Object

Site Proposals document

Representation ID: 13684

Received: 08/03/2018

Respondent: Mrs Sharon Black

Representation Summary:

Access: the site is between two sharp bends and two minor junctions. It is difficult to see how access could be safe whilst building or for residents.
Flooding: this site is a natural soakaway for the fields, despite this it regularly overflows flooding the main access into the village in more than one place.
Infrastructure: main drainage and broadband are currently poor and need addressing to accommodate current and committed housing.

Full text:

Access: the site is between two sharp bends and two minor junctions. It is difficult to see how access could be safe whilst building or for residents.
Flooding: this site is a natural soakaway for the fields, despite this it regularly overflows flooding the main access into the village in more than one place.
Infrastructure: main drainage and broadband are currently poor and need addressing to accommodate current and committed housing.