Object

Publication

Representation ID: 24202

Received: 22/03/2021

Respondent: Barratt David Wilson Homes

Number of people: 2

Agent: Savills

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Please see attached letter

In summary: The Pre-Submission Plan, in failing to identify a ‘housing requirement’ figure other than the minimum Standard Method Local Housing Need figure, fails to take into account evidence of higher levels of housing needs, or to plan for a level of housing need that reflects other parts of plan, specifically drivers for economic growth, and is thus contrary to the PPG. As such, the Plan has not been positively prepared, is not justified, will not be effective, and is not consistent with national policy.

Change suggested by respondent:

Please see attached letter

In summary: The Pre-Submission Plan should identify a 'housing requirement' figure that takes into account evidence of higher levels of housing needs, and plans for a level of housing need that reflects other parts of the Plan, specifically drivers for economic growth.

Full text:

These representations comprise the following:

• Letter dated 22 March 2021 (Savills) (which includes the full representations on all 10 points and should thus be seen as accompanying / attached to all 10 representations)

The following enclosures to this letter (these are being sent by emails 2 and 3 of 3):

o Vision Document (Savills), March 2020
o Highway Capacity Assessment and Public Transport Provision Review for Phase 3 Development (Richard Jackson), 6 December 2018
o Education Report: Land at North Horsford (Phase 3) (EFM), December 2018
o Utilities and Drainage Review (BDW), 29 November 2018
o Ecological Report (TMA), December 2018
o Cultural Heritage Desk-Based Assessment (RPS), March 2020
o Landscape and Visual Appraisal (CSA), February 2020