Object
New, Revised and Small Sites
Representation ID: 17012
Received: 11/11/2018
Respondent: Mr John Sellors
We wish to register our objection, based on multiple issues. There is a high risk of river flooding, in addition to potential risk of ground water flooding on the farmland. Any development here would adversely affect highway safety, as the local roads accept single file traffic, especially at the nearest exit to the village (over the bridge). There is no gas, sewerage infrastructure is limited, no street lights and regular powercuts. Loss of wildlife natural habitat, residential and public view, and detrimental impact on the visual appearance of the village, with increased noise and loss of privacy are all concerns.
We wish to register our objection, based on multiple issues. There is a high risk of river flooding, in addition to potential risk of ground water flooding on the farmland. Any development here would adversely affect highway safety, as the local roads accept single file traffic, especially at the nearest exit to the village (over the bridge). There is no gas, sewerage infrastructure is limited, no street lights and regular powercuts. Loss of wildlife natural habitat, residential and public view, and detrimental impact on the visual appearance of the village, with increased noise and loss of privacy are all concerns.