Object

Site Proposals document

Representation ID: 15470

Received: 21/03/2018

Respondent: Mrs Lyn Marsh

Representation Summary:

The surrounding area infrastructure cannot handle additional housing development. Roads would need upgrading, footpaths and cycle paths installed to enable safe and sustainable access to local schools, drainage and water supply would need upgrading due to frequent leaks and flooding in the area and a full assessment of travel access to the A140 (via Mill Road and Markshall Lane) and Norwich is needed before this site allocation is agreed. The impact of further allocation of sites in Poringland will be severely felt in this area and must be taken into account when considering this site allocataion.

Full text:

The surrounding area infrastructure cannot handle additional housing development. Roads would need upgrading, footpaths and cycle paths installed to enable safe and sustainable access to local schools, drainage and water supply would need upgrading due to frequent leaks and flooding in the area and a full assessment of travel access to the A140 (via Mill Road and Markshall Lane) and Norwich is needed before this site allocation is agreed. The impact of further allocation of sites in Poringland will be severely felt in this area and must be taken into account when considering this site allocataion.