Object

Site Proposals document

Representation ID: 13526

Received: 05/03/2018

Respondent: Brundall Parish Council

Representation Summary:

Brundall can't accommodate any further development up to 2036 based on existing dwellings and permissions already granted. We already have had 150 (The Pastures) and 44 (Mallards) and 6 infill houses built during the current Local Plan which stated only 50 houses and the village has recently had approval for a further 155 houses (Brooms site). I.e. 355+ plus a pending application for 170 houses. We believe this is proportionate with what is the overall requirement within the GNLP.

Full text:

Brundall can't accommodate any further development up to 2036 based on existing dwellings and permissions already granted. We already have had 150 (The Pastures) and 44 (Mallards) and 6 infill houses built during the current Local Plan which stated only 50 houses and the village has recently had approval for a further 155 houses (Brooms site). I.e. 355+ plus a pending application for 170 houses. We believe this is proportionate with what is the overall requirement within the GNLP.