Object

Site Proposals document

Representation ID: 12951

Received: 08/02/2018

Respondent: mr keith cowley

Representation Summary:

Any development on this site would be outside the existing habitation boundary of the village and would therefore extend the village into open countryside which is unacceptable. Any large scale provision for start homes would by default put additional pressure on the primary school and public transport facilities. Current power and broadband facilities in the village are poor and would be exacerbated by any such development to the detriment of the existing households. Additional traffic caused by such development through the village for accessing the A140 would be detrimental and therefore unacceptable.

Full text:

Any development on this site would be outside the existing habitation boundary of the village and would therefore extend the village into open countryside which is unacceptable. Any large scale provision for start homes would by default put additional pressure on the primary school and public transport facilities. Current power and broadband facilities in the village are poor and would be exacerbated by any such development to the detriment of the existing households. Additional traffic caused by such development through the village for accessing the A140 would be detrimental and therefore unacceptable.