Draft Greater Norwich Local Plan – Part 1 The Strategy
Search representations
Results for Pigeon Investment Management Ltd search
New searchComment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 7: Are there any factors which have not been covered that you believe should have been?
Representation ID: 22321
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
2. VISION AND OBJECTIVES
2.1 The Vision for Greater Norwich identifies that the GNLP will stimulate the creation of a strong, enterprising, productive and broad-based economy including through the provision of smaller scale employment sites within the market towns and villages to provide access to jobs for all. This accords with the economic objective of sustainable development which is to be welcomed. It will require that an appropriate distribution of jobs and homes is achieved through the plan.
2.2 The Vision aims to ensure that people of all ages will have good access to services and facilities including schools, health care, and community facilities which will reduce the need to travel. This accords with the economic, social and environmental objectives of sustainable development which is supported. It will require that housing which supports the needs of all age groups is delivered in locations which have good access to community facilities particularly with good access to sustainable transport connections.
2.3 The Vision seeks to ensure that a range of types, tenures and sizes of homes will have been built to respond to the needs of the area, including those of the older population and those in affordable need. Again, this accords with the social objective of sustainable development and is supported.
2.4 The Vision then indicates that the need to travel will have reduced including through a better alignment of the distribution of homes and facilities, an increase in home working, as well as an increase in the use of sustainable modes of transport. This will require that new housing is provided at locations where there is a shortage of workers and/or that housing is provided in locations with sustainable transport connections to major employment hubs.
2.5 The Vision also identifies that educational and healthcare facilities will have been expanded or new facilities provided which again accords with the social objective of sustainable development and is to be welcomed.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 8: Is there anything that you feel needs further explanation, clarification or reference
Representation ID: 22322
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
2. VISION AND OBJECTIVES
2.1 The Vision for Greater Norwich identifies that the GNLP will stimulate the creation of a strong, enterprising, productive and broad-based economy including through the provision of smaller scale employment sites within the market towns and villages to provide access to jobs for all. This accords with the economic objective of sustainable development which is to be welcomed. It will require that an appropriate distribution of jobs and homes is achieved through the plan.
2.2 The Vision aims to ensure that people of all ages will have good access to services and facilities including schools, health care, and community facilities which will reduce the need to travel. This accords with the economic, social and environmental objectives of sustainable development which is supported. It will require that housing which supports the needs of all age groups is delivered in locations which have good access to community facilities particularly with good access to sustainable transport connections.
2.3 The Vision seeks to ensure that a range of types, tenures and sizes of homes will have been built to respond to the needs of the area, including those of the older population and those in affordable need. Again, this accords with the social objective of sustainable development and is supported.
2.4 The Vision then indicates that the need to travel will have reduced including through a better alignment of the distribution of homes and facilities, an increase in home working, as well as an increase in the use of sustainable modes of transport. This will require that new housing is provided at locations where there is a shortage of workers and/or that housing is provided in locations with sustainable transport connections to major employment hubs.
2.5 The Vision also identifies that educational and healthcare facilities will have been expanded or new facilities provided which again accords with the social objective of sustainable development and is to be welcomed.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 13: Do you agree with the proposed Settlement Hierarchy and the proposed distribution of housing within the hierarchy?
Representation ID: 22325
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
3. POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to fiveyear land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplacebased house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplacebased house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 201938 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy. 3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes 1 only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to increase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum. 3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections. 3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum but this should be significantly greater, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.
Employment Land Requirement
3.35 As set out in the GNLP, there is no quantitative need for additional employment sites across the GNLP area as a whole. Nevertheless, the GNLP allocates an additional 40ha providing a total of 360ha of employment land allocations to meet the underlying demand and provide choice to the market.
3.36 Whilst these allocations will assist the economic growth of the area and represent positive planning, if a significant proportion of these are actually developed and occupied, they will be dependent upon greater numbers of incommuters from outside of the plan area. Accordingly, an appropriate monitoring framework should be put in place to ensure that a sufficient number of homes are provided to accommodate the workforce to avoid the resultantenvironmental harms of a greater dependency on long-distance commuting flows.
3.37 If the monitoring framework indicates that a greater number of jobs have been accommodated than the growth in the resident workforce such that the economy of the area becomes more dependent upon unsustainable long-distance incommuting flows, this should trigger an immediate review of the GNLP alongside a policy response with residential planning applications being considered more favourably until such time as the GNLP review is adopted to address the imbalance.
3.38 Similarly, if an insufficient amount of employment land is actually developed and occupied, this should trigger an immediate review of the GNLP to bring forward additional employment land allocations alongside a policy response to consider employment planning applications more favourably in the interim.
The approach to five-year land supply
3.39 Policy 1 proposes that the five-year land supply will be assessed across the plan area and that enough allocations are provided to demonstrate a five-year land supply at adoption. However, there is no evidence that this is the case as the GNLP is not supported by a housing trajectory contrary to paragraph 73 of the NPPF. Pegasus Group reserve the right to respond on this matter when the necessary evidence is made available.
Spatial Strategy
3.40 The Table at Policy 1 details the distribution of housing supply across the settlement hierarchy, including proposed new allocations as follows;
- Norwich urban area - 30,560 dwellings – approximately 70% of supply
- Main towns – 6,342 dwellings – approximately 14% of supply
- Key Service Centres – 3,417 dwellings – approximately 8% of supply
- Village clusters – 4,024 dwellings – approximately 9% of supply
3.41 Policies 7.1 to 7.5 provide further detail on the distribution of sites and the composition of existing and proposed allocations with regard to their size and brown or green field status. 3.42 We have concerns over the proposed spatial strategy of the emerging GNLP owing to its over reliance on housing delivery in the Norwich urban area and the proposed discrepancy in terms of settlement hierarchy between the quantum of housing allocated to Main Towns, Key Service Centres and Village Clusters.
3.43 While the Norwich urban area is a sustainable location for growth, reliance on this area for the delivery of approximately 70% of the housing growth of the GNLP up to 2038 places a requirement on existing infrastructure to accommodate an additional 30,560 dwellings in the plan period, it also requires an annual delivery rate within the area of 1,698 dwellings per annum over each of the next 18 years. This requires that the level of development in Norwich urban area alone is broadly consistent with that which has been achieved across the entire GNLP plan area since 2008. This does not appear to be realistic. If the necessary boost to housing supply is to be achieved this will require a greater range and choice of sites across all of the sustainable settlements within the plan area.
3.44 Moreover, reference to Policy 7.1 demonstrates that delivery within the Norwich Urban Area is predicated on two substantial brownfield regeneration areas, the Northern City Regeneration Area and the East Norwich Strategic Regeneration Area and several urban extensions of over 1,000 dwellings each.
3.45 Brownfield regeneration is costly and time consuming and often involves the bringing together of multiple delivery partners to achieve. The likelihood of the totality of development proposed through regeneration delivering in the plan period is therefore slim.
3.46 New strategic urban extensions can also be timely to deliver with the need for new strategic infrastructure in terms of highways and drainage to be delivered in advance of new homes.
3.47 The Councils have not produced evidence to substantiate the delivery trajectory of the brownfield regeneration sites or the urban extensions in the Norwich Urban Area. We reserve the right to comment further on this matter at the Regulation 19 consultation stage. Delay in delivery at either source of supply could prejudice the delivery of the housing requirement of the GNLP and therefore go to the soundness of the plan. 3.48 Additional certainty over the delivery of the housing requirement could be achieved by changing the emphasis of the spatial strategy by allocating more housing to the Main Towns and the Key Service Centres, including Hethersett with an associated reduction in the percentage to be delivered in the Norwich urban area and within the Village Clusters.
3.49 Additionally, we have concerns over the fact that more dwellings are proposed in the spatial strategy across Village Clusters than are allocated at Key Service Centres, including a minimum of 1,200 dwellings through a South Norfolk Village Clusters Housing Site Allocations Development Plan Document.
3.50 Without certainty over the supply of land to deliver such a quantum of development in South Norfolk Village Clusters the soundness of the spatial strategy is questionable. As a percentage of the overall new housing allocations in the Reg 18 GNLP the current spatial strategy delegates approximately 15% to a document outside of its control (1200/7,840). This is not considered to be a reasonable approach and prejudices the delivery of the emerging GNLP by 2038.
3.51 A Settlement Hierarchy approach to the distribution of development would look to allocate a higher percentage of housing to more sustainable locations with smaller amounts being allocated to lower order settlements in recognition that small developments at villages can help maintain service provision, provide vitality and help address local market and affordable housing needs.
3.52 The Reg 18 GNLP allocates more development to Village clusters than to Key Service Centres which is a counter intuitive approach to achieving sustainable development. We consider this matter should be addressed by allocating additional sites at Hethersett, with Pigeon being able to provide land for the development of new community facilities, over and above sites for new housing development.
3.53 In failing to provide an increased number of dwellings at Main Towns and Key Service Centres the Councils are also missing the opportunities presented by Pigeon to provide new community facilities that can support existing and proposed new development in sustainable locations for the plan period and beyond. 3.54 The preceding representations on the Spatial Strategy are all set in the context that the identified housing need does not even accord with the minimum set by national policy and does not take account of the needs of specific groups. It is therefore evident that the quantitative elements of the Spatial Strategy will need to be revised to ensure that housing needs can be met across the GNLP area. This should be achieved through directing more growth to the Main Towns and Key Service Centres to counterbalance the disproportionate levels of growth proposed within the Norwich urban area and Village Clusters.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 14: Do you support, object or wish to comment on the approach for housing numbers and delivery?
Representation ID: 22326
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
3. POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to fiveyear land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplacebased house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplacebased house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 201938 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy. 3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes 1 only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to increase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum. 3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections. 3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum but this should be significantly greater, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.
Employment Land Requirement
3.35 As set out in the GNLP, there is no quantitative need for additional employment sites across the GNLP area as a whole. Nevertheless, the GNLP allocates an additional 40ha providing a total of 360ha of employment land allocations to meet the underlying demand and provide choice to the market.
3.36 Whilst these allocations will assist the economic growth of the area and represent positive planning, if a significant proportion of these are actually developed and occupied, they will be dependent upon greater numbers of incommuters from outside of the plan area. Accordingly, an appropriate monitoring framework should be put in place to ensure that a sufficient number of homes are provided to accommodate the workforce to avoid the resultantenvironmental harms of a greater dependency on long-distance commuting flows.
3.37 If the monitoring framework indicates that a greater number of jobs have been accommodated than the growth in the resident workforce such that the economy of the area becomes more dependent upon unsustainable long-distance incommuting flows, this should trigger an immediate review of the GNLP alongside a policy response with residential planning applications being considered more favourably until such time as the GNLP review is adopted to address the imbalance.
3.38 Similarly, if an insufficient amount of employment land is actually developed and occupied, this should trigger an immediate review of the GNLP to bring forward additional employment land allocations alongside a policy response to consider employment planning applications more favourably in the interim.
The approach to five-year land supply
3.39 Policy 1 proposes that the five-year land supply will be assessed across the plan area and that enough allocations are provided to demonstrate a five-year land supply at adoption. However, there is no evidence that this is the case as the GNLP is not supported by a housing trajectory contrary to paragraph 73 of the NPPF. Pegasus Group reserve the right to respond on this matter when the necessary evidence is made available.
Spatial Strategy
3.40 The Table at Policy 1 details the distribution of housing supply across the settlement hierarchy, including proposed new allocations as follows;
- Norwich urban area - 30,560 dwellings – approximately 70% of supply
- Main towns – 6,342 dwellings – approximately 14% of supply
- Key Service Centres – 3,417 dwellings – approximately 8% of supply
- Village clusters – 4,024 dwellings – approximately 9% of supply
3.41 Policies 7.1 to 7.5 provide further detail on the distribution of sites and the composition of existing and proposed allocations with regard to their size and brown or green field status. 3.42 We have concerns over the proposed spatial strategy of the emerging GNLP owing to its over reliance on housing delivery in the Norwich urban area and the proposed discrepancy in terms of settlement hierarchy between the quantum of housing allocated to Main Towns, Key Service Centres and Village Clusters.
3.43 While the Norwich urban area is a sustainable location for growth, reliance on this area for the delivery of approximately 70% of the housing growth of the GNLP up to 2038 places a requirement on existing infrastructure to accommodate an additional 30,560 dwellings in the plan period, it also requires an annual delivery rate within the area of 1,698 dwellings per annum over each of the next 18 years. This requires that the level of development in Norwich urban area alone is broadly consistent with that which has been achieved across the entire GNLP plan area since 2008. This does not appear to be realistic. If the necessary boost to housing supply is to be achieved this will require a greater range and choice of sites across all of the sustainable settlements within the plan area.
3.44 Moreover, reference to Policy 7.1 demonstrates that delivery within the Norwich Urban Area is predicated on two substantial brownfield regeneration areas, the Northern City Regeneration Area and the East Norwich Strategic Regeneration Area and several urban extensions of over 1,000 dwellings each.
3.45 Brownfield regeneration is costly and time consuming and often involves the bringing together of multiple delivery partners to achieve. The likelihood of the totality of development proposed through regeneration delivering in the plan period is therefore slim.
3.46 New strategic urban extensions can also be timely to deliver with the need for new strategic infrastructure in terms of highways and drainage to be delivered in advance of new homes.
3.47 The Councils have not produced evidence to substantiate the delivery trajectory of the brownfield regeneration sites or the urban extensions in the Norwich Urban Area. We reserve the right to comment further on this matter at the Regulation 19 consultation stage. Delay in delivery at either source of supply could prejudice the delivery of the housing requirement of the GNLP and therefore go to the soundness of the plan. 3.48 Additional certainty over the delivery of the housing requirement could be achieved by changing the emphasis of the spatial strategy by allocating more housing to the Main Towns and the Key Service Centres, including Hethersett with an associated reduction in the percentage to be delivered in the Norwich urban area and within the Village Clusters.
3.49 Additionally, we have concerns over the fact that more dwellings are proposed in the spatial strategy across Village Clusters than are allocated at Key Service Centres, including a minimum of 1,200 dwellings through a South Norfolk Village Clusters Housing Site Allocations Development Plan Document.
3.50 Without certainty over the supply of land to deliver such a quantum of development in South Norfolk Village Clusters the soundness of the spatial strategy is questionable. As a percentage of the overall new housing allocations in the Reg 18 GNLP the current spatial strategy delegates approximately 15% to a document outside of its control (1200/7,840). This is not considered to be a reasonable approach and prejudices the delivery of the emerging GNLP by 2038.
3.51 A Settlement Hierarchy approach to the distribution of development would look to allocate a higher percentage of housing to more sustainable locations with smaller amounts being allocated to lower order settlements in recognition that small developments at villages can help maintain service provision, provide vitality and help address local market and affordable housing needs.
3.52 The Reg 18 GNLP allocates more development to Village clusters than to Key Service Centres which is a counter intuitive approach to achieving sustainable development. We consider this matter should be addressed by allocating additional sites at Hethersett, with Pigeon being able to provide land for the development of new community facilities, over and above sites for new housing development.
3.53 In failing to provide an increased number of dwellings at Main Towns and Key Service Centres the Councils are also missing the opportunities presented by Pigeon to provide new community facilities that can support existing and proposed new development in sustainable locations for the plan period and beyond. 3.54 The preceding representations on the Spatial Strategy are all set in the context that the identified housing need does not even accord with the minimum set by national policy and does not take account of the needs of specific groups. It is therefore evident that the quantitative elements of the Spatial Strategy will need to be revised to ensure that housing needs can be met across the GNLP area. This should be achieved through directing more growth to the Main Towns and Key Service Centres to counterbalance the disproportionate levels of growth proposed within the Norwich urban area and Village Clusters.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 15: Do you support, object or wish to comment on the approach for the Economy?
Representation ID: 22328
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
3. POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to fiveyear land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplacebased house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplacebased house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 201938 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy. 3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes 1 only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to increase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum. 3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections. 3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum but this should be significantly greater, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.
Employment Land Requirement
3.35 As set out in the GNLP, there is no quantitative need for additional employment sites across the GNLP area as a whole. Nevertheless, the GNLP allocates an additional 40ha providing a total of 360ha of employment land allocations to meet the underlying demand and provide choice to the market.
3.36 Whilst these allocations will assist the economic growth of the area and represent positive planning, if a significant proportion of these are actually developed and occupied, they will be dependent upon greater numbers of incommuters from outside of the plan area. Accordingly, an appropriate monitoring framework should be put in place to ensure that a sufficient number of homes are provided to accommodate the workforce to avoid the resultantenvironmental harms of a greater dependency on long-distance commuting flows.
3.37 If the monitoring framework indicates that a greater number of jobs have been accommodated than the growth in the resident workforce such that the economy of the area becomes more dependent upon unsustainable long-distance incommuting flows, this should trigger an immediate review of the GNLP alongside a policy response with residential planning applications being considered more favourably until such time as the GNLP review is adopted to address the imbalance.
3.38 Similarly, if an insufficient amount of employment land is actually developed and occupied, this should trigger an immediate review of the GNLP to bring forward additional employment land allocations alongside a policy response to consider employment planning applications more favourably in the interim.
The approach to five-year land supply
3.39 Policy 1 proposes that the five-year land supply will be assessed across the plan area and that enough allocations are provided to demonstrate a five-year land supply at adoption. However, there is no evidence that this is the case as the GNLP is not supported by a housing trajectory contrary to paragraph 73 of the NPPF. Pegasus Group reserve the right to respond on this matter when the necessary evidence is made available.
Spatial Strategy
3.40 The Table at Policy 1 details the distribution of housing supply across the settlement hierarchy, including proposed new allocations as follows;
- Norwich urban area - 30,560 dwellings – approximately 70% of supply
- Main towns – 6,342 dwellings – approximately 14% of supply
- Key Service Centres – 3,417 dwellings – approximately 8% of supply
- Village clusters – 4,024 dwellings – approximately 9% of supply
3.41 Policies 7.1 to 7.5 provide further detail on the distribution of sites and the composition of existing and proposed allocations with regard to their size and brown or green field status. 3.42 We have concerns over the proposed spatial strategy of the emerging GNLP owing to its over reliance on housing delivery in the Norwich urban area and the proposed discrepancy in terms of settlement hierarchy between the quantum of housing allocated to Main Towns, Key Service Centres and Village Clusters.
3.43 While the Norwich urban area is a sustainable location for growth, reliance on this area for the delivery of approximately 70% of the housing growth of the GNLP up to 2038 places a requirement on existing infrastructure to accommodate an additional 30,560 dwellings in the plan period, it also requires an annual delivery rate within the area of 1,698 dwellings per annum over each of the next 18 years. This requires that the level of development in Norwich urban area alone is broadly consistent with that which has been achieved across the entire GNLP plan area since 2008. This does not appear to be realistic. If the necessary boost to housing supply is to be achieved this will require a greater range and choice of sites across all of the sustainable settlements within the plan area.
3.44 Moreover, reference to Policy 7.1 demonstrates that delivery within the Norwich Urban Area is predicated on two substantial brownfield regeneration areas, the Northern City Regeneration Area and the East Norwich Strategic Regeneration Area and several urban extensions of over 1,000 dwellings each.
3.45 Brownfield regeneration is costly and time consuming and often involves the bringing together of multiple delivery partners to achieve. The likelihood of the totality of development proposed through regeneration delivering in the plan period is therefore slim.
3.46 New strategic urban extensions can also be timely to deliver with the need for new strategic infrastructure in terms of highways and drainage to be delivered in advance of new homes.
3.47 The Councils have not produced evidence to substantiate the delivery trajectory of the brownfield regeneration sites or the urban extensions in the Norwich Urban Area. We reserve the right to comment further on this matter at the Regulation 19 consultation stage. Delay in delivery at either source of supply could prejudice the delivery of the housing requirement of the GNLP and therefore go to the soundness of the plan. 3.48 Additional certainty over the delivery of the housing requirement could be achieved by changing the emphasis of the spatial strategy by allocating more housing to the Main Towns and the Key Service Centres, including Hethersett with an associated reduction in the percentage to be delivered in the Norwich urban area and within the Village Clusters.
3.49 Additionally, we have concerns over the fact that more dwellings are proposed in the spatial strategy across Village Clusters than are allocated at Key Service Centres, including a minimum of 1,200 dwellings through a South Norfolk Village Clusters Housing Site Allocations Development Plan Document.
3.50 Without certainty over the supply of land to deliver such a quantum of development in South Norfolk Village Clusters the soundness of the spatial strategy is questionable. As a percentage of the overall new housing allocations in the Reg 18 GNLP the current spatial strategy delegates approximately 15% to a document outside of its control (1200/7,840). This is not considered to be a reasonable approach and prejudices the delivery of the emerging GNLP by 2038.
3.51 A Settlement Hierarchy approach to the distribution of development would look to allocate a higher percentage of housing to more sustainable locations with smaller amounts being allocated to lower order settlements in recognition that small developments at villages can help maintain service provision, provide vitality and help address local market and affordable housing needs.
3.52 The Reg 18 GNLP allocates more development to Village clusters than to Key Service Centres which is a counter intuitive approach to achieving sustainable development. We consider this matter should be addressed by allocating additional sites at Hethersett, with Pigeon being able to provide land for the development of new community facilities, over and above sites for new housing development.
3.53 In failing to provide an increased number of dwellings at Main Towns and Key Service Centres the Councils are also missing the opportunities presented by Pigeon to provide new community facilities that can support existing and proposed new development in sustainable locations for the plan period and beyond. 3.54 The preceding representations on the Spatial Strategy are all set in the context that the identified housing need does not even accord with the minimum set by national policy and does not take account of the needs of specific groups. It is therefore evident that the quantitative elements of the Spatial Strategy will need to be revised to ensure that housing needs can be met across the GNLP area. This should be achieved through directing more growth to the Main Towns and Key Service Centres to counterbalance the disproportionate levels of growth proposed within the Norwich urban area and Village Clusters.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 16: Do you support, object or wish to comment on the approach to Review and Five-Year Land Supply?
Representation ID: 22330
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
3. POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to fiveyear land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplacebased house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplacebased house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 201938 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy. 3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes 1 only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to increase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum. 3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections. 3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum but this should be significantly greater, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.
Employment Land Requirement
3.35 As set out in the GNLP, there is no quantitative need for additional employment sites across the GNLP area as a whole. Nevertheless, the GNLP allocates an additional 40ha providing a total of 360ha of employment land allocations to meet the underlying demand and provide choice to the market.
3.36 Whilst these allocations will assist the economic growth of the area and represent positive planning, if a significant proportion of these are actually developed and occupied, they will be dependent upon greater numbers of incommuters from outside of the plan area. Accordingly, an appropriate monitoring framework should be put in place to ensure that a sufficient number of homes are provided to accommodate the workforce to avoid the resultantenvironmental harms of a greater dependency on long-distance commuting flows.
3.37 If the monitoring framework indicates that a greater number of jobs have been accommodated than the growth in the resident workforce such that the economy of the area becomes more dependent upon unsustainable long-distance incommuting flows, this should trigger an immediate review of the GNLP alongside a policy response with residential planning applications being considered more favourably until such time as the GNLP review is adopted to address the imbalance.
3.38 Similarly, if an insufficient amount of employment land is actually developed and occupied, this should trigger an immediate review of the GNLP to bring forward additional employment land allocations alongside a policy response to consider employment planning applications more favourably in the interim.
The approach to five-year land supply
3.39 Policy 1 proposes that the five-year land supply will be assessed across the plan area and that enough allocations are provided to demonstrate a five-year land supply at adoption. However, there is no evidence that this is the case as the GNLP is not supported by a housing trajectory contrary to paragraph 73 of the NPPF. Pegasus Group reserve the right to respond on this matter when the necessary evidence is made available.
Spatial Strategy
3.40 The Table at Policy 1 details the distribution of housing supply across the settlement hierarchy, including proposed new allocations as follows;
- Norwich urban area - 30,560 dwellings – approximately 70% of supply
- Main towns – 6,342 dwellings – approximately 14% of supply
- Key Service Centres – 3,417 dwellings – approximately 8% of supply
- Village clusters – 4,024 dwellings – approximately 9% of supply
3.41 Policies 7.1 to 7.5 provide further detail on the distribution of sites and the composition of existing and proposed allocations with regard to their size and brown or green field status. 3.42 We have concerns over the proposed spatial strategy of the emerging GNLP owing to its over reliance on housing delivery in the Norwich urban area and the proposed discrepancy in terms of settlement hierarchy between the quantum of housing allocated to Main Towns, Key Service Centres and Village Clusters.
3.43 While the Norwich urban area is a sustainable location for growth, reliance on this area for the delivery of approximately 70% of the housing growth of the GNLP up to 2038 places a requirement on existing infrastructure to accommodate an additional 30,560 dwellings in the plan period, it also requires an annual delivery rate within the area of 1,698 dwellings per annum over each of the next 18 years. This requires that the level of development in Norwich urban area alone is broadly consistent with that which has been achieved across the entire GNLP plan area since 2008. This does not appear to be realistic. If the necessary boost to housing supply is to be achieved this will require a greater range and choice of sites across all of the sustainable settlements within the plan area.
3.44 Moreover, reference to Policy 7.1 demonstrates that delivery within the Norwich Urban Area is predicated on two substantial brownfield regeneration areas, the Northern City Regeneration Area and the East Norwich Strategic Regeneration Area and several urban extensions of over 1,000 dwellings each.
3.45 Brownfield regeneration is costly and time consuming and often involves the bringing together of multiple delivery partners to achieve. The likelihood of the totality of development proposed through regeneration delivering in the plan period is therefore slim.
3.46 New strategic urban extensions can also be timely to deliver with the need for new strategic infrastructure in terms of highways and drainage to be delivered in advance of new homes.
3.47 The Councils have not produced evidence to substantiate the delivery trajectory of the brownfield regeneration sites or the urban extensions in the Norwich Urban Area. We reserve the right to comment further on this matter at the Regulation 19 consultation stage. Delay in delivery at either source of supply could prejudice the delivery of the housing requirement of the GNLP and therefore go to the soundness of the plan. 3.48 Additional certainty over the delivery of the housing requirement could be achieved by changing the emphasis of the spatial strategy by allocating more housing to the Main Towns and the Key Service Centres, including Hethersett with an associated reduction in the percentage to be delivered in the Norwich urban area and within the Village Clusters.
3.49 Additionally, we have concerns over the fact that more dwellings are proposed in the spatial strategy across Village Clusters than are allocated at Key Service Centres, including a minimum of 1,200 dwellings through a South Norfolk Village Clusters Housing Site Allocations Development Plan Document.
3.50 Without certainty over the supply of land to deliver such a quantum of development in South Norfolk Village Clusters the soundness of the spatial strategy is questionable. As a percentage of the overall new housing allocations in the Reg 18 GNLP the current spatial strategy delegates approximately 15% to a document outside of its control (1200/7,840). This is not considered to be a reasonable approach and prejudices the delivery of the emerging GNLP by 2038.
3.51 A Settlement Hierarchy approach to the distribution of development would look to allocate a higher percentage of housing to more sustainable locations with smaller amounts being allocated to lower order settlements in recognition that small developments at villages can help maintain service provision, provide vitality and help address local market and affordable housing needs.
3.52 The Reg 18 GNLP allocates more development to Village clusters than to Key Service Centres which is a counter intuitive approach to achieving sustainable development. We consider this matter should be addressed by allocating additional sites at Hethersett, with Pigeon being able to provide land for the development of new community facilities, over and above sites for new housing development.
3.53 In failing to provide an increased number of dwellings at Main Towns and Key Service Centres the Councils are also missing the opportunities presented by Pigeon to provide new community facilities that can support existing and proposed new development in sustainable locations for the plan period and beyond. 3.54 The preceding representations on the Spatial Strategy are all set in the context that the identified housing need does not even accord with the minimum set by national policy and does not take account of the needs of specific groups. It is therefore evident that the quantitative elements of the Spatial Strategy will need to be revised to ensure that housing needs can be met across the GNLP area. This should be achieved through directing more growth to the Main Towns and Key Service Centres to counterbalance the disproportionate levels of growth proposed within the Norwich urban area and Village Clusters.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 17: Do you support, object or wish to comment on the approach to Infrastructure?
Representation ID: 22331
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
3. POLICY 1 – THE SUSTAINABLE GROWTH STRATEGY
3.1 Policy 1 sets out the proposed strategy and includes the proposed housing requirement, the proposed employment land requirement, the approach to fiveyear land supply and the spatial strategy. These are addressed below.
3.2 Policy 1 also sets out the approach to supporting infrastructure and the proposed distribution of development which are addressed in greater detail in Policies 4 and 7.1 to 7.4 respectively. These matters are responded to under those Policies rather than in response to Policy 1.
Housing Requirement
The minimum housing need
3.3 The foreword to the Draft Local Plan identifies a requirement for about 44,500 homes over the next 20-years. This is clarified in Policy 1 which identifies a housing requirement for 44,340 homes in response to a need for 40,550.
3.4 The need for 40,550 homes is identified as having been calculated using the standard method according to Table 6 and the box at the bottom of page 53.
3.5 The standard method provides the minimum local housing need according to the PPG (2a-004) and is calculated using the average household growth for 10 consecutive years, with an affordability uplift based on the median workplacebased house price to earnings ratio of the preceding year1.
3.6 The Draft Local Plan covers the period from 1st April 2018. In order to establish the minimum local housing need for the plan period it is therefore necessary to calculate either the standard method at 2018; or to calculate the current standard method and apply this to the remainder of the plan period in addition to the number of completions which have already occurred.
3.7 In the case of the Greater Norwich Plan Area, the average household growth over the 10 consecutive years from 2018, namely 2018-28, was 400 in Broadland, 510 in Norwich and 704 in South Norfolk. The median workplacebased house price to earnings ratios in 2017 were 9.82, 6.93 and 8.91 respectively. Using these figures, the minimum local housing need over the plan period equates to 41,379 homes.
3.8 Alternatively, the minimum local housing need from 2019 onwards can be calculated using the average household growth over the 10 consecutive years from 2019, namely 2019-29, with the affordability ratios of 2018 applied. The average household growth was 397, 505 and 691 respectively and the median workplace-based house price to earnings ratios were 9.23, 7.03 and 8.78 respectively. These figures produce a minimum local housing need of 2,024 homes per annum which equates to 38,460 homes over the period 2019-38. The number of housing completions in 2018/19 need to be added to this figure to provide the minimum local housing need over the plan period. MHCLG Live Tables identify that there were 2,757 housing completions, as well as 260 student bedspaces and 91 other bedspaces completed in this year. Once the appropriate conversion factors as identified in the PPG (68-034) and the PPG (63-016a) are applied this would equate to 2,901 houses2 completed in 2018/19. In addition to the minimum local housing need of 38,460 over the period 201938 this would produce a minimum local housing need for 41,361 homes over the plan period.
3.9 Once the median house price to earnings ratio for 2019 and the number of housing and bedspace completions in 2019/20 are available, it will be possible to provide yet another calculation of the minimum local housing need based on the completions in the period 2018-20 and the minimum local housing need over the period 2020-38. However, given the consistency of the preceding figures it would be expected that this would again be broadly consistent.
3.10 In either case, it is apparent that the standard method has been miscalculated within the Draft Local Plan as it is below the minimum local housing need of either 41,379 or 41,361. Policy 1 and all other references to a need for 40,550 are therefore not justified nor are they consistent with national policy. 3.11 Furthermore, the Government has identified that it intends to review the standard method by September 2020. As the Local Plan is not intended to be submitted for examination until June 2021, it is likely that the Local Plan will need to respond to the new standard method, whatever that may be.
Exceeding the minimum housing need
3.12 The standard method also only provides the minimum local housing need, and the PPG (2a-010) identifies that this should be exceeded including in situations where there is a growth strategy or where strategic infrastructure improvements may drive an increase in housing need or where previous assessments of need are significantly greater than the standard method. All three of these situations arise in Greater Norwich.
The City Deal
3.13 Paragraph 13 of the Draft Local Plan identifies that the Greater Norwich City Deal requirements will be met through the Draft Local Plan. As the Greater Norwich City Deal forms a growth strategy which has been agreed with Government, the Local Plan is required to meet the requirements of the City Deal as this forms part of national policy as set out in paragraph 6 of the NPPF.
3.14 The City Deal identifies that strategic infrastructure is needed including to deliver a step change in housing delivery. It sets a target for an average of 3,000 homes per annum in the period 2014-19 and for 37,000 homes to be delivered in the period 2008-26.
3.15 MHCLG Live Tables identify that only 10,715 houses were built in the period 2014-19 in addition to the equivalent of 581 homes provided as student and older persons bedspaces. This provides a total of 11,296 or an average of only 2,259 homes per annum. It is therefore apparent that the short-term target of the City Deal has not been met and that accordingly this shortfall of 3,704 homes should be addressed as soon as possible to achieve the objectives of the City Deal. No such short-term uplift to remedy this shortfall is made within the Draft Local Plan contrary to the requirements of national policy in the form of the City Deal.
3.16 In the period 2008-19, the MHCLG Live Tables identify an equivalent of 19,416 housing completions, which means that in order to provide 37,000 homes in the period 2008-26 it will be necessary to deliver the remaining 17,584 in the period 2019-26 or an average of 2,512 per annum. However, the housing need identified in emerging Policy 1 of 40,550 homes 1 only provides for an average need of 2,028 homes per annum. The housing need of the Draft Local Plan therefore again does not provide a sufficient number of homes to meet the housing needs identified in the City Deal.
3.17 It is therefore evident that the Draft Local Plan does not meet any of the targets of the City Deal and that it is accordingly not effective, not justified, not positively prepared and inconsistent with national policy.
Previous assessments of need
3.18 The SHMA for Central Norfolk identifies that there was a need to deliver 44,714 homes from 2015-36 to accord with the City Deal. In the period 2015-18, the equivalent of 6,680 homes were delivered and so there is a residual need for 38,034 homes from 2018-36, or 2,113 per annum.
3.19 Assuming that this need remained constant across the period 2036-38, there would be a need for 42,260 homes to accord with the City Deal based on the latest assessment of housing need. The Local Plan does not therefore provide a sufficient number of homes to meet the latest assessment of need or to accord with the City Deal.
The housing need of students
3.20 The standard method is informed by the 2014-based household projections which assume that the five-year migration trends which were experienced in the period 2009-14 will be maintained. The Higher Education Statistics Authority (HESA) identified that University of East Anglia (UEA) had 16,640 students and the Norwich University of the Arts had 1,485 students in 2009 providing a total of 18,125, but that this had increased to 18,140 by 2014 with 16,265 at UEA and 1,875 at the University of Arts. The 2014-based projections which inform the standard method therefore assumes that the student population will increase by 15 people over five years or 3 per annum.
3.21 Paragraph 45 of the Draft Local Plan however indicates that the Universities in Norwich are expected to expand. In particular, the University of East Anglia (UEA) has announced plans to increase its students from 15,000 to 18,000 in the next decade, an increase of 300 students per annum. 3.22 The increased migration of 297 students per annum3, even assuming that the student population of the University of the Arts remains constant, are not taken into account in the projections.
3.23 These additional students at UEA will clearly have an impact on the housing need in Greater Norwich which is not taken into account within the standard method. Either these will generate a need for an additional 2,970 bedspaces which is equivalent to 1,042 houses or if these students are accommodated in the housing stock it will be necessary to deliver an additional 1,042 homes to accommodate them. It will be necessary to deliver such accommodation to meet the objectively assessed needs and to accord with the Vision of the GNLP.
3.24 Once the needs of these additional students are taken into account this would increase the minimum local housing need from either 41,379 or 41,361 to either 42,421 or 42,403 homes over the plan period. This broadly accords with the 42,260 homes necessary to accord with the City Deal.
The needs of those in institutional accommodation
3.25 The SHMA for Central Norfolk identifies a need for 3,909 people aged 75 or over to be accommodated in residential institutions over the period 2015-36. The 2014 based institutional population projections identify an increase of 2,060 such people within the GNLP area over the period 2015-38 comprising 1,088 in Broadland, 291 in Norwich and 681 in South Norfolk.
3.26 In the period 2015-18, a total of 234 bedspaces in older persons communal establishments were built, including 7 in Broadland, 225 in Norwich and 2 in South Norfolk. This leaves a residual need for 1,826 bedspaces in the period 2018-36, comprising 1,081 in Broadland, 57 in Norwich and 679 in South Norfolk.
3.27 The household projections which inform both the SHMA and the standard method do not include this population and the SHMA correctly recognises that in the absence of 1,826 bedspaces in communal establishments the population who would have occupied these will remain in the dwelling stock rather than releasing them as assumed in the projections. 3.28 It is therefore apparent that there is a need for 1,826 bedspaces in communal establishments in addition to the standard method and that in the absence of such provision the housing requirement will need to increase as fewer dwellings will be released to the market. The number of dwellings that would not be released in the absence of such residential institutions is 987 using the calculation identified in the PPG (63-016a) comprising 584 in Broadland, 33 in Norwich and 369 in South Norfolk.
3.29 It will therefore either be necessary to make provision for the 1,826 bedspaces or increase the housing requirement by 987 homes to meet the objectively assessed needs within the GNLP and to accord with the Vision of the GNLP. This would result in a need for either 43,408 or 43,390 homes or to 42,421 or 42,403 homes and 1,826 bedspaces.
The housing requirement
3.30 The Delivery Statement on page 37 indicates that the Draft Local Plan provides a sufficient supply of housing sites to exceed the identified housing need of 40,550 homes by 9%. However, as identified above, there is actually a need for at least 42,400 homes to accord with the City Deal, meet the minimum local housing need and to accommodate the growth plans of UEA as well as a need for an additional 1,800 bedspaces in communal establishments.
3.31 In order to provide sufficient flexibility to ensure that these minimum needs will be delivered, taking account of the non-delivery of sites, it has been found by numerous Inspectors that it is appropriate to set the housing requirement above the minimum housing need4 as the Draft Local Plan seeks to do.
3.32 In Greater Norwich, the housing trajectory of the Joint Core Strategy identified that there would be 23,637 housing completions in the period 2008-19. However, only 18,835 homes have been delivered which demonstrates that at least historically, the trajectory of Greater Norwich overestimates the developable supply by circa 25%. Assuming that the current trajectory is equally as accurate, it would be appropriate to set a housing requirement 25% in excess of the minimum need for circa 42,400 homes. This would produce a housing requirement for circa 53,000 homes. This is illustrative that there is a need for a significant contingency allowance in Greater Norwich to ensure that needs are actually met. It is therefore recommended that the proposed contingency of 9% is retained as a minimum but this should be significantly greater, which in addition to the minimum housing need for circa 42,400 homes produce a housing requirement for at least 46,216 homes.
Contingency to respond to changes
3.33 The Government has identified an intention to review the standard method in September 2020 and this will be required to be responded to in the Greater Norwich Local Plan to meet the minimum local housing needs at the point of submission as required by the PPG (2a-008). This proposed review of the standard method means that the minimum housing needs may change from the 42,400 identified above. It may be that the minimum housing needs increase significantly and accordingly a sufficient developable supply (including the required contingency set out above) should be planned for to ensure that the emerging GNLP will be able to respond to the identified minimum needs at the point of submission as required by the PPG (2a-008).
3.34 Whilst it is not possible to identify the need which will arise from this review at present, it is considered that a sufficient developable supply (including the required contingency set out above) should be planned for to significantly exceed the identified need for at least 42,400 homes and provide confidence that the minimum needs arising from the review will be able to be accommodated.
Employment Land Requirement
3.35 As set out in the GNLP, there is no quantitative need for additional employment sites across the GNLP area as a whole. Nevertheless, the GNLP allocates an additional 40ha providing a total of 360ha of employment land allocations to meet the underlying demand and provide choice to the market.
3.36 Whilst these allocations will assist the economic growth of the area and represent positive planning, if a significant proportion of these are actually developed and occupied, they will be dependent upon greater numbers of incommuters from outside of the plan area. Accordingly, an appropriate monitoring framework should be put in place to ensure that a sufficient number of homes are provided to accommodate the workforce to avoid the resultantenvironmental harms of a greater dependency on long-distance commuting flows.
3.37 If the monitoring framework indicates that a greater number of jobs have been accommodated than the growth in the resident workforce such that the economy of the area becomes more dependent upon unsustainable long-distance incommuting flows, this should trigger an immediate review of the GNLP alongside a policy response with residential planning applications being considered more favourably until such time as the GNLP review is adopted to address the imbalance.
3.38 Similarly, if an insufficient amount of employment land is actually developed and occupied, this should trigger an immediate review of the GNLP to bring forward additional employment land allocations alongside a policy response to consider employment planning applications more favourably in the interim.
The approach to five-year land supply
3.39 Policy 1 proposes that the five-year land supply will be assessed across the plan area and that enough allocations are provided to demonstrate a five-year land supply at adoption. However, there is no evidence that this is the case as the GNLP is not supported by a housing trajectory contrary to paragraph 73 of the NPPF. Pegasus Group reserve the right to respond on this matter when the necessary evidence is made available.
Spatial Strategy
3.40 The Table at Policy 1 details the distribution of housing supply across the settlement hierarchy, including proposed new allocations as follows;
- Norwich urban area - 30,560 dwellings – approximately 70% of supply
- Main towns – 6,342 dwellings – approximately 14% of supply
- Key Service Centres – 3,417 dwellings – approximately 8% of supply
- Village clusters – 4,024 dwellings – approximately 9% of supply
3.41 Policies 7.1 to 7.5 provide further detail on the distribution of sites and the composition of existing and proposed allocations with regard to their size and brown or green field status. 3.42 We have concerns over the proposed spatial strategy of the emerging GNLP owing to its over reliance on housing delivery in the Norwich urban area and the proposed discrepancy in terms of settlement hierarchy between the quantum of housing allocated to Main Towns, Key Service Centres and Village Clusters.
3.43 While the Norwich urban area is a sustainable location for growth, reliance on this area for the delivery of approximately 70% of the housing growth of the GNLP up to 2038 places a requirement on existing infrastructure to accommodate an additional 30,560 dwellings in the plan period, it also requires an annual delivery rate within the area of 1,698 dwellings per annum over each of the next 18 years. This requires that the level of development in Norwich urban area alone is broadly consistent with that which has been achieved across the entire GNLP plan area since 2008. This does not appear to be realistic. If the necessary boost to housing supply is to be achieved this will require a greater range and choice of sites across all of the sustainable settlements within the plan area.
3.44 Moreover, reference to Policy 7.1 demonstrates that delivery within the Norwich Urban Area is predicated on two substantial brownfield regeneration areas, the Northern City Regeneration Area and the East Norwich Strategic Regeneration Area and several urban extensions of over 1,000 dwellings each.
3.45 Brownfield regeneration is costly and time consuming and often involves the bringing together of multiple delivery partners to achieve. The likelihood of the totality of development proposed through regeneration delivering in the plan period is therefore slim.
3.46 New strategic urban extensions can also be timely to deliver with the need for new strategic infrastructure in terms of highways and drainage to be delivered in advance of new homes.
3.47 The Councils have not produced evidence to substantiate the delivery trajectory of the brownfield regeneration sites or the urban extensions in the Norwich Urban Area. We reserve the right to comment further on this matter at the Regulation 19 consultation stage. Delay in delivery at either source of supply could prejudice the delivery of the housing requirement of the GNLP and therefore go to the soundness of the plan. 3.48 Additional certainty over the delivery of the housing requirement could be achieved by changing the emphasis of the spatial strategy by allocating more housing to the Main Towns and the Key Service Centres, including Hethersett with an associated reduction in the percentage to be delivered in the Norwich urban area and within the Village Clusters.
3.49 Additionally, we have concerns over the fact that more dwellings are proposed in the spatial strategy across Village Clusters than are allocated at Key Service Centres, including a minimum of 1,200 dwellings through a South Norfolk Village Clusters Housing Site Allocations Development Plan Document.
3.50 Without certainty over the supply of land to deliver such a quantum of development in South Norfolk Village Clusters the soundness of the spatial strategy is questionable. As a percentage of the overall new housing allocations in the Reg 18 GNLP the current spatial strategy delegates approximately 15% to a document outside of its control (1200/7,840). This is not considered to be a reasonable approach and prejudices the delivery of the emerging GNLP by 2038.
3.51 A Settlement Hierarchy approach to the distribution of development would look to allocate a higher percentage of housing to more sustainable locations with smaller amounts being allocated to lower order settlements in recognition that small developments at villages can help maintain service provision, provide vitality and help address local market and affordable housing needs.
3.52 The Reg 18 GNLP allocates more development to Village clusters than to Key Service Centres which is a counter intuitive approach to achieving sustainable development. We consider this matter should be addressed by allocating additional sites at Hethersett, with Pigeon being able to provide land for the development of new community facilities, over and above sites for new housing development.
3.53 In failing to provide an increased number of dwellings at Main Towns and Key Service Centres the Councils are also missing the opportunities presented by Pigeon to provide new community facilities that can support existing and proposed new development in sustainable locations for the plan period and beyond. 3.54 The preceding representations on the Spatial Strategy are all set in the context that the identified housing need does not even accord with the minimum set by national policy and does not take account of the needs of specific groups. It is therefore evident that the quantitative elements of the Spatial Strategy will need to be revised to ensure that housing needs can be met across the GNLP area. This should be achieved through directing more growth to the Main Towns and Key Service Centres to counterbalance the disproportionate levels of growth proposed within the Norwich urban area and Village Clusters.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 18: Do you support, object or have any comments relating to the preferred approach to sustainable communities including the requirement for a sustainability statement?
Representation ID: 22332
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
4. POLICY 2 – SUSTAINABLE COMMUNITIES
4.1 While we broadly support the overall aims and objectives of the GNLP to facilitate the growth and delivery of sustainable communities the following representations are made in response to Policy 2 and its associated reasoned justification.
Criteria 3
4.2 This Criteria requires new development to;
“Contribute to multi-functional green infrastructure links, including through landscaping, to make best use of site characteristics and integrate into the surroundings;”
4.3 This is supported as it provides for the environmental objective of sustainable development. Pigeon’s site proposals at Hethersett includes new green infrastructure linkages thereby supporting the environmental objectives of Criteria 3. These linkages will provide for biodiversity enhancement and new wildlife corridors as well as providing new footpath connectivity integrating with the existing public right of way network for the benefit of both existing and new residents.
Criteria 4
4.4 This Criteria requires new development to;
“Make efficient use of land with densities dependent on-site characteristics, with higher densities and car free housing in the most sustainably accessible locations in Norwich. Indicative minimum densities are 25 dwellings per hectare across the plan area and 40 in Norwich.”
4.5 The density of residential development at any site is dependent on other community infrastructure or site-specific requirements that may arise as a result of emerging GNLP planning policy. It may transpire that a site promoted to the plan can provide educational or health facilities in association with residential development. The need for highway infrastructure and sustainable drainage features to be provided at a site also should be taken into consideration. To that end the policy should be amended to state that; “...the indicative minimum net density of the residential element of a site allocation should be 25 dwellings per hectare.”
4.6 The Policy identifies that these minimum density standards are indicative. This is supported as it allows for flexibility to ensure that each parcel of land is used effectively, taking account of the type of development proposed, the site context and appropriate design characteristics.
Criteria 5
4.7 This Criteria identifies that the strategic gap policies will be used to ensure that landscape character is protected, and the supporting text in Table 8 suggests that this is the appropriate way to do this in the absence of a Green Belt in Greater Norwich.
4.8 It should be noted that Green Belt and the strategic gaps are not landscape designations and so the criteria does not actually fulfil the objective of the Policy. The criteria should therefore be amended to provide clarity as to whether the objective is to respect landscape characters or to provide a place-shaping tool as would be provided through the designation of Green Belt or whether both of these separate policy objectives are sought.
4.9 Paragraphs 331 and 337 of the GNLP suggests that the role of the strategic gaps is to prevent coalescence which is a place-shaping rather than landscaping policy. Therefore, it appears that the strategic gaps are being used as a replacement for Green Belt given that the GNLP acknowledges in Table 8 that there are no exceptional circumstances to justify the designation of Green Belt. The role of the strategic gaps must therefore be less restrictive than that which would be provided by a Green Belt. This is especially so where, as is the case with Land off Station Road, the designated area does not make any contribution to the separation of Hethersett and Norwich.
4.10 Even if it was appropriate to designate a proxy-Green Belt through the use of strategic gaps, paragraph 145 of the NPPF identifies that some development within a Green Belt can be appropriate and the same approach should be adopted in relation to strategic gaps. For example, where outdoor sports and outdoor recreation developments are proposed such as at Land off Burnthouse Lane, these would not be inappropriate in the Green Belt and so they would clearly not be inappropriate in a strategic gap. 4.11 However, the objective to respect landscape character is supported and this can be provided through landscape-led development at both Land off Station Road and Land off Burnthouse Lane, both of which contain generous areas of strategic landscaping and robust tree/shrub belts to ensure that these can be appropriately integrated into the surrounding landscape.
4.12 In respect of Land off Burnthouse Lane, it should also be noted that Colney Lane, which forms the eastern boundary of this parcel, forms a clearly defined boundary with an existing planting belt (approximately 20-25m wide) running along the eastern edge of Colney Lane. The existing planting belt and Colney Lane itself provide a more appropriate boundary to the strategic gap, with the agricultural fields to the east of Colney Lane providing separation between Hethersett and the A47 to the east (and Cringleford beyond).
Criteria 10
4.13 This Criteria contains the following bullet point;
“All new development will provide a 20% reduction against Part L of the 2013 Building Regulations (amended 2016);”
4.14 The Planning Practice Guidance states that;
“The National Planning Policy Framework expects local planning authorities when setting any local requirement for a building’s sustainability to do so in a way consistent with the government’s zero carbon buildings policy and adopt nationally described standards. Local requirements should form part of a Local Plan following engagement with appropriate partners and will need to be based on robust and credible evidence and pay careful attention to viability.” PPG Climate Change – Paragraph: 009 Reference ID: 6-009-20150327 Last revised 27th March 2015
4.15 PPG Paragraph: 012 Reference ID: 6-012-20190315, last revised 15th March 2019, states that Local Plans can set energy efficiency standards that exceed the energy efficiency requirements of the Building Regs, it also states that such policies should not be used to set conditions on planning permissions with requirements above the equivalent of the energy requirement of Level 4 of the code for Sustainable Homes – which is identified as approximately 20% above current Building Regs across the build mix. The PPG also requires such policy requirements to be viable. 4.16 The Code for Sustainable Homes was withdrawn in 2015 and replaced by technical housing standards. The GNLP Reg 18 has chosen to continue to pursue the ‘20% above Building Regs’ approach at criteria 10 of Policy 2.
4.17 The Alternative approaches section states that this target is a ‘challenging but achievable requirement’ and that to go beyond 20% would be unviable.
4.18 What is not clear however is the Councils’ evidence to require energy savings of ‘at least 20%’ above Building Regs when the PPG states ‘approximately 20% across the build mix’.
4.19 It is not clear either whether this policy requirement has been appraised across a range of site typologies in the viability appraisal and whether it has been tested in conjunction with the other policy requirements of the plan, including those of emerging Policy H5 which seeks:
i. 33% affordable housing, (except in Norwich City Centre);
ii. all new housing development to meet the Governments Nationally Described Space Standards; and
iii. 20% of major housing developments to provide ‘at least 20% of homes to the Building Regulation M4(2)(1) standard or any successor’.
4.20 Whilst the objectives behind these are supported, taken together these emerging policy requirements of the plan could prejudice the delivery of some sites within the emerging plan.
Master planning
4.21 Community engagement prior to submitting an application is supported. However, Policy 2 identifies master planning using a recognised community engagement process for schemes of more than 200 dwellings will be encouraged. It is not clear what is meant by such a master planning process and clarity would be welcomed.
4.22 It is considered likely that such a master planning process would exceed the requirements of each of the joint authorities existing adopted Statements of Community Invo4.23 Furthermore, there is no guarantee that the masterplan outcomes of such a community engagement process will be considered appropriate or acceptable by the local authority as there is no mechanism for validating the outcomes of the process pre-submission. This could result in difficulties for all parties at the application stage should masterplan amendments be required as a result of statutory and internal local authority consultations post submission. lvement and also goes beyond the requirements of paragraphs 39 to 41 of the NPPF and the PPG (20-010).4.23 Furthermore, there is no guarantee that the masterplan outcomes of such a community engagement process will be considered appropriate or acceptable by the local authority as there is no mechanism for validating the outcomes of the process pre-submission. This could result in difficulties for all parties at the application stage should masterplan amendments be required as a result of statutory and internal local authority consultations post submission.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 19: Do you support, object or have any comments relating to the specific requirements of the policy?
Representation ID: 22333
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
4. POLICY 2 – SUSTAINABLE COMMUNITIES
4.1 While we broadly support the overall aims and objectives of the GNLP to facilitate the growth and delivery of sustainable communities the following representations are made in response to Policy 2 and its associated reasoned justification.
Criteria 3
4.2 This Criteria requires new development to;
“Contribute to multi-functional green infrastructure links, including through landscaping, to make best use of site characteristics and integrate into the surroundings;”
4.3 This is supported as it provides for the environmental objective of sustainable development. Pigeon’s site proposals at Hethersett includes new green infrastructure linkages thereby supporting the environmental objectives of Criteria 3. These linkages will provide for biodiversity enhancement and new wildlife corridors as well as providing new footpath connectivity integrating with the existing public right of way network for the benefit of both existing and new residents.
Criteria 4
4.4 This Criteria requires new development to;
“Make efficient use of land with densities dependent on-site characteristics, with higher densities and car free housing in the most sustainably accessible locations in Norwich. Indicative minimum densities are 25 dwellings per hectare across the plan area and 40 in Norwich.”
4.5 The density of residential development at any site is dependent on other community infrastructure or site-specific requirements that may arise as a result of emerging GNLP planning policy. It may transpire that a site promoted to the plan can provide educational or health facilities in association with residential development. The need for highway infrastructure and sustainable drainage features to be provided at a site also should be taken into consideration. To that end the policy should be amended to state that; “...the indicative minimum net density of the residential element of a site allocation should be 25 dwellings per hectare.”
4.6 The Policy identifies that these minimum density standards are indicative. This is supported as it allows for flexibility to ensure that each parcel of land is used effectively, taking account of the type of development proposed, the site context and appropriate design characteristics.
Criteria 5
4.7 This Criteria identifies that the strategic gap policies will be used to ensure that landscape character is protected, and the supporting text in Table 8 suggests that this is the appropriate way to do this in the absence of a Green Belt in Greater Norwich.
4.8 It should be noted that Green Belt and the strategic gaps are not landscape designations and so the criteria does not actually fulfil the objective of the Policy. The criteria should therefore be amended to provide clarity as to whether the objective is to respect landscape characters or to provide a place-shaping tool as would be provided through the designation of Green Belt or whether both of these separate policy objectives are sought.
4.9 Paragraphs 331 and 337 of the GNLP suggests that the role of the strategic gaps is to prevent coalescence which is a place-shaping rather than landscaping policy. Therefore, it appears that the strategic gaps are being used as a replacement for Green Belt given that the GNLP acknowledges in Table 8 that there are no exceptional circumstances to justify the designation of Green Belt. The role of the strategic gaps must therefore be less restrictive than that which would be provided by a Green Belt. This is especially so where, as is the case with Land off Station Road, the designated area does not make any contribution to the separation of Hethersett and Norwich.
4.10 Even if it was appropriate to designate a proxy-Green Belt through the use of strategic gaps, paragraph 145 of the NPPF identifies that some development within a Green Belt can be appropriate and the same approach should be adopted in relation to strategic gaps. For example, where outdoor sports and outdoor recreation developments are proposed such as at Land off Burnthouse Lane, these would not be inappropriate in the Green Belt and so they would clearly not be inappropriate in a strategic gap. 4.11 However, the objective to respect landscape character is supported and this can be provided through landscape-led development at both Land off Station Road and Land off Burnthouse Lane, both of which contain generous areas of strategic landscaping and robust tree/shrub belts to ensure that these can be appropriately integrated into the surrounding landscape.
4.12 In respect of Land off Burnthouse Lane, it should also be noted that Colney Lane, which forms the eastern boundary of this parcel, forms a clearly defined boundary with an existing planting belt (approximately 20-25m wide) running along the eastern edge of Colney Lane. The existing planting belt and Colney Lane itself provide a more appropriate boundary to the strategic gap, with the agricultural fields to the east of Colney Lane providing separation between Hethersett and the A47 to the east (and Cringleford beyond).
Criteria 10
4.13 This Criteria contains the following bullet point;
“All new development will provide a 20% reduction against Part L of the 2013 Building Regulations (amended 2016);”
4.14 The Planning Practice Guidance states that;
“The National Planning Policy Framework expects local planning authorities when setting any local requirement for a building’s sustainability to do so in a way consistent with the government’s zero carbon buildings policy and adopt nationally described standards. Local requirements should form part of a Local Plan following engagement with appropriate partners and will need to be based on robust and credible evidence and pay careful attention to viability.” PPG Climate Change – Paragraph: 009 Reference ID: 6-009-20150327 Last revised 27th March 2015
4.15 PPG Paragraph: 012 Reference ID: 6-012-20190315, last revised 15th March 2019, states that Local Plans can set energy efficiency standards that exceed the energy efficiency requirements of the Building Regs, it also states that such policies should not be used to set conditions on planning permissions with requirements above the equivalent of the energy requirement of Level 4 of the code for Sustainable Homes – which is identified as approximately 20% above current Building Regs across the build mix. The PPG also requires such policy requirements to be viable. 4.16 The Code for Sustainable Homes was withdrawn in 2015 and replaced by technical housing standards. The GNLP Reg 18 has chosen to continue to pursue the ‘20% above Building Regs’ approach at criteria 10 of Policy 2.
4.17 The Alternative approaches section states that this target is a ‘challenging but achievable requirement’ and that to go beyond 20% would be unviable.
4.18 What is not clear however is the Councils’ evidence to require energy savings of ‘at least 20%’ above Building Regs when the PPG states ‘approximately 20% across the build mix’.
4.19 It is not clear either whether this policy requirement has been appraised across a range of site typologies in the viability appraisal and whether it has been tested in conjunction with the other policy requirements of the plan, including those of emerging Policy H5 which seeks:
i. 33% affordable housing, (except in Norwich City Centre);
ii. all new housing development to meet the Governments Nationally Described Space Standards; and
iii. 20% of major housing developments to provide ‘at least 20% of homes to the Building Regulation M4(2)(1) standard or any successor’.
4.20 Whilst the objectives behind these are supported, taken together these emerging policy requirements of the plan could prejudice the delivery of some sites within the emerging plan.
Master planning
4.21 Community engagement prior to submitting an application is supported. However, Policy 2 identifies master planning using a recognised community engagement process for schemes of more than 200 dwellings will be encouraged. It is not clear what is meant by such a master planning process and clarity would be welcomed.
4.22 It is considered likely that such a master planning process would exceed the requirements of each of the joint authorities existing adopted Statements of Community Invo4.23 Furthermore, there is no guarantee that the masterplan outcomes of such a community engagement process will be considered appropriate or acceptable by the local authority as there is no mechanism for validating the outcomes of the process pre-submission. This could result in difficulties for all parties at the application stage should masterplan amendments be required as a result of statutory and internal local authority consultations post submission. lvement and also goes beyond the requirements of paragraphs 39 to 41 of the NPPF and the PPG (20-010).4.23 Furthermore, there is no guarantee that the masterplan outcomes of such a community engagement process will be considered appropriate or acceptable by the local authority as there is no mechanism for validating the outcomes of the process pre-submission. This could result in difficulties for all parties at the application stage should masterplan amendments be required as a result of statutory and internal local authority consultations post submission.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement
Comment
Draft Greater Norwich Local Plan – Part 1 The Strategy
Question 27: Do you support, object or have any comments relating to approach to affordable homes?
Representation ID: 22334
Received: 16/03/2020
Respondent: Pigeon Investment Management Ltd
Agent: Pegasus Group
5. POLICY 5 – HOMES
5.1 Policy 5 identifies that proposals should address the need for homes for all sectors of the community having regard to the latest evidence which is to be supported.
Space Standards
5.2 The Policy requires all housing development to meet the Government’s Nationally Described Space Standard for internal space (NDSS)5.
5.3 NDSS are not currently a mandatory requirement of Building Regulations and therefore should a Council wish to introduce them they are required to accord with the tests of NPPF 2019 paragraph 127f and Footnote 46 which requires the use of the NDSS to be ‘justified’.
5.4 The Councils also need to demonstrate that the costs associated with implementing the NDSS have been subject to whole plan viability appraisal as required by planning practice guidance6.
5.5 The Council’s NDSS Study (August 2019) is attached at Appendix B of the Interim Viability Appraisal (2019). The Councils have not identified harm that may be arising to residents as a result of dwellings not being built to the NDSS. Nor is there any evidence that houses not built to the NDSS are not selling as well as those that are, or that such homes are considered inappropriate by purchasers.
5.6 If the Government considered it appropriate to make the NDSS mandatory, as proposed by draft Policy 5, then this could quickly and easily be introduced through Building Regulation legislation rather than through the Development Plan process.
5.7 Introducing the NDSS in the GNLP will have an impact on the cost of construction of dwellings and therefore on their affordability to consumers, as well as on the density of development that can be achieved at development sites, thereby affecting the efficient use of land. It will also have a knock-on effect on the viability of the GNLP which may translate into impact on the deliverability of dwellings and therefore on the delivery of the emerging plan.
Accessible and Specialist Housing
5.8 The Policy then proceeds to support the delivery of accessible and specialist housing providing they have good access to local services which is welcomed.
5.9 However, as identified in response to Policy 1 there is a need for 1,826 bedspaces in residential institutions for older people across the plan area which would be best addressed, at least in part, through the identification of specific allocations to meet this need. In the absence of such allocations, the GNLP cannot demonstrate and more importantly may not meet the objectively assessed needs of this population contrary to paragraphs 35a and 61 of the NPPF.
5.10 There is a need for 1,081 bedspaces in Broadland, 57 in Norwich and 679 in South Norfolk over the plan period. In 2018/19, 8 were built in Broadland leaving a residual need for 1,072 and 83 were built in Norwich meaning that there is no residual need in this LPA. None were built in South Norfolk leaving a residual need for 679. In order to ensure that these needs are addressed it would therefore be appropriate to allocate sites in both Broadland and South Norfolk to meet these needs.
5.11 In addition to the need for residential institutions (including care homes and nursing homes) there will also be a need for independent living units including those which offer communal facilities and/or a level of care (such as sheltered housing or extra care) to accommodate older households.
5.12 Norfolk County Council has assessed the need for such accommodation in Living Well, July 2018 and identify a need for 3,376 such homes in Broadland, 122 in Norwich and 3,257 in South Norfolk. Owing to the scale of this need, it would again be appropriate to identify specific allocations to ensure that the needs of communities are addressed.
5.13 Any such allocations for residential institutions or independent living units should be primarily within Broadland and South Norfolk where the need arises on sites which have good access to local facilities and to public transport infrastructure. 5.14 The site at Land off Station Road, Hethersett offers a suitable location for such provision and provides sufficient scope to address a significant element of the residual need for bedspaces in a care home and/or sheltered/extra care accommodation within a care village.
5.15 The Policy requires proposals for major housing development to provide;
“...at least 20% of homes to the Building Regulation M4(2)(1) standard or any successor.”
5.16 This implies that any development of 10 or more dwellings will need to provide upwards of two dwellings that meet the accessibility standard to enable people to stay in their homes longer, however there is no evidence provided that such a high percentage of adaptable dwellings will be required over the life time of the plan. While it is long recognised that many affordable homes are built to such a standard, this is an additional policy requirement that developers are being requested to meet which will have a knock on impact on the cost of new homes and therefore their accessibility in terms of cost to those seeking to enter the housing market.
5.17 It is considered that the requirement for the delivery of adaptable and specialist accommodation should be specific to individual allocations which will ensure that the needs can be met across the GNLP area and that these will be met at appropriate locations in close proximity to services and facilities.
Self/Custom-Build
5.18 There does not appear to have been any assessment of the need for self/custombuild housing to justify the requirement in Policy 5 for 5% self/custom-build on sites of 40 or more homes.
5.19 The Councils have not published evidence to justify their policy requirement to self-build plots either with regard to the percentage of plots sought or the size of site from which they are to be sought. As written sites of 40 or more homes will be required to provide at least two plots as self/custom build.
5.20 Notwithstanding the above, concern is expressed that the policy as written is not adequately evidenced. The self-build register of each Council is not publicly available to validate the policy approach being pursued. Generally, many of those seeking to build their own homes wish to do so on plots in rural areas or villages, not in urban locations, therefore there is no certainty over the delivery of the policy approach being proposed.
5.21 Therefore, it is considered that the requirement for the delivery of self-build plots should be specific to individual allocations to ensure that the needs will be met across the GNLP area and that these will be met at locations and at scales which are likely to be attractive to the self-build market. In addition, the policy could be expanded to allow self-build schemes to come forward where they are well related to settlement boundaries and have access to a range of services and facilities.
Pegasus Group are pleased to submit representations for Pigeon Investment Management Ltd on behalf of the landowners in support of the proposed development of the site at Land at Hethersett. Please find attached the response form, the representations and a Delivery Statement