Draft Greater Norwich Local Plan – Part 1 The Strategy
Representation ID: 20975
Received: 14/03/2020
Respondent: Mr Andrew Cawdron
The extent of the upgrades to infrastructure required both for this local Plan and the County, with the level of proposed growth is evident in the works required by Power Networks and Anglian Water. As for Health and Schools, it is irresponsible to imagine that the existing health services, (missing large numbers of staff under the conservative process of demoralise, destabilise, privatise) and schools, (missing staff under the conservative process of demoralise, destabilise, privatise) will be able to respond to the "growth" levels predicted. Our hospitals and ambulance services are continually struggling and schools are failing from cost pressures.
The extent of the upgrades to infrastructure required both for this local Plan and the County, with the level of proposed growth is evident in the works required by Power Networks and Anglian Water. As for Health and Schools, it is irresponsible to imagine that the existing health services, (missing large numbers of staff under the conservative process of demoralise, destabilise, privatise) and schools, (missing staff under the conservative process of demoralise, destabilise, privatise) will be able to respond to the "growth" levels predicted. Our hospitals and ambulance services are continually struggling and schools are failing from cost pressures.