GNLP2003

Showing comments and forms 1 to 2 of 2

Comment

New, Revised and Small Sites

Representation ID: 17287

Received: 22/11/2018

Respondent: South Norfolk Council

Representation Summary:

some medium to low probability surface water flood risk in northern part of site.
no foul sewer available

Full text:

some medium to low probability surface water flood risk in northern part of site.
no foul sewer available

Support

New, Revised and Small Sites

Representation ID: 19562

Received: 14/12/2018

Respondent: Bidwells

Representation Summary:

Please find attached a representation to support site GNLP2003 through the Greater Norwich Local Plan Regulation 18 Stage B Consultation.

The site was first submitted as part of the Regulation 18 Stage A consultation. Subsequently, the site received a suitability assessment within the October 2018 HELAA Addendum. To respond to points raised within the HELAA Addendum, a suite of technical reports were prepared to support our representation, comprising the following:
* Access Appraisal, prepared by Orari Transport Planning;
* Preliminary Ecological Assessment, prepared by The Ecology Consultancy: and
* Preliminary Flood Risk Assessment and Surface Water Drainage Strategy, prepared by BLI Consulting.

Our representation, supported by the attached technical information, demonstrates that site GNLP2003 should be allocated for residential redevelopment, comprising up to 30 dwellings.

See attachments

Full text:

Please find attached a representation to support site GNLP2003 through the Greater Norwich Local Plan Regulation 18 Stage B Consultation.

The site was first submitted as part of the Regulation 18 Stage A consultation. Subsequently, the site received a suitability assessment within the October 2018 HELAA Addendum. To respond to points raised within the HELAA Addendum, a suite of technical reports were prepared to support our representation, comprising the following:
* Access Appraisal, prepared by Orari Transport Planning;
* Preliminary Ecological Assessment, prepared by The Ecology Consultancy: and
* Preliminary Flood Risk Assessment and Surface Water Drainage Strategy, prepared by BLI Consulting.

Our representation, supported by the attached technical information, demonstrates that site GNLP2003 should be allocated for residential redevelopment, comprising up to 30 dwellings.

See attachments

Attachments: