Representation Summary:

[On behalf of Scott Properties Ltd]
17. Further to the above, the Delivery Statement states that it will continue to work to coordinate delivery with providers including Highways England and Anglian Water to ensure infrastructure will be delivered. The below approach outlined within the statement is also supported by my client.
- On-site and off-site provision required of development through conditions or legal agreements;
- Pooled use of CIL;
- Maximising opportunities to access Government and other sources of funding;
- Capital investment of public bodies and utilities companies; and
- Locally led delivery vehicles.

Full text:

Please find attached the following documentation forming a consultation representation for the Greater Norwich Local Plan: Stage C Regulation 18 Draft Strategy and Site Allocations on behalf of my colleague, Adam Davies.

- Completed document for the following documents and questions:
- Draft Greater Norwich Local Plan – Part 1 The Strategy
- Question 6
- Question 9
- Question 11
- Question 12
- Question 13
- Question 14
- Question 16
- Question 17
- Question 18
- Question 25
- Question 29
- Question 32
- Question 41
- Question 42
- Question 48
- Draft Local Plan – Part 2 Site Allocations
- Policy GNLP2136
- Greater Norwich Local Plan Interim Viability Study (November 2019)
- Proving Layout
- Parameter Plan
- Pedestrian Access Plan
- Highways Technical Note
- Vehicular Access Proposals
- Barley Close Pedestrian Link
- Utilities Assessment
- Flood Risk Technical Note
- Infiltration Testing
- Preliminary Surface Water Attenuation Calculations
- Bat Scoping and Activity Survey
- Great Crested Newt and Amphibian Survey
- Reptile Survey
- Arboricultural Survey
- Archaeological and Heritage Assessment
- Noise Assessment

Attachments: