Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Representation ID: 21342
Received: 16/03/2020
Respondent: Reedham Parish Council
Representation Summary:
Why is a 9% surfeit of sites needed? If windfall predictions were included in the calculations there would not need to be any surfeit at all.
And why has phasing of the housing growth not been put forward as an option?
Full text:
Why is a 9% surfeit of sites needed? If windfall predictions were included in the calculations there would not need to be any surfeit at all.
And why has phasing of the housing growth not been put forward as an option?