POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to five-year land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplace-based house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplace-based house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91
1 As confirmed in paragraph 15 of the Housing Delivery Test Measurement Rule Book respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 2019-38 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy.
2 Calculated using the average number of students per household of 2.85 in Norwich and applying this to the 260 student bedspaces which equates to 91 houses; and using the average number of adults per household of 1.85 in Broadland and applying this to the 8 older persons bedspaces which equates to 4 houses; and using the average number of adults per household of 1.72 in Norwich and applying this to be 83 older persons bedspaces which equates to 48 houses.
3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to increase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum.
3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections.
3 = 300 students per annum identified in paragraph 3.21 – 3 students per annum identified in paragraph 3.20.
3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that
4 Including in Aylesbury Vale and Gloucester, Cheltenham and Tewkesbury needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.

Full text:

Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Dereham Road, Reepham. Please find attached the response form, the representations and a Delivery Statement.