New, Revised and Small Sites

Search representations

Results for Bidwells search

New search New search

Comment

New, Revised and Small Sites

GNLP2120

Representation ID: 18886

Received: 07/12/2018

Respondent: Bidwells

Representation Summary:

This site offers an exciting opportunity to redevelop Congregation Hall into a key re-development site for the University, given its central campus location. As demonstrated by this representation, those issues raised by the HELAA assessment can be addressed through the considered design of the site at a detailed planning application stage.

See full text of representation

Comment

New, Revised and Small Sites

GNLP2123

Representation ID: 18887

Received: 07/12/2018

Respondent: Bidwells

Representation Summary:

This site would form a sustainable extension to the Sainsbury Centre. As demonstrated by this representation, those issues raised by the HELAA assessment can be addressed through detailed design of a scheme on this site, as part of any planning application process.

See full text of representation

Support

New, Revised and Small Sites

GNLP2106

Representation ID: 19540

Received: 14/12/2018

Respondent: Bidwells

Representation Summary:

The following documents submitted in support of Site GNLP2106 - Land South of Taverham Road:

*Highways Assessment and Access Proposal Drawing
*Flood Risk/Surface Water Drainage Strategy
*Foul Sewage and Utilities Drainage Strategy
*Strategic Ecological Assessment
*Indicative Site Plan

See attachments for further details

Attachments:

Support

New, Revised and Small Sites

GNLP2003

Representation ID: 19562

Received: 14/12/2018

Respondent: Bidwells

Representation Summary:

Please find attached a representation to support site GNLP2003 through the Greater Norwich Local Plan Regulation 18 Stage B Consultation.

The site was first submitted as part of the Regulation 18 Stage A consultation. Subsequently, the site received a suitability assessment within the October 2018 HELAA Addendum. To respond to points raised within the HELAA Addendum, a suite of technical reports were prepared to support our representation, comprising the following:
* Access Appraisal, prepared by Orari Transport Planning;
* Preliminary Ecological Assessment, prepared by The Ecology Consultancy: and
* Preliminary Flood Risk Assessment and Surface Water Drainage Strategy, prepared by BLI Consulting.

Our representation, supported by the attached technical information, demonstrates that site GNLP2003 should be allocated for residential redevelopment, comprising up to 30 dwellings.

See attachments

Attachments:

Support

New, Revised and Small Sites

GNLP2047

Representation ID: 19566

Received: 14/12/2018

Respondent: Bidwells

Representation Summary:

Please find attached a representation to support site GNLP2047 through the Greater Norwich Local Plan Regulation 18 Stage B Consultation, alongside revised red line plan.

Our representation demonstrates that site GNLP2047 should be allocated for residential redevelopment, comprising up to 5 dwellings.

See attached.

Attachments:

Support

New, Revised and Small Sites

GNLP2124

Representation ID: 19569

Received: 14/12/2018

Respondent: Bidwells

Representation Summary:

The site is suitable, available, achievable and viable, and is deliverable within the first five years of the Greater Norwich Local Plan period. There are no constraints that would prevent the site from coming forward for residential development.

On this basis, the site should be taken forward as an allocation for residential development of 80 dwellings in the emerging Local Plan. Development on the site would meet all three objectives of sustainable development, and would help to distribute housing allocations and delivery across the district.

See full submission for further details.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.