Object

Site Proposals document

Representation ID: 14163

Received: 16/03/2018

Respondent: Mrs Donna Maddox

Representation Summary:

There is already a development of 24 dwellings being built (BARN 1).The site is land locked with no other route out than via Barn 1 - bringing further traffic onto an extremely narrow and over used road, that has high banks with reduced visibility and a slight bend. This part of Bell Road was recently completely blocked with snow drifts.
To add further houses on this scale will negatively impact on local amenities: roads, public transport (limited service), school (over subscribed). There is already a power issue in the village with frequent power cuts and additional houses.

Full text:

There is already a development of 24 dwellings being built (BARN 1).The site is land locked with no other route out than via Barn 1 - bringing further traffic onto an extremely narrow and over used road, that has high banks with reduced visibility and a slight bend. This part of Bell Road was recently completely blocked with snow drifts.
To add further houses on this scale will negatively impact on local amenities: roads, public transport (limited service), school (over subscribed). There is already a power issue in the village with frequent power cuts and additional houses.