30. Policy 1: The Sustainable Growth Strategy states that the Plan will be reviewed 5 years after its adoption. At paragraph 33, the NPPF states that Local Plans should be “reviewed to assess whether they need updating at least once every five years” and goes on to state that reviews “should be completed no later than five years after the adoption date of that plan”. As such, it is not considered that Policy 1 is consistent with National Policy and this needs to be made more clear, stating that a review will be undertaken within five years of adoption or in the event housing delivery falls, or housing land supply falls below the annual requirement.
31. In respect of the five-year land supply, as outlined at Policy 1 of the Draft Strategy, the Five-year housing land supply will be calculated across the whole of the three districts comprising Greater Norwich. This approach is supported, however, given the political nature of planning decisions it should be monitored to ensure that all three districts continue to deliver in a proportionate manner.

Full text:

Please find attached the following documentation forming a consultation representation for the Greater Norwich Local Plan: Stage C Regulation 18 Draft Strategy and Site Allocations on behalf of my colleague, Adam Davies.

- Completed document for the following documents and questions:
- Draft Greater Norwich Local Plan – Part 1 The Strategy
- Question 6
- Question 9
- Question 11
- Question 12
- Question 13
- Question 14
- Question 16
- Question 17
- Question 18
- Question 25
- Question 29
- Question 32
- Question 41
- Question 42
- Question 48
- Draft Local Plan – Part 2 Site Allocations
- Policy GNLP2136
- Greater Norwich Local Plan Interim Viability Study (November 2019)
- Proving Layout
- Parameter Plan
- Pedestrian Access Plan
- Highways Technical Note
- Vehicular Access Proposals
- Barley Close Pedestrian Link
- Utilities Assessment
- Flood Risk Technical Note
- Infiltration Testing
- Preliminary Surface Water Attenuation Calculations
- Bat Scoping and Activity Survey
- Great Crested Newt and Amphibian Survey
- Reptile Survey
- Arboricultural Survey
- Archaeological and Heritage Assessment
- Noise Assessment

Attachments: