Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 21354

Received: 16/03/2020

Respondent: Reedham Parish Council

Representation Summary:

Why has there been a change in direction and policy towards the location of new housing development in the GNLP from the JCS? The NDR was constructed in order to cater for the new houses to be built on the northern fringes of Norwich so it does not make sense to now propose housing development away from this area.
Sites allocated in the JCS should be built out before any new sites allowed to be developed.
Why has phasing of all development not been included.
Increasing land available for development does not mean more houses will be built.

Full text:

Why has there been a change in direction and policy towards the location of new housing development in the GNLP from the JCS? The NDR was constructed in order to cater for the new houses to be built on the northern fringes of Norwich so it does not make sense to now propose housing development away from this area.
Sites allocated in the JCS should be built out before any new sites allowed to be developed.
Why has phasing of all development not been included.
Increasing land available for development does not mean more houses will be built.