Comment

New, Revised and Small Sites

Representation ID: 17315

Received: 30/10/2018

Respondent: Mr Philip Clarke

Representation Summary:

GNLP2070. Another piece of land without access to anywhere without road transport; footpaths, where? No Village amenities. Anglian Water always seem to have trouble in the Bramerton area. So do adequate infrastructure facilities exist. School access.

With all this supposed extra housing, what is the capacity of the school, not just the Primary School in Rockalnd St Mary, but whether with all the catchment area of secondary education Framingham, is that then overstretched?

Finally, If there is to be substantial development at any of the above locations, the road system from our outlying villages should be considered for an upgrade.

At present the roadway is narrow enough to be problematic with school buses and commercial vehicles at some pinch points (approach to Bramerton, is just one place). There is no footpath, and GNLP2070 definitely would deserve that sort of access.

Full text:

I have visited your web-site, and having registered it seems difficult to ascertain a way to make an online comment. I have previously written about the initial two areas proposed, and this now encompasses the additional sites that have been submitted.

Therefore I want this to be considered as a response to the GNLP consultation; Re GNLP0165, GNLP0531, GNLP2063, GNLP2064,GNLP2061, GNLP2007, & GNLP2070

One is not surprised that there is demand and reasonable expectation for additional housing provision in this area, but there are concerns about the placement, and what might be developed. The style of housing may determine if these new development meet the real demand and aspiration of new property owners in the area.

At present as an outline there is presumably no guide view on the types, quality and affordability of the housing proposals.

Does the village infrastructure cope with a 50% + population increase; water supply, drains, power& telecommunications. Road widths and fotpaths for safe pedestrian movement? Bus services hardly operate to satisfy communting needs.

Regarding the suitability of the sites put forward for this consulatation;

A) GNLP0165. This is a small area of uneven topography, and the existing road system may become more dangerous depending on the placement of any estate access.
The roadway is heavily curved, already liable to flooding and depending on the point of access decided upon may require more footpath access to provide safe pedestrian travel to village amenities.
Buses already run wide round this corner, and an access road may have limited view of traffic proceeding along the road. It is outside the current 30mph limit.
Given the limited area, what can be economically developed? Consider this an objection with present knowledge.

B) GNLP0531. At the Eastern end of the village, I have less knowledge but does this area lie in a "floodplain"? It certainly seems at a lower level, and close to the staithe.
It is quite some distance from the Surgery and Post Office/store, so is the footpath provision adequate for increased traffic and the fact the roadway is narrow for buses and agricultural tractors.
One is always concerned about the style of development and housing provision. Thinking of the other recent development proposal in RSM, the estate road seemed inadequate and partly "unadopted".

C) GNLP2063, 2064, 2061, 2007. These small developments closer to the village centre surely should be considered together. Will the roadways accessing these be adopted, concerns as to the property types likely to be developed, and the impact of increased housing upon servicves. "Unadopted" roads lead to hidden housing costs in leasehold arrangements, and I believe properties shoud be available "freehold" and without future charging options open to developers.

D) GNLP2070. Another piece of land without access to anywhere without road transport; footpaths, where? No Village amenities. Anglian Water always seem to have trouble in the Bramerton area. So do adequate infrastructure facilities exist. School access.

With all this supposed extra housing, what is the capacity of the school, not just the Primary School in Rockalnd St Mary, but whether with all the catchment area of secondary education Framingham, is that then overstretched?

Finally, If there is to be substantial development at any of the above locations, the road system from our outlying villages should be considered for an upgrade.

At present the roadway is narrow enough to be problematic with school buses and commercial vehicles at some pinch points (approach to Bramerton, is just one place). There is no footpath, and GNLP2070 definitely would deserve that sort of access.

As more people find the main Loddon road busier, there is already increased road traffic along our alternative road.

Consider this a comment, but with considerable scepticism, as to Norwich & Norfolk's planning capability to use this area effectively and without detriment to existing people.

Overall /Whole GNLP Plans. Surely housing alone is insufficient; the better way to ensure viability of this region is also to plan for new business parks, and employment areas. Most of Norfolk's road structure is grid-locked daily, and unsafe junctions abound on many radial roads. The infrastructure requirements need to be determined too.