Object

New, Revised and Small Sites

Representation ID: 17885

Received: 06/12/2018

Respondent: mr martin bennett

Representation Summary:

environmental impact
visual impact
increased pollution
24 hours site operation
increased traffic congestion on the A140
destruction of the area

Full text:

this proposal is wholly inappropriate having no consideration for its impact on the existing village. there being no infrastructure to support such development. There will be a significant detrementel impact on the local environment with increased pollution from traffic using the site and continuous use of the works for the ongoing support of large agricultural vehicles. Access to this site is non existent without major development of yet another junction to the already overused A140. o consider this site for such development shows a complete disregard for existing traffic use of the A140 in this area with delays to traffic being experienced daily it only requiring a small delay in traffic flow to cause a major traffic problem through this area. To allow this proposal is to allow for the destruction of the village structure as it exists today and to increase noise and pollution to unacceptable levels. A development such as this proposal would and should be better suited to be located alongside the NDR which has ample space to cope with such a development and which has strong road connections with roads suitable to large heavy vehicles.