Comment

Draft Local Plan-Part 2 Site Allocations

Representation ID: 19823

Received: 03/02/2020

Respondent: Mrs Suzanne Jones

Representation Summary:

The development of the Utilities site is still designated, in part, for energy generation. The collapse of the proposed Generation Park project on this site demonstrates the dangers of infrastructure projects of this size, based on unproven technologies and wholly dependent on government subsidies that can be withdrawn at any time. Norwich almost ended up with an outdated, polluting and uneconomic white elephant on its eastern fringe. Any future energy producing developments should be of a manageable scale, using proven technology and be truly green, i.e. not adding further emissions to Norwich's already sub-standard air quality.

Full text:

The development of the Utilities site is still designated, in part, for energy generation. The collapse of the proposed Generation Park project on this site demonstrates the dangers of infrastructure projects of this size, based on unproven technologies and wholly dependent on government subsidies that can be withdrawn at any time. Norwich almost ended up with an outdated, polluting and uneconomic white elephant on its eastern fringe. Any future energy producing developments should be of a manageable scale, using proven technology and be truly green, i.e. not adding further emissions to Norwich's already sub-standard air quality.