34. Policy 4 – Strategic Infrastructure outlines the key elements to strategic infrastructure improvements that will be undertaken to support timely delivery of growth. The approach for on-site and local infrastructure, services and facilities is as follows:
‘Development proposals will provide on-site services and facilities and support local infrastructure capacity improvements through on-site provision, providing land and developer contributions.’
35. This approach is supported by our client and as shown on the accompanying Masterplan for their site known as Land at Briar Farm, Harleston, this approach is being taken to ensure the site brings forward the required on-site services and facilities required.
36. There is scope within this part of Policy 4 to also address the need to provide community uses on larger schemes that will benefit both future and existing residents.

Full text:

Please find attached the following documentation forming a consultation representation for the Greater Norwich Local Plan: Stage C Regulation 18 Draft Strategy and Site Allocations on behalf of my colleague, Adam Davies.

- Completed document for the following documents and questions:
- Draft Greater Norwich Local Plan – Part 1 The Strategy
- Question 6
- Question 9
- Question 11
- Question 12
- Question 13
- Question 14
- Question 16
- Question 17
- Question 18
- Question 25
- Question 29
- Question 32
- Question 41
- Question 42
- Question 48
- Draft Local Plan – Part 2 Site Allocations
- Policy GNLP2136
- Greater Norwich Local Plan Interim Viability Study (November 2019)
- Proving Layout
- Parameter Plan
- Pedestrian Access Plan
- Highways Technical Note
- Vehicular Access Proposals
- Barley Close Pedestrian Link
- Utilities Assessment
- Flood Risk Technical Note
- Infiltration Testing
- Preliminary Surface Water Attenuation Calculations
- Bat Scoping and Activity Survey
- Great Crested Newt and Amphibian Survey
- Reptile Survey
- Arboricultural Survey
- Archaeological and Heritage Assessment
- Noise Assessment

Attachments: