is only a matter of time before accidents occur, to increase the traffic to three times the amount is asking for trouble.