Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22274

Received: 16/03/2020

Respondent: Barton Willmore

Representation Summary:

Q9) Do you support, object, or have any comments relating to the approach to
Housing set out in the Delivery Statement?
2.17 We broadly support the approach to Housing set out in the Delivery Statement.
2.18 The Delivery Statement as set out within Section 4 of the Draft Strategy correctly identifies
how the delivery of housing, jobs and infrastructure are interlinked and mutually supportive.
We support the Plan identifying these matters as being interwoven and expect it to promote
and enable growth within key areas which maximise the benefits in respect of these. However,
we maintain that growth within the Villages should be assessed as part of a single Plan.
Arbitrarily directing 1,200 homes on small sites within villages and small settlements where
jobs, infrastructure and supporting services will be least readily available, is not supported.
The whole housing provision should be directed to this Plan comprehensively.2.19 Key to this is the need for the Plan for the right number of homes (accounting for past underdelivery
anticipated growth). The Authorities appear to have simply identified the minimum
number of homes, by referring to the standard method as 40,451 new homes. However, the
NPPG states that the standard method is the ‘minimum’ starting point for determining the
number of homes needed in the area. It does not reflect changing economic circumstances.
The NPPG specifically highlights that growth strategies and housing deals in place to facilitate
greater growth are such reasons to support housing above the standard method. The
Strategic Housing Market Assessment for Central Norfolk, specifically references that the
three authorities of Broadland, Norwich and South Norfolk have agreed a City Deal with
ambitious plans for an additional 13,000 jobs and 3,000 homes by 2026, making their JCS
target 27,000 additional jobs, plus those 13,000 City Deal jobs, over the period 2008-26. This
is referenced in the Economy Chapter and supporting text to Policy 6 and should be reflected
in the Housing Numbers. Accordingly, the SHMA identifies a need for 44,714 new homes
across the period 2016 – 2036, which equates to an average of 2,236 dwellings per annum.
2.20 It is not clear therefore why Table 6 of the GNLP highlights a need for 40,451 new homes.
Further, the SHMA goes on to highlight that to accommodate the additional workers
associated with the City Deal, a further 8,361 new homes should also be planned for. Table
6 of the GNLP should therefore clearly provide as a minimum for 44,714 homes, and given
the commitment to the City Deal, extend that by a further 8,361 homes in the Plan Period
consistent with the NPPG.
2.21 Similarly the NPPG states: “There may, occasionally, also be situations where previous levels
of housing delivery in an area, or previous assessments of need (such as a recently-produced
Strategic Housing Market Assessment) are significantly greater than the outcome from the
standard method. Authorities will need to take this into account when considering whether it
is appropriate to plan for a higher level of need than the standard model suggests”
2.22 Given the change associated with the standard method, and the high amount of housing in
the previous GNLP to 2026, against which there is a significant shortfall, we are strongly of
the view that a 20% buffer should be applied. This would support in the region of 9,000
homes over and above the housing need calculated using the standard method, and would
thus broadly align with the additional homes that would be required consistent with the City
Deal identified within the SHMA.
2.23 Once this additional quantity of housing has been accounted for – i.e. circa 49,000 – 54,000,
the GNLP should then seek to direct additional growth to the most sustainable locations - for
example the A11 and Cambridge to Norwich Tech Corridor as the priority for growth in the
region.
2.24 The Joint Core Strategy set a requirement for a total of 36,820 homes to be constructed over
the period 2008 to 2026, or 2,046 per year. Expected delivery has failed to materialise
resulting in a total shortfall of housing delivery since the start of the Plan period equating to
4,283 homes (a full 2 years of housing requirements). Within the Norwich Policy Area the
shortfall is greater with a cumulative under delivery of 6,169 homes since the start of the

Table 2.1: Greater Norwich/Joint Core Strategy Area Housing requirements and delivery
(from JCS and AMR’s)
Plan period (3.4 years of NPA housing requirements).
[see attached document]

2.25 We strongly believe that the shortfall in delivery should be remedied in the forthcoming Plan
period. Whilst the Authorities have reported an increase in delivery over the past three years
in their Annual Monitoring reports, the latter of these for the period 2018/2019 has been
specifically reported verbally by the Authorities as ‘Draft’. Notwithstanding, the shortfall
remains significant, and the means of calculating the delivery is not supported
2.26 Further, on the basis of previous under-delivery it is essential that housing numbers are
accelerated in the early years of the Plan Period, where we believe a 20% buffer should be
provided to the Five Year Housing Supply across the Greater Norwich Area, with a
commitment in the Plan to accelerate growth in the first five years of the Plan. Whilst it is
recognised that there are external factors that can affect delivery, the collective failure of
the Joint Core Strategy’s planned allocations in not meeting the target represents a real risk
that the existing commitments will not be fully delivered by 2036.
2.27 We actively encourage the Authorities to be ‘pro-active’ and plan for the homes required in
the Growth Deal and increase the buffer to 20% (against ‘need’). This will also make up for
the shortfall against the Core Strategy to date, which we highlight above.
2.28 Further, based on previous failings, housing should only be allocated to sites where there is
a reasonable prospect of delivery (in line with the requirement of the NPPF). The Plan
currently relies on sites (specifically within the Growth Triangle) which have not delivered as
anticipated against their Joint Core Strategy requirements. Evidence is not provided todemonstrate these sites will deliver within the proposed Plan Period which risks the Plan
being found unsound on account of being unjustified, not effective and not positively prepared
on this basis. This is discussed further in our response to Questions 38 – 40.
2.29 In this respect, it will be critical that the Plan allocates deliverable sites in suitable locations.
Footnote 45 to the Delivery Statement specifically states that: “The housing allocations in
this draft plan will only be carried forward to the submission version of the Plan if evidence
is provided to show that they can be delivered by 2038”. This suggests that the Authorities
have not yet undertaken an assessment of when sites will be delivered. The Housing &
Economic Land Availability Assessment (HELAA) is vague on detail over delivery and provides
no anticipated trajectory as would be expected. As detailed further later in this section, the
Growth Strategy fails to achieve this requirement.
2.30 We strongly recommend the Authorities revisits the strategy to support development in
suitable locations where there has been a track record of delivery. Wymondham, identified
as a contingency location, is such a location and continues to experience high demand for
new homes.2.31 As a key location within the Cambridge Norwich Tech Corridor, Wymondham should be
supported for further growth including upgrading the ‘contingency’ to a full allocation.

Full text:

Full representations (with appendices) submitted in response to the current Regulation 18 consultation of the Greater Norwich Local Plan on behalf of Landstock Estates Ltd and Landowners Group Ltd.

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22391

Received: 16/03/2020

Respondent: Norwich Green Party

Representation Summary:

Support greater use of legal powers. Developers are dragging heels on redeveloping brown field sites in Norwich at expense of countryside.

Full text:

For full representation and additional information submitted, please refer to the attached documents.

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22393

Received: 16/03/2020

Respondent: Norwich Green Party

Representation Summary:

Object to providing 9% more homes than needed and identifying two 'contingency' locations, especially if windfalls are to be discounted (and we object to this also). The Plan should ensure delivery of JCS allocations before developing new sites allocated in GNLP.

Object to small scale growth in villages as development dispersal would have large adverse impact on carbon emissions. No evidence to show that dispersal would support village services. Norfolk CC allowed extensive housebuilding in villages in 1970s and this increased car commuting whilst not protecting services. All new development should be concentrated in or close to Norwich or in towns with rail connections.

Full text:

For full representation and additional information submitted, please refer to the attached documents.

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22511

Received: 16/03/2020

Respondent: Broadland Green Party

Representation Summary:

Comment: There is no clear target on energy efficiency and the reduction of carbon emissions. Back in 2008 the Climate Change Strategy for Norfolk signed by all seven district councils and the county council stated: ““Most of the houses and infrastructure that we build now will still be standing in 2080, when the impacts of climate change will be much greater. The considerable level of growth planned for the county by 2026 provides an immediate strategic opportunity to plan housing and infrastructure that will be much more resilient to the impacts of climate change. This will reduce long term risks to Norfolk residents and help avoid the potentially major expense of addressing problems at a later stage, after the impacts of climate change have been felt.”
Recent house building has generally been of a poor quality meeting the minimum of required Building Regulations. There needs to be a significant change in the standard of house building. This must be accompanied by strengthened building control departments to carry out adequate building inspections as in the past. All new housing must be carbon neutral or at least built to Passivhaus standards.
There is no provision for allotment space in any of the current developments despite it being a clearly stated Policy 2 objective.

Full text:

I attach the feedback from Broadland Green Party members on the GNLP Consultation.

Each section is identified but not all questions have been answered. However, all questions are included to maintain the numbering.

See attached

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22628

Received: 13/03/2020

Respondent: M Scott Properties Ltd

Number of people: 2

Agent: Bidwells

Representation Summary:

Support, with comments
The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered fully accords with para 67 of the NPPF and is supported.
Whilst the submission of Delivery Plans as part of a planning applications is supported the documents need to recognise that there may be unforeseen material changes in circumstances, which could impact the delivery of an allocation.
The Council’s approach to providing choice and flexibility in terms of housing growth by accommodating 9% more homes than are needed (increasing to 10% at the Regulation 19 stage), is supported. This buffer will help maintain the supply and delivery of housing in accordance with the NPPF and specifically the Government’s objective of encouraging authorities to consider more growth than required to meet local housing need, particularly where there is potential for significant economic growth. This is particularly relevant given the under delivery of housing in the Greater Norwich Area between 2011 and 2019

Full text:

On behalf of M Scott Properties Ltd we are instructed to submit representations to the Greater Norwich Local Plan Regulation 18 (c) consultation. The representations are split into two, reflecting the two parts of the Greater Norwich Local Plan; the Strategy Document and the Sites Plan, in respect of GNLP0337.

The attached document provides a complete record of the representations made on behalf of M Scott Properties Ltd.

The various technical studies referred to in the Representation and the Delivery Statement can be accessed in the attachments also.

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22657

Received: 16/03/2020

Respondent: Saxlingham Nethergate Parish Council

Representation Summary:

This states that ‘this plan also provides choice and flexibility by ensuring there are enough committed sites to accommodate 9% more homes than “need”.’ CPRE Norfolk disagrees that such a high level of sites should be provided within the GNLP. As a starting point please refer to our response to Q3 where we argue that the insistence of the Government to use the 2014 National Household Projections should be challenged to ensure that the most up-to date figures are used instead. In addition, by proposing not to include windfalls in the buffer the over-allocation of unnecessary housing will be compounded further.

It is very disappointing that there is no mention of phasing as an option within the Draft Plan and Housing Delivery Statement, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%) have supported CPRE Norfolk on this issue and have signed a pledge to this effect. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward.

Full text:

Saxlingham Nethergate Parish Council met last week and considered their response to the current consultation.

They noted, considered and decided to fully endorse the response produced by CPRE in full (attached).

Q1 Please comment on or highlight any inaccuracies within the introduction

Please see our more detailed responses to the questions below, which make our concerns clear. In particular we have a major concern with the Draft Strategy as it makes no mention of using phasing for the delivery of new housing. We consider that any new sites allocated in the GNLP should be phased by being placed on a reserve list, and under phased development only built out when most of the existing JCS sites have been used. Inclusion of all the sites for immediate development will lead to developers “cherry-picking” the most profitable sites and newly allocated green field sites in less sustainable locations will be developed first, with even more land banking of currently allocated sites. In short, deliver the already allocated 82% of the 44,500 new homes, before giving permissions on the remaining 18%.

The current Local Plan, the Joint Core Strategy (JCS) was adopted in March 2011 with amendments adopted in January 2014: it has been in place for just over 6 years. When adopted, it was considered to be the blueprint for development in Norwich, Broadland and South Norfolk until 2026, and in doing so provided clear signals about where growth should and should not take place. In the introduction to the current consultation document it is stated that housing, jobs, services and infrastructure needs to be provided at the right time ‘and in the right places’. CPRE Norfolk questions how the response to this has changed so markedly since adoption of the JCS and well before that Local Plan was due to expire. In particular, the construction of the Broadland Northway (NDR) (noted in paragraph 7 of the introduction) was largely intended to help the distribution of traffic to and from new housing built inside its length and in the northeast growth triangle. Moreover, there was a clear focus for housing and other growth to be in and close to Norwich, with minimal new development to be permitted in the rural policy areas of Broadland and South Norfolk. The GNLP strategy seems to be contradicting the direction of travel envisaged in the JCS and appears to undermine the planning process. A great strength of the JCS is the protection it gave to the rural areas: this seems to be sacrificed in the GNLP Draft Plan.

Paragraph 6 of the Introduction is clear that ‘the GNLP must also assist the move to a post-carbon economy and protect and enhance our many environmental assets.’ It will be difficult if not impossible to meet these targets if new housing to the scale proposed in the draft strategy is dispersed across the rural areas of Broadland and South Norfolk. The main justification for this appears to be the availability of primary school places in the “village clusters”, whereas there are more important measures for sustainability which should be taken into account, including the number of car journeys and journeys by delivery vehicles to new housing, along with the associated congestion such vehicles will result in.

The introduction mentions in paragraph 25 that South Norfolk District Council will draw up its own South Norfolk Village Clusters Housing Site Allocations document. CPRE Norfolk is very concerned that by adopting such an approach this allocations document will not receive the same level of scrutiny as the main draft strategy document. We are also very concerned that the number of additional dwellings on top of the existing commitment of 1,349 houses is given as ‘a minimum of 1,200’. The use of the word ‘minimum’ is unnecessary and potentially very alarming, as in effect this gives no limit to the maximum number of houses which could be allocated in those “village clusters”. Given the draft plan provides enough committed sites ‘to accommodate 9% more homes than “need”, along with two “contingency” locations for growth’ (page 37) and does not include windfall developments in its housing totals, the word “minimum” should be replaced with “maximum” or “up to” as is the case with the figures for Broadland’s “village clusters”. Why is there this discrepancy in language between two authorities which are part of the same Local Plan: it appears to be inconsistent and illogical.

Q3 Please comment on or highlight any inaccuracies within the spatial profile.

Paragraph 41 states that ‘this GNLP needs to plan for additional housing needs above and beyond existing commitments based on the most up-to date evidence’. However, the calculations of housing need are based on the 2014 National Household Projections, which are not the most up-to date statistics, nor are they sufficiently robust to be used for such an important and far-reaching strategy. CPRE Norfolk admits that the 2014 figures are those which central Government expects to be used. However, several Local Planning Authorities, including North Norfolk District Council, are challenging the use of the 2014 figures, instead suggesting that the more up-to date 2016 National Household Projections should be used. CPRE Norfolk agrees that the GNLP needs to be based on the most up-to date evidence, and therefore requests the GNDP insists on using the 2016 National Household Projections. If the most recent ONS statistics had been used, current commitments are sufficient to cover housing needs to 2038.

Q6 Do you support or object to the vision and objectives for Greater Norwich?

A major concern is that the draft plan largely consists of a wish list, but lacks real targets or actions, particularly on the environment and climate change. For example, our environment is lauded but the draft plan notes in paragraph 37 that life expectancy for men in Norwich is 10.9 years lower in the most deprived areas compared to the least deprived. We cannot see any specifics within the draft plan as to how this shocking fact is to be addressed.

Paragraph 120 stresses the need for ‘good access to services and facilities’ for ‘our suburbs, towns and villages’. While this is provided in the first two categories of settlement there is insufficient provision or access to services in many of the settlements within the “village clusters”. The decision to allocate additional new housing beyond what is already allocated within the JCS is based almost solely on the existence of a primary school with available places or potential for expansion within the “cluster”. This does not amount to the provision of ‘good access to services and facilities’ and therefore this level of new housing in “village clusters” should not be permitted within the GNLP.

Paragraph 125 is perhaps the strongest argument for not allocating additional housing to “village clusters” within the GNLP. Clearly, there will be a major need for journeys from and to work for many of those living in any such new housing, in addition to additional journeys by delivery vehicles to this new housing. This paragraph states the need for ‘a radical shift away from the use of the private car, with many people walking, cycling or using clean public transport.’ For the majority of the plan period it is highly wishful thinking to think that ‘electric vehicles will predominate throughout Greater Norwich’. These additional journeys will not only add to the “carbon footprint” but will also add to congestion on the road network, affecting air quality and the wellbeing of residents. If the intention of the GNLP is to locate housing close to jobs, which we agree should be a major aim, then any additional allocations of housing should be located in or close to Norwich, where there are realistic opportunities to walk or cycle to work and to services, or to use public transport to do so. The existing allocations of housing within the JCS and to be carried forward to the GNLP will provide sufficient new accommodation close to other places of work in main towns and key service centres.

Paragraph 129 states: ‘greater efficiency in water and energy usage will have minimised the need for new infrastructure, and further reductions in carbon emissions will be delivered through the increased use of sustainable energy sources. New water efficient buildings will have also contributed to the protection of our water resources and water quality, helping to ensure the protection of our rivers, the Broads and our other wetland habitats.’ We strongly feel that it is imperative that Per Capita Consumption (PCC) of water is further reduced to below the Government’s prescribed 110 litres per person per day in order to deliver this statement in paragraph 129. East Anglia is the driest region in the UK: our aquifers, rivers and wetlands are already at breaking point, as are many of the region’s farmers, who are seeing their abstraction licences reduced or revoked. If more demanding standards to reduce PCC water consumption are not set as part of the GNLP, this will further adversely impact upon the environment, impacting on the Broads and wetlands, which in turn will impact the region’s aspirational growth for tourism and will severely impact the regional agricultural economy. To ensure that the water-supply to existing users is not compromised it is sensible to restrict the number of new houses to a level that realistically covers actual need, and this fact reinforces our case for phasing of housing and our questioning of the need for a higher than necessary buffer.

Paragraph 132 makes the claim that new quality development will be located to minimise the loss of green-field land. CPRE Norfolk strongly suggests that the best way to achieve this is not to allocate additional sites for housing in “village clusters”. Indeed, there are already sufficient allocated sites for housing in the JCS being proposed to be carried forward to the GNLP in the Norwich fringe parishes, main towns and key service centres to keep pace with the likely build rates of development. The exception to this should be any brownfield sites, particularly those within Norwich, which should be prioritised into a “brownfield first” policy. This should form part of a phased approach to new housing, so that existing allocations from the JCS and any brownfield sites should be developed before permitting any additional allocated sites to be built-out.
One effective way to prevent the unnecessary loss of much greenfield land would be to institute a green belt on the “green wedges” model around Norwich, as requested by 84 respondents and 1,912 petition signatories (currently at 2,200 signatures) calling for this according to the draft statement of consultation, September 2018, for the Stage A Regulation 18 Site Proposals and Growth Options consultation. CPRE Norfolk is very concerned that this proposal or option has been removed from the current consultation.

In conclusion for this question, we find that the vision and objectives contain serious flaws, especially in regard to the way in which they conflict with policies within the current Local Plan, which withstood the rigorous inspection process.

Q9 Do you support, object, or have any comments relating to the approach to Housing set out in the Delivery Statement?

This states that ‘this plan also provides choice and flexibility by ensuring there are enough committed sites to accommodate 9% more homes than “need”.’ CPRE Norfolk disagrees that such a high level of sites should be provided within the GNLP. As a starting point please refer to our response to Q3 where we argue that the insistence of the Government to use the 2014 National Household Projections should be challenged to ensure that the most up-to date figures are used instead. In addition, by proposing not to include windfalls in the buffer the over-allocation of unnecessary housing will be compounded further.

It is very disappointing that there is no mention of phasing as an option within the Draft Plan and Housing Delivery Statement, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%) have supported CPRE Norfolk on this issue and have signed a pledge to this effect. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward.

Q12 Do you support, object, or have any comments relating to the Climate Change Statement?

Given the stated measures in the Climate Change Statement, it is impossible to see how the proposed additional allocation of sites for housing in “village clusters” can be justified. Furthermore, it is stated that ‘growth in villages is located where there is good access to services to support their retention’, when this is rarely the case beyond providing a primary school with sufficient places or room for expansion. Many services are simply not located within the “village clusters” with many additional vehicle journeys being an inevitable consequence of such housing allocations. Therefore, these would be contrary to measures 2 and 3 of the Climate Change Statement.

By locating additional housing in “village clusters” there would be an increased need to travel, particularly by private car, due to the lack of viable and clean public transport. If Climate Change is seriously going to be addressed then it is unacceptable to allocate additional sites for housing in rural areas which are not at all, or poorly served by public transport. New housing must be located where jobs and a wide range of services are or can be provided.

In addition CPRE Norfolk is concerned by the lack of any detailed policy on the design of new housing in the draft Plan document, other than a brief mention in the ‘Design of development’ in the Climate Change Statement. Detailed requirements to insist that new houses are built to the highest possible environmental standards beyond the Government’s minimum standards are needed, if serious steps are to be taken towards addressing Climate Change issues.

Q13 Do you agree with the proposed Settlement Hierarchy and the proposed distribution of housing within the hierarchy?

We supported the continuation of the settlement hierarchy as defined in the JCS. We wonder why and where the concept of “village clusters” has been introduced into the planning process. For many reasons they appear to be a flawed unsustainable concept. A real strength of the JCS was its inclusion of a Norwich Policy Area and Rural Policy Areas, and therefore we are very disappointed that this distinction has been abolished. The Rural Policy Areas gave real protection to the countryside: this is threatened by the introduction of the village cluster approach. This is another example of how the Draft GNLP contradicts the existing agreed Local Plan.

As noted above in our response to Q1 CPRE Norfolk has serious misgivings about the separation of the sites and allocations for new housing in the South Norfolk Village Clusters from the rest of the GNLP and its current consultation. In addition, we strongly object to the use of the open-ended statement that these South Norfolk “village clusters” will be allocated a ‘minimum’ of 1,200 houses, rather than giving a maximum number as is the case for the Broadland “village clusters”. If the reason for this separation is, as was given at the recent GNDP meeting of 6th January 2020, the lack of suitable sites coming forward in these South Norfolk “village clusters”, then this gives another good reason why the delivery of housing should be phased. Clearly the sites included in the JCS have undergone rigorous assessment and their inclusion in the Local Plan is an acknowledgement of their suitability for development. It makes absolute sense that these suitable sites should be developed first especially given the fact that any new sites coming forward are deemed to be unsuitable.

Paragraph 163d states that the strategy for location of growth ‘focusses reasonable levels of growth in the main towns, key service centres and village clusters to support a vibrant rural economy’, before suggesting that the approach to “village clusters” is ‘innovative’. The claim that providing new housing in such locations will support services is, we contend, largely illusory. Instead, additional new housing will lead to more car and delivery vehicle journeys, with residents travelling longer journeys to access the services they require such as health services and a supermarket. Given that the majority of any such new houses will be larger “family” homes, with children just or more likely to be of secondary or tertiary school or college age than of primary school age. This will have further impacts on carbon reduction due to the additional journeys needed to secondary schools or colleges.

It is clearly demonstrated in the table on page 80 of the 23 June 2017 GNDP Board Papers that the most reasonable option for the distribution of housing in terms of the environment (e.g. minimising air, noise and light pollution; improving well-being; reducing C02 emissions; mitigating the effects of climate change; protecting and enhancing biodiversity and green infrastructure; promoting the efficient use of land; respecting the variety of landscape types in the area; ensuring that everyone has good quality housing of the right size; maintaining and improving the quality of life; reducing deprivation; promoting access to health facilities and healthy lifestyles; reducing crime and the fear of crime; promoting access to education and skills; encouraging economic development covering a range of sectors and skill levels to improve employment opportunities for residents and maintaining and enhancing town centres; reducing the need to travel and promoting the use of sustainable transport modes; conserving and enhancing the historic environment and heritage assets; minimising waste generation; promoting recycling; minimising the use of the best agricultural land; maintaining and enhancing water quality and its efficient use) is Option 1: urban concentration close to Norwich. In terms of all these factors taken together the least desirable option as shown on this chart is Option 4: dispersal. We therefore strongly support urban concentration in and close to Norwich as the way forward, because it is best for the environment, minimising climate change and the well-being of residents.

There is very little economic evidence to suggest that cementing new housing estates on the edges of villages will bring any boost to local services, but rather they will put a strain on these services, where they exist.

We cannot understand why the table showing the same set of factors in the Interim Sustainability Appraisal for the GNLP on page 42 shows some different results from the table on page 80 of the 23 June 2017 GNDP Board Papers. While the most recent table confirms that overall urban concentration is a better option than dispersal, it is even clearer in the earlier version. The table on page 42 shows that urban concentration is better than dispersal in terms of: minimising air, noise and light pollution; improving well-being; reducing C02 emissions; mitigating the effects of climate change; protecting and enhancing biodiversity and green infrastructure; encouraging economic development covering a range of sectors and skill levels to improve employment opportunities for residents and maintaining and enhancing town centres; reducing the need to travel and promoting the use of sustainable transport modes. However, in terms of some of the other factors it seems that changes have been made to the table so that several options appear to be equal in terms of impacts, instead of showing what the earlier table demonstrated, which is that concentration was the best option and dispersal the least reasonable option.

Given the clear benefits and advantages from these documents for the environment, climate change and other areas, as well as other reservations around lack of sustainability and issues of delivery, we strongly urge the GNDP to remove the requirement for additional new sites for housing in the “village clusters” from the GNLP.

Q14 Do you support, object, or wish to comment on the approach for housing numbers and delivery?

Paragraph 145 claims that the strategy ‘is informed by consultation feedback’, yet chooses to ignore much from previous consultations even where such feedback was significantly in favour of a particular approach. An example of this is the position taken towards windfalls. Responses to the Stage A Regulation 18 Site Proposals and Growth Options consultation were significantly against (110 to 45) counting windfalls in addition to the additional (at that point 7,200) housing, and yet this has been ignored in the current draft plan consultation. By not counting windfalls in the calculation for housing numbers in table 6, there will be a resulting over-supply of houses, particularly if the out-of-date 2014 National Housing Projections are used. Windfalls are acknowledged as a reliable source of new housing and many Local Authorities do count them towards their housing targets: their contribution towards housing targets in the GNLP should lead to a reduction in the number of new sites which are allocated.

CPRE Norfolk also has specific concerns about the approach for housing numbers in the South Norfolk Village Clusters, as there is no total figure given for this new housing, but instead an open-ended ‘minimum of 1,200 homes’. This use of the word “minimum” needs to be removed and replaced by a “maximum” total, so that further potential over-supply is avoided. At best, the actual delivery of new housing in the plan area has just exceeded 2,000 dwellings per annum, with 1,500 being more typical. At this build-rate, current commitments cover actual housing need to 2038.

CPRE Norfolk wants to see sites allocated for housing in the existing plan (JCS) developed before any new sites that are likely to be added in to the emerging GNLP are built out. Although we understand that it will not be possible to prevent new sites being included in the plan, we are asking that these extra land allocations for housing are treated as phased development and that building should not occur on these sites until the current JCS sites have been used up. We think this is a sensible approach because not only does it protect the countryside, but also at current rates of house building there is enough land already allocated in the JCS to cater for the building that is likely to occur over the new Plan period.

There is very little evidence to show that increasing the amount of land on which houses can be built actually increases the rate at which they are built. All that happens is that developers ‘cherry-pick’ the most profitable sites, which are likely to be the newly allocated green field sites and that this will lead to even more land banking of currently allocated sites. This will also mean that many less sustainable (or as CPRE Norfolk would argue, unsustainable) sites for housing are developed rather than those with more sustainable locations. This would result in more pollution and congestion, with the negative consequences for the climate and climate change. It also means that expensive infrastructure which has been provided to facilitate new housing in the existing plan, could end up being an irrelevant and embarrassing white elephant.

It is disappointing that there is no mention of phasing as an option within the consultation document, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%)have supported CPRE Norfolk on this issue and have signed a pledge to this effect, which was included in the previous consultation, but ignored in the current draft Plan. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward. Clearly there is a democratic deficit: meaningful consultation should not ignore this volume of common-sense opinion.

Q18 Do you support, object or have any comments relating to the preferred approach to sustainable communities including the requirement for a sustainability statement?

Commenting on Policy 2 – Sustainable Communities, CPRE Norfolk questions the use of the words “as appropriate” in the policy’s introduction, as this means the requirements would be far too open to interpretation as to what is “appropriate” and therefore opportunities to ensure that ‘mitigating and adapting to climate change, [and] assisting in meeting national greenhouse gas emissions targets’ will be missed.

This concern is particularly relevant when considering how new housing development in the “village clusters” will fulfil the first requirement to ‘ensure safe, convenient and sustainable access to on-site and local services and facilities including schools, health care, shops, leisure/community/faith facilities and libraries.’ The rationale behind these “village clusters” appears to be mainly based on the availability and accessibility of a primary school. However, safe, convenient and sustainable access to the other features on this list are equally important. Adequate health care and shops simply are not available in these ways to many of the preferred new sites for housing in the “village clusters”, therefore giving further reasons why such sites should not be included in the GNLP.

There is a worrying disconnect between the aspirations in point 6 with the need to ‘manage travel demand and promote public transport and active travel within a clearly legible public realm’, and the imposition of additional new housing in “village clusters”. It is difficult if not impossible to see how residents of the majority of this new housing will be able to use active travel or public transport, due to the likely distances from workplaces and the lack of suitable public transport.

If additional new housing is developed in “village clusters” most of the working residents will not have ‘good access to services and local job opportunities’. Instead there will be an unsustainable increase in the number of journeys to and from work using private vehicles, which will not be electric-powered certainly for the majority of the plan period. It is very doubtful if additional housed will provide enough business to keep a village shop open, but they will definitely increase the number of journeys made for delivery and service vehicles, making this housing even more unsustainable.

If communities are to ‘minimise pollution’ as required to do so by point 8, it is imperative that no additional new housing is allocated to “village clusters”, as this would lead to an increase in petrol and diesel-powered vehicle journeys to and from such housing. This, along with the resultant increase in congestion, makes this additional housing highly undesirable.

Q19 Do you support, object or have any comments relating to the specific requirements of the policy?

We comment on various aspects of Table 8 relating to Policy 2.


Point 3, Green Infrastructure. The opening statement is: ‘Developments are required to provide on-site green infrastructure appropriate to their scale and location’. The three main benefits listed are biodiversity gain, promotion of active travel and the reduction of flood risk, which are key NPPF priorities.
The NPPF is also supportive of biodiversity on a more strategic scale, and the importance of ecological networks and Nature Recovery Networks. While Green Infrastructure is useful, and can play a role in these, it clearly has limitations in a wider role across the wider countryside, and in linking high designated nature conservation sites.
Point 5, Landscape, should recognise that valued landscapes often sit with good wildlife habitats. This is particularly the case for river valleys and the Broads. A strong message from the Environment Plan and the recommendations from the recent Landscapes Review is to make links between landscapes and wildlife, and not consider them in isolation. This is covered more fully in our response to Q21.
Point 9, Water. In our view it needs to be recognised that SUDS is not a silver bullet when dealing with flood risk. Areas of low-lying land with a high water-table can present a problem in ‘getting the water way’, and if it does manage to do that existing settlements can be put at risk.
A high level of growth puts a greater pressure on the capacity of Waste Water Treatment Works, both on the discharge of effluent into river systems, and on flood risk with foul water. This will be exacerbated by under or lagging investment in WWTW. Although not the responsibility of the Greater Norwich Authorities, their Annual Monitoring Reports (AMRs) should record and monitor incidents.

The statement in Point 9, Water - Key issues addressed by policy 2 states that: ‘Government policy expects local planning authorities to adopt proactive strategies to adapt to climate change, taking into account water supply and demand considerations. It allows local plans to set a higher standard of water efficiency than the Building Regulations where evidence justifies it. For housing development, only the higher Building Regulations standard for water prescribed by Government (110 litres per person per day) can [be] applied through local plans and more demanding standards cannot be set. If the potential to set more demanding standards locally is established by the Government in the future, these will be applied in Greater Norwich.’ The closing note at the bottom of the wording states: ‘Implementation of the standards for water efficiency will be supported by an updated advice note.’

We comment that it is imperative that Per Capita Consumption (PCC) of water is further reduced below the Government's prescribed 110 litres per person per day in order to deliver the statement made in Section 3, paragraph 129 which states: ‘Greater efficiency in water and energy usage will have minimised the need for new infrastructure, and further reductions in carbon emissions will be delivered through the increased use of sustainable local energy sources. New water efficient buildings will have also contributed to the protection of our water resources and water quality, helping to ensure the protection of our rivers, the Broads and our other wetland habitats.’ East Anglia is the driest region of the UK, our aquifers, rivers and wetlands are already at breaking point, as are many of the regions farmers who are seeing their abstraction licences reduced or revoked. If more demanding standards to reduce PPC water consumption are not set as part of the local plan, this will further adversely impact upon the environment, impacting upon the Broads and wetlands, which in turn will impact the regions aspirational growth for tourism and will severely impact the regional agricultural economy.

These pressures are further evidence as to why the amount of new housing should be tightly controlled.

Q21 Do you support, object or have any comments relating to the approach to the natural environment?

CPRE Norfolk supports further ‘development of a multi-functional green infrastructure network’. However, we have major concerns about how biodiversity net gain will be evaluated, assessed and measured, although it is recognised that at this point it is unclear as to what the legal requirements of this policy will be given the current progress of the Environment Bill.

Paragraphs 183 and 184 talk about the great weight placed on protecting the natural environment in Greater Norwich, but then there are no clear details on how this will be achieved. Provision of a Green Belt on a ‘green wedges’ model would go some way to addressing this.

This draft Plan takes a very narrow view on the NPPF and 25-Year Plan on policies for the natural environment, namely that strategy, aims and policies are restricted to considering only gain as seen through the prism of development. There is a duty to cooperate between Councils, and that should automatically happen. While implementation may be less direct, there should be a wider strategic vision that does support policies of the NNPF. CPRE Norfolk has a proposal for a Nature Recovery Network from the North Norfolk Coast to the east coast (including parts of the Broadland DC area), by the enhancement of the ecological network provided by our river systems, and supported by the environmental land management scheme. This includes a detailed planning and land management document for landscapes and wildlife relating to a Nature Recovery Network, which also include an AONB extension to the Norfolk Coast AONB into the full catchments of the twin North Norfolk rivers Glaven and Stiffkey.

Q22 Are there any topics which have not been covered that you believe should have been?

Yes, the decision to remove a possible green belt for Norwich on the green wedges (or other) model from the draft Local Plan is, in the opinion of CPRE Norfolk, unjustified, particularly bearing in mind the large degree of support it received in the earlier Stage A Regulation 18 Site Proposals and Growth Options consultation.

Q23 Do you support, object or have any comments relating to [the] approach to transport?

CPRE Norfolk supports the provision of new railway stations at Rackheath and especially Dussindale as outlined in paragraph 206.

We note the contradiction in the Transport for Norwich Strategy as reflected in Policy 4 – Strategic Infrastructure, when it aims ‘to promote modal shift’ by having ‘significant improvements to the bus, cycling and walking network’ on the one hand, but promotes ‘delivery of the Norwich Western Link road’ on the other. CPRE Norfolk fully supports the former set of aims while opposing the latter.

CPRE Norfolk supports ‘protection of the function of strategic transport routes (corridors of movement)’, and as part of this strongly suggests that no industrial development should be permitted on unallocated sites along such corridors of movement.

The desire to support ‘the growth and regional significance of Norwich Airport for both leisure and business travel to destinations across the UK and beyond’ surely contradicts the aspirations for addressing climate change stated within Section 4 of the draft GNLP?

Public transport provision needs to be improved and made affordable, not only between main towns and key service centres, but to and from smaller settlements. This is essential even without any further growth of these settlements, as many areas of rural Norfolk have become public transport deserts.

Q27 Do you support, object or have any comments to [the] approach to affordable homes?

CPRE Norfolk supports the affordable housing policy within Policy 5 – Homes. It is essential that the requirements of this policy are followed when progressing applications for housing on sites of 10 dwellings or more. Any policy which encourages the building of a greater proportion of affordable homes should be adopted. It is to be hoped that government policy will change further regarding viability tests so they become more transparent, so that it would be less easy for developers to evade their responsibilities to deliver affordable homes. More central government intervention is required if these needed homes are to be built. Ideally, affordable and social housing should be provided where needed as a stand-alone provision, and not be connected to private developers’ housing targets. Lessons must be learned from the history of poor delivery of affordable homes, to ensure that the policy to provide 28% or 33% affordable houses must be enforced. We support rural exception sites as a means of supplying needed local affordable and social housing. An approach based on the provision of stand-alone sites such as these, in our opinion is a far better method for addressing affordable and social housing needs.

Q34 Do you support, object or have any comments relating to the approach to employment land?

CPRE Norfolk while not agreeing with the allocation of so much green-field land for employment/economic use, it is essential that any such allocated sites are adhered to. This means that no exceptions should be made, particularly for larger businesses, to develop sites outside these allocated areas. If any such un-planned growth were to be permitted this would lead to further erosion of the area’s landscape and environment, along with issues regarding the sustainability of any such sites. A large amount of the land allocated in the JCS for employment use remains for use. The development of these sites should be prioritised before any new sites are added.

Q45 Do you support or object or wish to comment on the overall approach for the village clusters? Please identify particular issues.

“Village Clusters” appear to be an artificial concept, invented to justify the dispersal of housing into the countryside. It is difficult to understand the justification for changing the current settlement hierarchy within the JCS to that proposed in this draft plan, in particular by eliminating the JCS categories of Service Villages, Other Villages, smaller rural communities and the countryside, which provided opportunities for a more nuanced approach to housing allocation, appropriate to each category of community/settlement within their own setting, landscape and context. The “village cluster” approach is a relatively crude one, with much more of a ‘one size fits all’ approach. CPRE Norfolk is particularly disappointed to see that the current JCS settlement hierarchy is not even offered as an ‘alternative approach’ in the draft GNLP, and wishes to see this rectified.

Even if the “village clusters” are adopted it would still be important to limit these to the area within their settlement boundaries and to designate the remaining largely rural areas as “countryside”, which would then require a further policy similar to the current JCS policy 17: smaller rural communities and the countryside. It is a great regret that the Rural Policy Areas of the JCS will be eliminated in the GNLP, as these provided effective protection of the countryside from unnecessary development.

The different approach for “village clusters” in Broadland compared to those in South Norfolk is not acceptable given the emphasis on the GNLP being a strategic plan for the whole of Greater Norwich. The “village clusters” in Broadland and South Norfolk should be treated in the same way if they are to be included in the final GNLP. This means that a maximum number of new housing for both areas should be included in the GNLP rather than the current different approach/wording, by having Broadland’s “village clusters” providing ‘up to 480’ whereas South Norfolk is to provide ‘a minimum of 1,200’: both areas should have the same wording i.e. ‘up to …’. We are concerned that all of the “village clusters” in South Norfolk will not be scrutinised to the same degree as those in Broadland due to the separate South Norfolk Village Clusters Housing Site Allocations document.

CPRE Norfolk is concerned by the use of primary school catchments acting as ‘a proxy for social sustainability’, with apparently no other sustainability measures being taken into account when decided on the amount and location of housing within “village clusters”. This does not make the proposed allocated housing within “village clusters” sustainable as required by the NPPF. Other measures should be taken into account within the social, economic and environmental spheres.

Q46 Do you support or object or wish to comment on the approach for specific village clusters? Please identify particular issues.

We are concerned that all of the “village clusters” in South Norfolk will not be scrutinised to the same degree as those in Broadland due to the separate South Norfolk Village Clusters Housing Site Allocations document.

Q47 Do you support or object or wish to comment on the overall approach for Small Scale Windfall Housing Development? Please identify particular issues.

CPRE Norfolk feels that windfall development should be restricted to sites within settlement boundaries. Housing need is already catered for by other policies in the Plan. Windfall developments should also count towards overall housing targets.

Q48 Do you support or object or wish to comment [on] any other aspect of the draft plan not covered in other questions? This includes the appendices below. Please identify particular issues.

CPRE Norfolk does not understand why there has been a major change in direction and policy as to where new development should be allocated in the GNLP compared to the current JCS. The JCS was only finally fully adopted in January 2014, just over 6 years ago. In the JCS housing concentrated in and close to Norwich was agreed and supported by hugely expensive infrastructure projects, in particular the Northern Distributor Road (now known as the Broadland Northway), which was primarily constructed to distribute traffic form and to new housing developments on the northern fringes of Norwich and in the North-east Growth Triangle. It would be a massive and costly folly to change that policy to one which allowed for the dispersal of much housing across the rural areas of Broadland and South Norfolk, where there is insufficient infrastructure, services and public transport, which would mean such development would be unsustainable. This would only lead to more congestion and pollution, leading to problems in meeting carbon-reduction targets.

CPRE Norfolk wants to see sites allocated for housing in the existing plan (the JCS) developed before any new sites that are likely to be added in to the emerging GNLP are built on. Although we understand that it will not be possible to prevent new sites being included in the plan, we are asking that these extra land allocations for housing are treated as phased development and that building should not occur on these sites until the current JCS sites have been used up.

There is very little evidence to show that increasing the amount of land on which houses can be built actually increases the rate at which they are built. All that happens is that developers ‘cherry-pick’ the most profitable sites, which are likely to be the newly allocated green field sites and that this will lead to even more land banking of currently allocated sites.

It is very disappointing that there is no mention of phasing as an option within the consultation document, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%) have supported CPRE Norfolk on this issue and have signed a pledge to this effect. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward.

We question the relevance of a plan whose horizon is 2038, which is likely to be reviewed and replaced on at least three occasions before its end-date, and we fear that on each of these occasions more unsustainable housing will be crammed in at the expense of the countryside. What is perhaps most disturbing is that so many people living in the area are not aware of the current JCS let alone the emerging GNLP, and that where citizens are engaged in the process seem to have their views discounted. For example, this is clear where the views of over 38% of the Broadland and South Norfolk Parish and Town Councils regarding the phasing of housing development are apparently ignored. Current consultation processes are not reaching the majority of people: perhaps a Citizens’ Assembly approach would be a means which would enable more people to be involved.

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22692

Received: 16/03/2020

Respondent: Strutt & Parker LLP

Representation Summary:

[On behalf of Scott Properties Ltd]
15. The Delivery Statement set out at Paragraph 139 of the Draft Strategy sets out that the Plan will promote a pro-active approach to delivery through only allocating housing sites where a reasonable prospect of delivery can be evidenced, taking into account policy requirements. This approach accords with paragraph 67 of the NPPF and is supported.
16. In terms of providing flexibility and including a 9% buffer, this accords with the objective of ensuring that a sufficient amount and variety of land can come forward. It is also recognised that it is proposed that the buffer will increase to 10% at the Regulation 19 stage, when the village clusters allocations will be included. It is acknowledged that the Plan aims to comply with the NPPF paragraph 68 requirement to accommodate at least 10% of housing requirement on sites no larger than 1 ha. However, given the uncertainty around the Carrow Works site (1,200) homes, it is recommended that where reasonable alternative sites exist in sustainable locations, additional smaller sites of up to c. 25 dwellings (expected delivery from 1 ha) should also be allocated throughout the Plan area to increase certainty around delivery and supply, particularly in the early parts of the Plan period, supporting the Government’s objective of significantly boosting the supply of homes.

Full text:

Please find attached the following documentation forming a consultation representation for the Greater Norwich Local Plan: Stage C Regulation 18 Draft Strategy and Site Allocations on behalf of my colleague, Adam Davies.

- Completed document for the following documents and questions:
- Draft Greater Norwich Local Plan – Part 1 The Strategy
- Question 6
- Question 9
- Question 11
- Question 12
- Question 13
- Question 14
- Question 16
- Question 17
- Question 18
- Question 25
- Question 29
- Question 32
- Question 41
- Question 42
- Question 48
- Draft Local Plan – Part 2 Site Allocations
- Policy GNLP2136
- Greater Norwich Local Plan Interim Viability Study (November 2019)
- Proving Layout
- Parameter Plan
- Pedestrian Access Plan
- Highways Technical Note
- Vehicular Access Proposals
- Barley Close Pedestrian Link
- Utilities Assessment
- Flood Risk Technical Note
- Infiltration Testing
- Preliminary Surface Water Attenuation Calculations
- Bat Scoping and Activity Survey
- Great Crested Newt and Amphibian Survey
- Reptile Survey
- Arboricultural Survey
- Archaeological and Heritage Assessment
- Noise Assessment

Attachments:

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22722

Received: 16/03/2020

Respondent: Pegasus Group

Representation Summary:

Paragraph 59 of the National Planning Policy Framework (NPPF) sets out to support the Government’s
drive to boost housing supply, a sufficient amount and variety of sites must come forward, specific
housing requirements are met, and that consented sites are developed without unnecessary delay.
The GNLP Delivery Statement sets out that housing sites will only be allocated where it can be
Evidenced that delivery can be achieved within the plan period. In addition to this, applicants are
required to submit delivery plans alongside planning applications to provide a guide of their expected
delivery rates. Where agreed delivery rates are not met then the Councils would have the option to
bring forward development sites through compulsory purchase orders. Furthermore, the GNLP allows
for some flexibility by including a total housing figure 9% higher than the governments’ standard
method figure (which as outlined in Question 14 has been miscalculated), and is considering two
contingency sites at Costessey and Wymondham (both for approximately 1,000 homes each) to offset
any non-delivery within the plan period. Given that the Councils are proposing such strategies
indicate that the Councils are clearly concerned with the continuation of historic under-delivery
persisting into the new Plan period. To avoid a continuation of delays to the delivery of large-scale
Sustainable Urban Extensions (SUEs) including contingency sites, a range of smaller sites should also
be included.
Consequently, to provide the Councils with greater certainty, they should consider increasing the
housing figure above the housing target figure. In doing so, Councils should identify land and
development sites on the edge of established sustainable settlements which are capable of
accommodating housing growth within the plan period. These sites are able to come forward at a
faster rate and are fully capable of delivering sustainable development in accordance with paragraph
8 of the NPPF.
Land off Norton Road, Loddon falls outside of the current settlement boundary but adjoins it to the north west with the proposed allocation of Policy GNLP0312 (Land to the east of Beccles Road). The village of Loddon is classed as a Key Service Centre, the largest, one of the most sustainable villages in the area. Indeed, the settlement possesses a wide range of shops, services, infrastructure, employment opportunities and public transport links. Thereby the allocation of the small-scale housing site of Land off Norton Road would lead to the natural extension of the sustainable settlement of Loddon and will assist in providing the Councils with greater certainty over housing delivery during the 2 next plan period.

Full text:

See summaries for responses

- GNLP Regulatory 18 Consultation Questions- Land off Norton Road, Loddon
- GNLP Regulatory 18 Consultation Questions- Dairy Farm, Thorpe End

Introduction
These representations are submitted on behalf of our client Halsbury Homes Ltd in response to the Greater Norwich Local Plan (GNLP) Regulation 18 Consultation.
Our client is promoting Land off Norton Road, for residential development in the GNLP.

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22751

Received: 16/03/2020

Respondent: Rosconn Group

Representation Summary:

RSL fully support the overall purpose of the Delivery Statement which recognises the importance of inclusive growth and sustainable development, and more specifically the acknowledgment of the interrelationship between the delivery of housing, jobs and infrastructure.

In terms of Housing, again we generally support a pro-active approach of only allocating housing sites where there is a reasonable prospect that their delivery, taking account of policy requirements in the Plan, can be evidenced. However, it is notable that approximately 83% of the minimum Local Housing Need figure is to be delivered through existing commitments, some of which are from sites already allocated in existing development plans. These existing development plans include the 2011 Joint Core Strategy, alongside subsequent Site Allocations and Area Action Plans dating from 2014-2016.

It is not clear from the evidence provided to date what proportion of the commitments are on sites for which no planning permission has yet been secured despite being allocated for several years, but there is certainly some indication that not all historic allocations are likely to remain deliverable, particularly in the context of a more stringent national planning policy framework. Furthermore, in reviewing the latest Annual Monitoring Report 2018-19, it is stated at paragraph 3.21 that despite recent successes, housing delivery overall within the Greater Norwich area has fallen 4,255 homes below the JCS target since the start of the plan period, with the under delivery resulting in housing shortfalls in the NPA that total 6,076 homes, with shortfalls particularly acute in the Broadland part of the NPA. It concludes by stating that it remains a significant challenge to achieve and sustain a level of delivery that would enable the JCS housing target to be met by 2026.

It is also notable that footnote 45 of the Delivery Statement in respect of Housing, states that housing allocations in the Draft Plan will only be carried forward to the Submission Version of the Plan if evidence is presented to show that they will be delivered by 2038. Whilst we would support this approach, we would encourage the authorities to rigorously review the deliverability of long-standing allocated housing sites which have not progressed to date. Similarly, those sites with outline planning permissions where reserved matters have not followed in a reasonable period of time should also be carefully scrutinised to determine whether they remain deliverable during the plan period.

Full text:

Re: Greater Norwich Local Plan – Regulation 18 Draft Plan Consultation

We write in response to the consultation of the above document.

Rosconn Strategic Land (RSL) welcome the opportunity to comment on the Draft GNLP and having reviewed the document and its supporting evidence, provide comments below. RSL represent the owners of land to the south of Flowerpot Lane, Long Stratton who we have entered into a promotion agreement with in order to promote their land for residential development. The site has not previously been considered for development by the Councils and as such, a completed Site Submission Form also accompanies these representations which demonstrates it is suitable, available and deliverable.

Part 1 – The Strategy

Question 9

RSL fully support the overall purpose of the Delivery Statement which recognises the importance of inclusive growth and sustainable development, and more specifically the acknowledgment of the interrelationship between the delivery of housing, jobs and infrastructure.

In terms of Housing, again we generally support a pro-active approach of only allocating housing sites where there is a reasonable prospect that their delivery, taking account of policy requirements in the Plan, can be evidenced. However, it is notable that approximately 83% of the minimum Local Housing Need figure is to be delivered through existing commitments, some of which are from sites already allocated in existing development plans. These existing development plans include the 2011 Joint Core Strategy, alongside subsequent Site Allocations and Area Action Plans dating from 2014-2016.

It is not clear from the evidence provided to date what proportion of the commitments are on sites for which no planning permission has yet been secured despite being allocated for several years, but there is certainly some indication that not all historic allocations are likely to remain deliverable, particularly in the context of a more stringent national planning policy framework. Furthermore, in reviewing the latest Annual Monitoring Report 2018-19, it is stated at paragraph 3.21 that despite recent successes, housing delivery overall within the Greater Norwich area has fallen 4,255 homes below the JCS target since the start of the plan period, with the under delivery resulting in housing shortfalls in the NPA that total 6,076 homes, with shortfalls particularly acute in the Broadland part of the NPA. It concludes by stating that it remains a significant challenge to achieve and sustain a level of delivery that would enable the JCS housing target to be met by 2026.

It is also notable that footnote 45 of the Delivery Statement in respect of Housing, states that housing allocations in the Draft Plan will only be carried forward to the Submission Version of the Plan if evidence is presented to show that they will be delivered by 2038. Whilst we would support this approach, we would encourage the authorities to rigorously review the deliverability of long-standing allocated housing sites which have not progressed to date. Similarly, those sites with outline planning permissions where reserved matters have not followed in a reasonable period of time should also be carefully scrutinised to determine whether they remain deliverable during the plan period.

Question 11

Again, RSL generally support the overarching approach with respect to prioritising the benefits and delivery of infrastructure in order to benefit existing communities, support growth and improve connectivity. However, alongside the other providers mentioned, recognition should also be given to the development industry’s role in bringing forward key infrastructure. They are often central to the funding and delivery of infrastructure alongside new housing and economic development, which benefits the wider community.

Question 13

Whilst RSL generally agree with the proposed settlement hierarchy, there appears to be no explanation within Policy 1 or elsewhere, as to what the purpose of the hierarchy is other than to confirm that this has been used to inform the distribution of growth. Whilst paragraph 166 confirms which settlements fall into which level of the hierarchy, there appears to be no explanation as to what the role and function of each tier in the hierarchy is. It is therefore difficult to comment on whether the proposed distribution of growth within the hierarchy is appropriate or not. It would therefore assist the reader if the role and function for each tier in the hierarchy could be clearly set out within the policy or otherwise within the explanatory text.

Notwithstanding the above, further explanation is required as to the role and function of the Stratgeic Growth Area (SGA). Whilst Policy 1 and paragraph 166 state that it is the settlement hierarchy that has guided the distribution of growth, this appears to then be contradicted by the statement at paragraph 169 which suggests that the strategy is to direct 78% of the growth to the SGA. It is therefore unclear whether it is the settlement hierarchy or the SGA that have influenced the distribution of growth and this should be clarified.

In terms of the distribution of growth, Policy 1 states that growth has been distributed in line with the settlement hierarchy to provide good access to services, employment and infrastructure. However, in reality, the majority of growth (83% of the minimum Local Housing Need) is already committed through historic allocations and existing permissions, 72% of which are within the Norwich Urban Area. Considering the overall geographical scale of the 3 authorities, this is a significant amount of development committed to a relatively small area. Whilst it is agreed that a large proportion of growth should be located in and around the principal settlement within the Plan area, directing further growth through new allocations to an area which is already well-catered for in terms of future growth is questionable, particularly from a deliverability perspective. Is it realistic to expect that the scale of growth already committed, alongside an additional 4,395 homes through new allocations is likely to be deliverable within the Plan period? The evidence referred to earlier has highlighted the real challenge to achieving the levels of growth identified for the NPA through the current JCS. Directing further growth to this area must therefore raise concerns about whether this is a justified and effective strategy. Furthermore, will this achieve the objectives set out at paragraph 164, particularly (4) focussing a reasonable level of growth in the main towns, key service centres and village clusters to support a vibrant rural economy, and (6) allocating a significant number of medium and smaller scale sites in towns and villages to provide a balanced range of site types to allow choice, assist delivery and allow smaller scale developers and builders into the market?

In summary, RSL object on the basis that further consideration should be given to directing a greater proportion of the residual housing requirement through new allocations towards the Main Towns and Key Service Centres, particularly those that are located outside the SGA in order to enable the sustainability benefits of housing growth to be distributed more widely and fairly. Settlements such as Long Stratton and Aylsham for instance play a wider role in serving a principally rural hinterland and growth can assist in maintaining and enhancing services and facilities that these wider rural communities are reliant on. This approach would remain aligned with the preferred growth option of directing the majority of growth around the Norwich Urban Area and within the SGA, whilst allowing a greater level of dispersal to support thriving rural communities. Such an approach is also likely to be more deliverable than the current “all the eggs in one basket” approach where almost all of the growth is directed to the Norwich Urban Area / SGA with very little being directed to the rural communities elsewhere within the plan area. This is not considered to be consistent with the objectives of paragraph 78 of the NPPF.

Question 14

Policy 1 states that there is a need for ‘around 40,550 new homes’ during the plan period 2018-2038. Table 6 confirms that the Local Housing Need figure, being the minimum local housing need figure as calculated using the Government’s standard methodology is 40,541 dwellings. The PPG ‘Housing and economic needs assessment’ states at paragraph 2 that the standard method identifies a minimum annual housing need figure but does not produce a housing requirement figure. Paragraph 10 then explains when it may be appropriate to plan for a higher housing need figure than the standard method indicates. It also reiterates the Government’s commitment to more homes being built and support for ambitious authorities who want to plan for growth. In also confirming that the local housing need figure provides only a minimum starting point in determining the number of homes needed in an area, it acknowledges that it does not attempt to predict the impact of future government policies, changing economic circumstances or other factors that might have an impact on demographic behaviour. As such, it then outlines some of the circumstances where it may be appropriate to plan for a higher number of houses. This includes where growth strategies are proposed (e.g. Housing Deals), strategic infrastructure is planned or where an authority agree to take on unmet need from a neighbouring authority.

RSL consider that the housing requirement set out in the Plan should be described as a minimum and not be seen as a ceiling on a greater level of housing coming forward during the Plan period, so that it is consistent with the NPPF’s focus on significantly boosting the supply of housing. It is also considered that the housing requirement within the Draft Plan does not reflect government guidance in that it only proposes to meet the minimum starting point figure and no evidence has been provided to support why this decision has been made or why it is considered to be appropriate. It is notable that the Draft Plan also sets an objective to deliver around 33,000 new jobs by 2038, this target being derived from an analysis of ‘enhanced growth’.

The Strategy Advice document of December 2017 highlights that the detailed assessment of the Greater Norwich sub-region set out within the Employment Land Assessment confirms the considerable potential of the area in the future to achieve significant levels of economic growth based on an assessment of the key economic assets and drivers within the Greater Norwich economy. It continues that these strengths suggest that the growth potential of Greater Norwich extends beyond ‘business as usual’ base growth, leading to GVA’s assessment which identifies an ‘enhanced’ growth scenario that maximise the area’s economic growth potential. This is due to the area having a strong foundation of academic and commercial research, an increasingly entrepreneurial economy, a base of internationally recognised businesses and a diverse property portfolio which suggest Greater Norwich is well positioned nationally and internationally to compete for future business investment as well as continuing to grow its own business base. The document does however highlight at paragraph 2.7 that the base model used to develop the future employment growth does include an assumed level of population growth to balance jobs growth with labour supply and migration, albeit recognising this does not necessarily align with objectively assessed housing needs.

Policy 6 later on in the Draft Plan further elaborates on the proposed economic growth strategy for the area which makes reference to supporting and delivering the ambitions of a series of other related strategies such as the LEP’s Economic Strategy and Local Industrial Strategy, the Cambridge Norwich Tech Corridor initiative and the enhanced growth outlined in the Greater Norwich City Deal, as well as acknowledging the wider benefits of linkages to the Oxford Cambridge Arc and the London Stansted Cambridge corridor.

In such circumstances, RSL object and consider that the authorities should consider a meaningful uplift to the minimum Local Housing Need figure to help support and deliver the ambitious, above-trend economic growth strategy that the Draft Plan is seeking to deliver.

In other respects, reference is made at paragraph 159 to the fact that the housing figures within Policy 1 make provision for a 9% buffer over and above the minimum Local Housing Need figure. Notwithstanding comments above regarding the need to uplift the housing requirement to reflect economic growth aspirations, 9% is not considered to be sufficient when considered in the context of the overall scale of housing need within the 3 authorities and the fact the majority of this is being met by long-standing housing allocations many of which have failed to come forward as planned. In such circumstances, RSL object and consider a much larger buffer of 20% would be more appropriate to ensure there is flexibility in the housing supply to respond to rapid changes, as required by paragraph 11 of the NPPF.

It is acknowledged that some additional flexibility is offered, as detailed at paragraph 162 with reference to a proposed contingency site for 1,000 dwellings at Costessey and potentially a further 1,000 dwellings contingency site at Wymondham, albeit no specific site has been identified at present. Whilst RSL are supportive of the principle of identifying contingency sites, we do object to the approach to allocating such large strategic sites and the decision on where such sites should be located. Contingency sites should, by their very nature, be ‘oven-ready’ sites that could be delivered quickly in order to meet a shortfall in the housing land supply until such time as allocated sites are able to deliver. Allocating one or two strategic sites of 1,000 dwellings are likely to face similar difficulties to the sites they are seeking to supplement in view of longer lead-in times compared to smaller sites. A more credible solution would be to identify a greater number of smaller sites in a variety of locations that could collectively bring forward housing quickly to address short term shortfalls in housing supply. Geographically, as highlighted earlier in our representations, identifying contingency sites in the same location as the majority of allocated housing sites is more than likely to result in a similar fate. A much more credible approach would be to identify contingency sites in a range of locations across the Plan area to maximise their ability to address a rapid change in circumstances and avoid any potential localised issues that may arise in the housing market, such as absorption rates in the Norwich Urban Area as a result of multiple housing sites competing against each other in a very small geographical area. Therefore, distribution of some or all of the contingency sites outside the Norwich Urban Area may be a more effective and justified approach than the one currently proposed.

Question 15

In connection with our response to Question 14 above, it is not clear whether the economic growth ambitions of Policy 6 are fully consistent with the housing requirement set out within the Plan. Moreover, is there any evidence to indicate that 40,541 dwellings in the period to 2038 is sufficient to support the economic aspirations of the emerging Plan to 2038? Until such time as this is clarified, we wish to maintain an objection that the economic objectives are not deliverable, justified or effective due to a lack of suitable housing for the employees required to service future jobs growth or otherwise, there is likely to be an increase in in-commuting to the area from outside in order to service these newly arising jobs which would not be a sustainable approach to adopt.

Question 16

RSL support the intention that the five-year housing land supply should be calculated on the basis of the whole of the Greater Norwich area.

Question 42

RSL wish to comment on Policy 7.2 and the associated text with specific reference to Long Stratton. At paragraph 326, it is stated that due to the scale of existing commitments in the settlement, the Plan does not make any further allocations in addition to Long Stratton’s Action Area Plan. It then goes on to state that evidence shows that the scale of commitments means that parts of the site allocated in the AAP will not be delivered until after 2038. We cannot locate the evidence referred to at footnote 104 ‘Analysis of Commitments’ and the Councils have been unable to confirm where this is located.

In reviewing the circumstances, it is clear that the allocation of land to the east of Long Stratton in the AAP (2016) for approximately 1,800 dwellings was in order to aid the delivery of the Long Stratton bypass. The AAP seeks the delivery of at least 1,800 dwellings by 2026, with no more than 250 dwellings to be occupied until such time as the bypass is completed. Funding for the bypass, as detailed within the AAP, is to be from a number of sources including developer contributions (S106/CIL). Clearly the development itself is unable to fully fund the cost of the bypass, particularly as it is to be completed in advance of the majority of housing being completed. Of the total budget of £29m, it is understood that £10m has already been secured via the City Deal, but the remaining £19m has yet to be secured. The construction of the bypass had originally intended to start in 2020 with completion by 2022. More recent evidence suggests construction will now start in 2020.

In terms of the delivery of the 1,800 dwellings and associated bypass, two planning applications were made in January 2018 for the two principal elements of the overall development and the bypass. These applications however remain undetermined as they are the subject of a holding objection from the Highways Agency in view of the potential implications of the wider development on the operation of the A47 trunk road and in particular its junction with the A140. As such, it appears unlikely that the bypass will commence construction during 2020.

As such, it is apparent that the strategic allocation at Long Stratton has been severely delayed, as has progress on delivering the bypass. It is therefore unlikely that any meaningful housing numbers will be delivered from these sites within the next 5 years and it is difficult to see more than 100 dwellings being delivered by 2026 compared with the 1,800 envisaged in the 2016 AAP. Furthermore, there is serious doubt about whether any meaningful development will be delivered from this site by 2038 and probably significantly less than has been assumed when determining commitments from this particular allocation. However, the AMR 2018/19 does not provide sufficient detail to determine what has been assumed to contribute towards the overall housing commitment identified within Policy 1 and the ‘Analysis of Commitments’ referred to at paragraph 326 cannot be provided by the Councils at this time.

The implications of a failure to bring forward the strategic allocation at Long Stratton, alongside the delivery of the bypass have serious consequences for the settlement and the wider area in a number of ways which have serious social, economic and environmental consequences. In such circumstances, RSL consider that scope to bring forward a further housing site within the settlement should be given serious consideration. This would have potential benefits in helping to address short term local housing needs, provides scope to provide additional funding to address the funding gap for the bypass, whilst making a meaningful contribution to the wider delivery of housing within the Greater Norwich area in a highly sustainable location that aligns with the overall spatial strategy of the emerging Local Plan.

RSL are promoting land to the south of Flowerpot Lane, Long Stratton and further details of this site are provided in the separate Call for Sites submission in view of the fact the land has not been promoted previously. This is an unconstrained site which is well-related to the south western edge of the settlement and is available, deliverable and suitable. It offers scope for a smaller site for approximately 150 dwellings, or a larger scheme in the region of 700 dwellings. RSL would welcome the opportunity of discussing the site’s potential in greater detail with the authorities.

Part 2 – Site Allocations

In respect of Long Stratton, RSL wish to object to the fact that no allocations are proposed within the Part 2 Draft Plan. The reasoning for the Councils approach on this matter is that, despite the settlement being identified as a Main Town, there is already a total deliverable housing commitment for Long Stratton of 1,892 homes between 2018-2038.

As highlighted in our comments to Part 1, there are no deliverable planning permissions in respect of the sites allocated at Long Stratton within the Action Area Plan (2 planning applications are pending since January 2018). Paragraph 326 of Part 1 of the Draft Plan also confirms that evidence (which is not available) shows that the scale of the commitments means that part of the site allocated in the AAP will not be delivered until after 2038. It also confirms there may be additional capacity within the existing allocations but these are unlikely to be delivered until late in the plan period or beyond. Finally, it is also apparent that the bypass that is required to help deliver the existing commitments has been delayed and is not fully funded, which calls into question whether this is likely to further undermine the timely delivery of these existing sites unless the funding gap of circa £19m can be found. In the circumstances, RSL are concerned that the approach adopted is not sound, both in respect of the fact that the overall housing requirement for the authorities may not be achievable and that housing growth and the associated benefits within Long Stratton, one of the plan area’s most sustainable settlements, may not be achieved.

In considering ‘Reasonable Alternatives’, it is noted that the Part 2 document states “No Reasonable Alternative Sites”. However, the accompanying ‘Main Towns Assessment Booklet’ for Long Stratton concludes that following detailed assessment, 3 sites were identified as reasonable alternatives, but later in the document it states that in order to allow permitted housing sites in Long Stratton to be developed and existing service capacity to be clarified, there will be no new allocations in the GNLP. As such, it concludes that it considers there are no reasonable alternatives to this approach.

In light of the circumstances, in that the delivery of the allocated (but not permitted) sites is unlikely to occur fully during the Plan period, considering reasonable alternatives is clearly an alternative approach that should have been considered as part of the Plan-making process. This is particularly important if such alternatives are able to assist in helping to contribute towards addressing the current funding gap that exists in respect of the bypass, critical to facilitating planned growth and the associated benefits for existing residents and other road users.

In considering reasonable alternatives, RSL request that the land south of Flowerpot Lane, Long Stratton should also be considered in these terms. Whilst the site has not been previously considered through the HELAA, we enclose a copy of a completed Call for Sites submission form and OS Plan which provide further details of the site. These demonstrate the suitability, availability and deliverability of the site which is well-related to the urban area and capable of being brough forward in full during the Plan period. Importantly, it can also make a meaningful contribution towards funding the Long Stratton bypass, thereby helping to facilitate the delivery of wider strategic growth in the area.
We trust the above comments are of assistance and we welcome the opportunity to engage further during the preparation of the Greater Norwich Local Plan and/or to discuss our site in further detail with you. If in the meantime there are any queries or further information is required, please do not hesitate to contact me.

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22762

Received: 16/03/2020

Respondent: Mr Bryan Robinson

Representation Summary:

I support the position of CPRE Norfolk who has questioned the calculation for housing targets using the ONS statistics on household creation. It argues that these are out-of-date and are more recent statistics which show a slower rate of household creation. If this approach was adopted by the GNDP it would negate the need for any further need for new housing in the GNLP. Despite claims to the contrary (draft GNLP consultation p41), the GNDP is not using the most up-to-date evidence, as its figures are based on the 2014 ONS figures rather than those from 2016.

Not only are the increased housing targets unnecessary, increasing them further by allocating a 9% buffer seems absurd. What is more, windfalls, which are a proven reliable source of new housing, are not going to be counted towards the new target which is irrational.

A problem with the consultation is that phasing is not specifically offered as an option within the documentation. We feel this is a serious omission given the fact that 69 Parish and Town Councils within the GNLP area share the CPRE Norfolk view that a phased approach should be adopted. We urge the Greater Norwich Growth Board to seriously reconsider including phasing as the right approach to development.

There is no commitment in the GNLP to build new housing to the highest environmental standards, but rather follows minimal Government requirements. This is highly regrettable.

Full text:

For full representation, please refer to the attached document

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22783

Received: 16/03/2020

Respondent: Strutt & Parker LLP

Representation Summary:

The Delivery Statement set out at Paragraph 139 of the Draft Strategy sets out that the Plan will promote a pro-active approach to delivery through only allocating housing sites where a reasonable prospect of delivery can be evidenced, taking into account policy requirements. This approach accords with para 67 of the NPPF and is supported. In terms of providing flexibility and including a 9% buffer this accords with the objective of ensuring that a sufficient amount and variety of land can come forward. It is also recognised that it is proposed that the buffer will increase to 10% at the regulation 19 stage, when the village clusters allocations will be included. It is acknowledged that the plan aims to comply with the NPPF paragraph 68 requirement to accommodate at least 10% of housing requirement on sites no larger than 1 ha. However, given the uncertainty around the Carrow Works site (1,200 homes), it is recommended that where reasonable alternative sites exist in sustainable locations, additional smaller sites of up to circa 25 dwellings (the expected yield from a site of 1 ha) should also be allocated throughout the Plan area to increase certainty around delivery and supply, particularly in the early parts of the Plan period, supporting the Government’s objective of significantly boosting the supply of homes.

Full text:

For full representation, please refer to the attached documents.

Comment

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22846

Received: 16/03/2020

Respondent: Crown Point Estate

Agent: Miss Kate Wood

Representation Summary:

The Delivery Statement for Housing includes that “Additional opportunities will be provided, particularly for small scale growth at villages and on small brownfield sites across Greater Norwich, through windfall development.”

The additional opportunities need to be clarified in relation to small-scale housing at villages and windfall sites. We discuss this further under policy 7.5 below, but raise here that sites on the edges of villages should be encouraged, in order to ensure ongoing vitality and viability of village life whilst not undermining the wider spatial strategy. We consider that arbitrary numeric restrictions on housing should be replaced by policy wording that relates to the character and appearance of the locality of such sites.

Full text:

For full representation, please refer to the attached documents.

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22873

Received: 13/03/2020

Respondent: Bidwells

Number of people: 2

Representation Summary:

Support, with comments
The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered, fully accords with paragraph 67 of the NPPF.
Whilst the submission of Delivery Plans as part of a planning application is supported the documents need to recognise that there may be unforeseen material changes in circumstances, which could impact the delivery of an allocation. However, to guard against non-delivery, particularly in relation to the potential failure of larger strategic sites in the Norwich urban area to
come forward, a minimum buffer of 10% should be identified. Indeed, the draft GNLP states on page 45 that the Regulation 19 version of the Plan will aim to provide a minimum buffer of 10% (at least 250 further homes), which is likely to be provided through a combination of additional sites proposed through the consultation, and the contingency sites.
The identified buffer will help maintain the supply and delivery of housing, in accordance with the NPPF and specifically the Government’s objective of encouraging authorities to consider more growth than required to meet local housing need, particularly in locations where there is potential for significant economic growth, such as the Cambridge Norwich Tech Corridor.

Full text:

Please find attached a Regulation 18 Stage C Consultation Representation in relation to GNLP0125, Land West of West Lane, Horsham St Faith.

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22894

Received: 13/03/2020

Respondent: Bidwells

Number of people: 2

Representation Summary:

Support, with comments.
The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered, fully accords with paragraph 67 of the NPPF.

As has been outlined within the Representations for the preferred allocations of GNLP0133-C and GNLP0133-E, both sites are suitable, available, achievable and viable, and are deliverable for student accommodation. The submission of Delivery Plans as part of a planning applications is supported. The documents do, however, need to recognise that there may be unforeseen material changes in circumstances, which could impact upon the delivery of an allocation. The Council’s approach to providing choice and flexibility in terms of housing growth by accommodating 9% more homes than are needed, along with contingency sites, is supported. This buffer will help maintain the supply and delivery of housing, which includes purpose built student accommodation, in accordance with the NPPF.

Full text:

Please find attached a Regulation 18 Stage C Consultation Representation, in relation to GNLP0133-E, Land at UEA Grounds Depot Site, Bluebell Road.

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22931

Received: 13/03/2020

Respondent: Bidwells

Number of people: 2

Representation Summary:

Support, with comments.
The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered, fully accords with paragraph 67 of the NPPF.

As has been outlined within the Representations for the preferred allocations of GNLP0133-C and GNLP0133-E, both sites are suitable, available, achievable and viable, and are deliverable for student accommodation.
The submission of Delivery Plans as part of a planning applications is supported. The documents do, however, need to recognise that there may be unforeseen material changes in circumstances, which could impact upon the delivery of an allocation.

The Council’s approach to providing choice and flexibility in terms of housing growth by accommodating 9% more homes than are needed, along with contingency sites, is supported. This buffer will help maintain the supply and delivery of housing, which includes purpose built student accommodation, in accordance with the NPPF

Full text:

Please find attached a Regulation 18 Stage C Consultation Representation, in relation to GNLP0133-D, Land between Suffolk Walk and Bluebell Road.

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22950

Received: 13/03/2020

Respondent: Bidwells

Number of people: 2

Representation Summary:

Support, with comments.
The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered, fully accords with paragraph 67 of the NPPF.

As has been outlined within the Representations for the preferred allocations of GNLP0133-C and GNLP0133-E, both sites are suitable, available, achievable and viable, and are deliverable for student accommodation.
The submission of Delivery Plans as part of a planning applications is supported. The documents do, however, need to recognise that there may be unforeseen material changes in circumstances, which could impact upon the delivery of an allocation.

The Council’s approach to providing choice and flexibility in terms of housing growth by accommodating 9% more homes than are needed, along with contingency sites, is supported. This buffer will help maintain the supply and delivery of housing, which includes purpose built student accommodation, in accordance with the NPPF.

Full text:

Please find attached a Regulation 18 Stage C Consultation Representation in relation to GNLP0133-C, Land North of Cow Drive (the Blackdale Building, adjoining Hickling House and Barton House).

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 22985

Received: 13/03/2020

Respondent: Bidwells

Representation Summary:

Support, with comments.
The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered, fully accords with paragraph 67 of the NPPF.
As has been outlined within the Representations for the preferred allocations of GNLP0133-C and GNLP0133-E, both sites are suitable, available, achievable and viable, and are deliverable for student accommodation.
The submission of Delivery Plans as part of a planning applications is supported. The documents do, however, need to recognise that there may be unforeseen material changes in circumstances, which could impact upon the delivery of an allocation.

The Council’s approach to providing choice and flexibility in terms of housing growth by accommodating 9% more homes than are needed, along with contingency sites, is supported. This buffer will help maintain the supply and delivery of housing, which includes purpose built student accommodation, in accordance with the NPPF.

Full text:

Please find attached a Regulation 18 Stage C Consultation Representation in relation to GNLP0133-B, Land adjoining the Enterprise Centre at Earlham Hall (walled garden and nursery).

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 23013

Received: 13/03/2020

Respondent: Bidwells

Representation Summary:

Support, with comments

The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered, fully accords with paragraph 67 of the NPPF.

Whilst the submission of Delivery Plans as part of a planning application is supported the documents need to recognise that there may be unforeseen material changes in circumstances, which could impact the delivery of an allocation.

However, to guard against non-delivery, particularly in relation to the potential failure of larger strategic sites in the Norwich urban area to come forward, a minimum buffer of 10% should be identified. Indeed, the draft GNLP states on page 45 that the Regulation 19 version of the Plan will aim to provide a minimum buffer of 10% (at least 250 further homes), which is likely to be provided through a combination of additional sites proposed through the consultation, and the contingency sites.

This identified buffer will help maintain the supply and delivery of housing, in accordance with the NPPF and specifically the Government’s objective of encouraging authorities to consider more growth than required to meet local housing need, particularly in locations where there is potential for significant economic growth, such as the Cambridge Norwich Tech Corridor.

Full text:

Please find attached a Regulation 18 Stage C Consultation Representation in relation to GNLP0520, Land South of Norwich Road, Hingham.

Attachments:

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 23071

Received: 16/03/2020

Respondent: Orbit Homes

Agent: David Lock Associates

Representation Summary:

We support the Delivery Statement and consider it a proactive and positive approach to securing
the growth required within Greater Norwich. As has been previously discussed above, however,
we do not consider that the priorities contained therein are achievable as the policy basis for them
is not evident within the plan. Crucially, we question how GNLP consider the Plan supports the
Tech Corridor to become an increasingly important axis to other significant growth corridors?

Furthermore, the Delivery Statement suggests the plan only allocates sites with a reasonable
prospect of delivery. Orbit has excellent local knowledge and experience of the market and do
not consider that the annual delivery rates that would be derived from the total commitments and
allocations, for instance in the ‘growth triangle’ (approximately 670 homes per annum) over 20
years is achievable in the context of what the market can deliver and support. We appreciate
that there are already substantial commitments in this location but question the logic of a plan
which seeks to allocate further homes and apply such annual delivery rates to an area which has
previously experienced slower than anticipated delivery rates? The delivery model of Orbit,
whereby Orbit themselves construct a significant proportion of the homes, would demonstrate
resilience against the delivery risks of other strategic sites that are controlled by multiple volume
housebuilders. Orbit’s availability of and access to finance also mean that delivery is not impeded
by significant upfront infrastructure costs.

Full text:

For full representation, please refer to the attached documents.

Object

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 23103

Received: 31/03/2020

Respondent: Salhouse Parish Council

Representation Summary:

This states that ‘this plan also provides choice and flexibility by ensuring there are enough committed sites to accommodate 9% more homes than “need”.’ CPRE Norfolk disagrees that such a high level of sites should be provided within the GNLP. As a starting point please refer to our response to Q3 where we argue that the insistence of the Government to use the 2014 National Household Projections should be challenged to ensure that the most up-to date figures are used instead. In addition, by proposing not to include windfalls in the buffer the over-allocation of unnecessary housing will be compounded further.
It is very disappointing that there is no mention of phasing as an option within the Draft Plan and Housing Delivery Statement, as this would help to prevent the worst excesses of unnecessary development. 69 Parish and Town Councils in Broadland and South Norfolk (over 38%) have supported CPRE Norfolk on this issue and have signed a pledge to this effect. With this groundswell of grassroots opinion making such a strong case, we urge the GNDP in producing the GNLP to consider phasing seriously as the most reasonable way forward.

Full text:

Please see attached for full submission
Note that Salhouse Parish Council largely endorses the comments by CPRE, and so we have integrated these comments into our response.

Attachments:

Support

Draft Greater Norwich Local Plan – Part 1 The Strategy

Representation ID: 23130

Received: 16/03/2020

Respondent: Hopkins Homes

Agent: Bidwells

Representation Summary:

The requirement that sites should only be allocated for housing where, having regard to policy requirements, there is a reasonable prospect that housing can be delivered, fully accords with paragraph 67 of the NPPF.
Whilst the submission of Delivery Plans as part of a planning application is supported the documents
need to recognise that there may be unforeseen material changes in circumstances, which could impact
the delivery of an allocation.
The identified buffer in relation to housing numbers will help maintain the supply and delivery of housing,
in accordance with the NPPF and specifically the Government’s objective of encouraging authorities to consider more growth than required to meet local housing need, particularly in locations where there is
potential for significant economic growth, such as the Cambridge Norwich Tech Corridor.
However, to guard against non-delivery, particularly in relation to the potential failure of larger strategic
sites in the Norwich urban area to come forward, a minimum buffer of 10% should be identified. Indeed,
the draft GNLP states on page 45 that the Regulation 19 version of the Plan will aim to provide a minimum
buffer of 10% (at least 250 further homes).

Full text:

Please see attached for full submission and supporting documents.
As outlined in the attached submission, the site is suitable, available, achievable and viable, and is therefore deliverable within the plan period.
Development in this location would represent sustainable development, as defined within the National Planning Policy Framework. Aylsham, as a Main Town, with the fourth highest level of shops and services outside Norwich, is already acknowledged as a highly sustainable location for residential growth, as evidenced through the significant quantum of development that has been approved in the last decade, and the attached text demonstrates that this specific site is a suitable location for further development in all respects.
Economically, residential development here in the plan period would help sustain and enhance local
services and facilities, and would also provide employment opportunities during the construction period.
Socially, the scale of development envisaged is such that it will enable the creation of a strong, vibrant and
healthy community, with easy access to existing and planned local services and facilities, as well as onsite
open space. A wide mix of dwelling types, sizes and tenures will be provided to meet local needs, and
CIL payments will ensure the provision of the necessary health and cultural facilities. The site is located
in close proximity to established communities in Aylsham, which should assist in achieving social
integration between the existing and new residents.
Environmentally, the site is located close to a range of services and facilities, and enjoys good access to
sustainable transport options providing access to the extensive array of facilities and services available
within Norwich and further afield. Residents will be able to meet their day-to-day needs easily and without
the need to use their car, assisting in reducing pollution and minimising the contribution to climate change.
On this basis, the site should be taken forward as an allocation, and is capable of making an important
contribution to the planned growth of the Greater Norwich Area in the period to 2036.