Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22289

Received: 16/03/2020

Respondent: Barton Willmore

Representation Summary:

Q38 - 40) Consultation Questions for Policy 7.1 – The Norwich Urban area including the fringe parishes

2.56 The introduction to the draft Sites Allocation Document (SAD) confirms the document identifies the preferred sites for new allocation, the allocations to be carried forward from the current Local Plans, reasonable alternative sites (where appropriate) and unreasonable housing sites. The SAD is split into 50no. Settlement Papers which summarises the settlement characteristics and the existing and/or proposed allocations. 2.57 In the main, these provide a brief summary of existing allocations, and review whether these remain deliverable within the new Plan Period, and the sites submitted through previous call for sites, providing a rationale for why the sites should or should not be allocated.

2.58 One exception to the above are the existing allocations within the Growth Triangle, allocated through the Growth Triangle Area Action Plan (2016), which the Settlement Papers conclude to be carried forward:

High amounts of existing development commitment remains, as the allocations identified in the Growth Triangle Area Action Plan will not be superseded by the new local plan

2.59 No justification for this approach is provided within the Draft Strategy or the SAD.

2.60 As acknowledged in Table 2.1 and 2.2, the JCS has delivered poorly against its housing requirement since the start of the Plan period. A significant failing of the JCS has been the under delivery of allocations within the Growth Triangle. In particular allocations GT6, GT11, GT12, GT13, GT14 and GT16.

2.61 Policy 7.1 (The Norwich Urban Area including fringe parishes) identifies 12,019 dwellings as the ‘existing deliverable commitment’ for The Growth Triangle with 1,415 additional dwellings proposed through the GNLP.

2.62 Of the 12,019 committed dwellings, Appendix B1 (Broadland Sites Forecast) of Annual Monitoring Report 2018 – 19 (AMR, Appendix 4) identifies the Growth Triangle area is expected to deliver 4,485 dwellings between 2019/20 – 2025/26 (i.e. the remainder of the Joint Core Strategy Plan Period).

2.63 The AMR identifies the remaining 7,623 dwellings will be delivered in ‘2026 and beyond’. No updated trajectory is provided within the AMR or as part of the current GNLP consultation to demonstrate when these 7,623 dwellings (circa. 23% of the existing commitments) will be delivered i.e. by 2038 or beyond.
2.64 Table 2.3 below summarises 4no. allocated Growth Triangle sites which account for circa. 6,350 dwellings of the supply to be delivered ‘2026 and beyond’, not account for additional dwellings identified to be delivered in 2024/25 – 2025/26 (for which no evidence is provided).
Table 2.3: Growth Triangle Area Action Plan allocations [see attached document] 2.65 Sites GT12 and GT16 are anticipated to deliver 3,500 and 3,000 dwellings respectively in the Plan period. To date neither have commenced – despite being anticipated to deliver from 2019/2020 and 2016/2017 respectively. In the case of GT12, the latter phases are dependent on Infrastructure Forward Funding. Neither sites have secured detailed permission for any phase. Even if permission was to be granted now, accounting for NLP lead in times, they would not commence before 2021. This is ambitious, and even then would have to deliver housing at a rate of 220 dwellings per annum in the case of GT12, and 227 dwellings per annum in the case of GT16 (as set out in the AMR which anticipates no housing on site until 2024). NLP 2016, highlights average build out rates of 171 dwellings per annum on greenfield sites of this size, reducing to 148 dwellings per annum for brownfield sites. Based on these averages and the anticipated delivery rates in the 2018/2019 AMR, it would result in a housing shortfall of over 1,200 homes in itself. Accordingly, these allocations should be reduced to 2,927 (GT12) and 2,388 (GT16) respectively. The shortfall must be accounted for elsewhere.

2.66 The GNLP needs to provide a clear evidence-based justification for carrying over allocations identified in the Growth Triangle Area Action Plan. No such evidence is currently provided and as such the Plan risks being found unsound on account of being unjustified, not effective and not positively prepared on this basis. At the very least, we highlight for valid reasons the allocations GT12 and Gt16 cannot deliver the numbers anticipated, which should result in a reduction of 1,200 homes.
2.67 Furthermore, the Growth Strategy seeks to allocate additional land within the Growth Triangle with a proposed allocation for 1,200 dwellings in Sprowston. This site is under the control of the developers of the adjoining GT20 allocation (White House Farm) which is subject to an Outline application for 516 dwellings submitted August 2019 pending determination (application ref. 20191370). The AMR identifies an expectation for GT20 to commence in 2021/22 and complete in 2025, however given Outline consent has not yet been granted (and subsequent Reserved Matters prepared and submitted), this may be optimistic. The proposed allocation in Sprowston is identified to be built out after GT20 has completed. It is therefore unlikely the proposed allocation, for 1,200 dwellings, will be delivered within the Plan period. Policy 7.1 and Policy 1 should be updated to reflect this site is unlikely to deliver its full allocation within the Plan period.

2.68 To ensure the Plan delivers its housing growth requirement over the Plan Period, there is clearly a need to reduce the reliance on the Growth Triangle allocations which have not delivered as anticipated and allocate additional sites which are developable within the Plan Period, including in other locations outside the Growth Triangle. 2.69 Furthermore, Page 94 of the GNLP highlights that there is uncertainty over the Unilever/Carrow Works site. The NPPF requires clear evidence of delivery, and as such this allocation should be removed. As detailed in Section 3, Wymondham is such a location to accommodate at least some of this growth.

2.70 Accounting for the above, 1,200 homes as a minimum should be removed from the Growth Triangle, with further justification provided for all homes to be delivered in this location. Based on delivery to date in the Growth Triangle, we also strongly object to the addition of a further 1,415 homes in this location. To continue to rely on housing delivery in the Growth triangle undermines confidence in the GNLP to deliver on its needs. As such a minimum of 2,615 homes should be removed from the Growth triangle and re-allocated. As detailed in Section 3, Wymondham is such a location to accommodate at least some of this growth.

2.71 Within Wymondham, the Promoters have successfully secured consents resulting in circa. 900 dwellings being completed in the past 14 years from unidentified sites. This reflects not only the suitability of Wymondham as an appropriate location (i.e. people want to live there) but also represents a proven and trusted track record for the Promoters in bringing forward suitable sites.